HomeMy WebLinkAboutInspector's Daily Reports - 9/21/2016 INSPECTOR'S DAILY REPORT �1M ,`:#2 Duvall Ave NE Pavement Preservation Project I JI Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) iIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Page 1 of 3 "03854 708-Inspector's Daily Reports 09/21/2016 .•_ ednesday, September 21, M2016 Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm 1= 3:30 Weather: Time Temp Sky Time Temp Sky 7:30am 48 Clear 3:00pm 67 Clear ID Contractor Representative/Title ID Contractor Representative/Title A Icon Materials Bill Johnson/ Foreman F ............-.....-- ... --....__..__..................------....-...-............................................_........_.........._................................................_.._..... ....................-- -----..._._._..----_. _....................---------........_..........................-...-._............ B AGS Marla Dawson/TCS G ---- -- -- ----.................................--- -..._..............-..............---_. ........_.. ....- ---- — - ---------- ---- C Caliber Concrete Jeff Segette/Foreman I ...................... _.__......_..__...._..- — --- --- --....._........_.._...._.._..............._._......_.................._.......--------..................... D NW Traffic Scott Hoefling/Foreman J ........................................................................................................................................................._................................................................................................................................ ........................................._.................................................._.........-......_................................................................................................................._.......................... E Cascade Utilities Ken Mann/Owner K Work Activity ID;; Description Location Crew •Equip A Contractor supervision All 2M F250 P/U, JD310 backhoe B Traffic Control All 4F, 1M F150 P/U C Placing ped ramps Sta. 34+64,35.5L, 22+85, 4M 2 F450 U/T 37.95L, 22+86, 47.61L, 23+20, 47.67R D Applying channelization All E Adjusting Utilities All 5M F450 U/T W/Comp, F450 D/T, Bobcat skid steer loader Traffic Control _ as Traffic Control Req'd Today? Yes _ _—_ Was WZTC per approved TCP? Yes Comments: Material Delivery visual Inspection NeilJnit pers.ROMJ�PL4a r Talal F1elIx 9/21/2016 In cto�t's Signature Date i 9 2SLP Revie d B ( gnature) Date INSPECTOR'S DAILY REPORT ` Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 Onsite Testing In/Out of i.g�me Material Descri tion i.ocation/�ff�et Con�forrnance None Diary i m Discussion Icon is preparing the subgrade at the SW corner of 6th. AGS is staging equipment for the right lane closure and 7:30am Caliber is preparing for the day. ... ........_._. ... . .......... .._.... _....._.....---- -- - .......----------....._............._.. .. ................_......_........_...._.._.........._....._.....------._...__..... .............. Caliber is removing the plastic from the domes at 91h. The sidewalk at the E corner of Th has been vandalized, 8:OOam Caliber has attempted to repair the damage. 8:30am GS is closin.g..... P9 _._..........._.._.......__._....._............_.the southbound curb lanes at 6th and Caliber is preparing for concrete on all corners of 6th. ...................._................................................................................ ...................._......._...._.............._.._................_...._.......__._......................_............._......._._.._ ..P......_.......... ......._....__......................................................................................................................-----............._...... 9:OOam Cascade Utilities is on-site to begin adjusting utility covers at Sta. 47+OOL +/- -.._._..._..............._.............--.._....._.._._.._.......__......._._........__.. ......................... ... --- - .......................................__...................................................._.................._.._.._........_...._..._......._......_...__...—— q Cascade continues at Sta. 36+OOL +/-, I have informed the crews that a concrete collar is required around all valve cans. Icon continues to prepare the subgrade at the SE corner of 6th. (10:15AM) Miles is on-site with 10:OOam concrete for the walks at 6th 11:OOam Caliber has finished placingthe walks on the W side of 6th, Cascade continues to excavate for the castings_ ...._...._.._.................................................................................................................._.... ....................._ .............................................._........._........................................................................................................................................................................................................................................_--..._............_......._...- .._..._ Mark Eichelberger was on-site during our conversation we noticed that another car had driven through the median at Sta. 29+00-33+00. It appears that the irrigation system has been damaged again along with some of the 12:OOpm plantings. The soil appears to be dry__ _ ...._.._.........................._....._.............._._...._..-----._..._.._._.._..... ----._...---................................................................_......... --- Cascade is placing the HMA around the manholes at 8th. The concrete rings have been placed around the valves and is setting. The approved mix design is 12164230, the mix design used today is 12144250. 1 have directed 1:OOpmCascade to only p9 use the roved mix design on future work. _.... .._._._...................................................._....................... ............._.............._......... .P......................................................... ..............................._....__.............................................................._.............................................................._._.........._...._.........._.........._....._........................_..............._ ............ Caliber continues to place finish on the walks at the SE corner of 6th. Cascade continues to place HMA; all edges 1:30pmof repairs need to be sealed. AGS has flaggers stationed at areas where HMA and concrete have been placed. 2:OOpm Cascade is finished for the day. 2:30pmCaliber has finished for the day. ....-..........................................._....................................-......................_....................................................._........ ..............._....................._.....-- .....__.._......................................-----...._.._.._.................................................................................................................._..........._............................_........_....- .._..__._... GS is removing T/C. One of the residents of Blueberry Place walked around the barriers and onto the freshly 3:OOpm placed concrete at their corner with his dog leaving footprints in the ramp. We have tried to repair the damage. 3:30pm Work has finished for the day. ...................... ......................................................._............._..._..------..._.._...._. Tad F,,.iX 9/21/2016 Inspector's Signature Date Q it,(0; (M—P INSPECTOR'S DAILY REPORT r' Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 3 of 3 4 Subject: Damaged ped ramp Location: ` - - SE corner at NE 7th St. Comment: ;N Caliber has attempted to repair ®�e' graffiti in the ped ramp. Y fi� K Subject: Utility Adjustment ........................................................................................................................................................................................................ Location: a Sta. 45+001- +/- Comment: Cascade Utilities is adjusting the utilities in the southbound curb lane. Subject: Ped Ramps Location: j SW corner at NE 6th St. ' ........................................:.......... ............................................................................................. * � Comment: r�_';: Caliber is placing concrete for the ped ramps and sidewalks. FoaW Frei/ 9/21/2016 Inspector's Signature Date