HomeMy WebLinkAboutInspector's Daily Reports - 9/21/2016 INSPECTOR'S DAILY REPORT
�1M ,`:#2 Duvall Ave NE Pavement Preservation Project
I JI
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
iIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Page 1 of 3
"03854 708-Inspector's Daily Reports 09/21/2016 .•_ ednesday, September 21,
M2016
Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm 1= 3:30
Weather: Time Temp Sky Time Temp Sky
7:30am 48 Clear 3:00pm 67 Clear
ID Contractor Representative/Title ID Contractor Representative/Title
A Icon Materials Bill Johnson/ Foreman F
............-.....-- ... --....__..__..................------....-...-............................................_........_.........._................................................_.._..... ....................-- -----..._._._..----_. _....................---------........_..........................-...-._............
B AGS Marla Dawson/TCS G
---- -- -- ----.................................--- -..._..............-..............---_. ........_.. ....- ---- — - ---------- ----
C Caliber Concrete Jeff Segette/Foreman I
...................... _.__......_..__...._..- — --- --- --....._........_.._...._.._..............._._......_.................._.......--------.....................
D NW Traffic Scott Hoefling/Foreman J
........................................................................................................................................................._................................................................................................................................ ........................................._.................................................._.........-......_................................................................................................................._..........................
E Cascade Utilities Ken Mann/Owner K
Work Activity
ID;; Description Location Crew •Equip
A Contractor supervision All 2M F250 P/U, JD310 backhoe
B Traffic Control All 4F, 1M F150 P/U
C Placing ped ramps Sta. 34+64,35.5L, 22+85, 4M 2 F450 U/T
37.95L, 22+86, 47.61L, 23+20,
47.67R
D Applying channelization All
E Adjusting Utilities All 5M F450 U/T W/Comp, F450 D/T,
Bobcat skid steer loader
Traffic Control
_ as Traffic Control Req'd Today? Yes _ _—_ Was WZTC per approved TCP? Yes
Comments:
Material Delivery
visual Inspection
NeilJnit pers.ROMJ�PL4a r
Talal F1elIx 9/21/2016
In cto�t's Signature Date
i 9 2SLP
Revie d B ( gnature) Date
INSPECTOR'S DAILY REPORT `
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 3
Onsite Testing
In/Out of
i.g�me Material Descri tion i.ocation/�ff�et Con�forrnance
None
Diary
i m Discussion
Icon is preparing the subgrade at the SW corner of 6th. AGS is staging equipment for the right lane closure and
7:30am Caliber is preparing for the day.
... ........_._. ... . .......... .._.... _....._.....---- -- - .......----------....._............._.. .. ................_......_........_...._.._.........._....._.....------._...__..... ..............
Caliber is removing the plastic from the domes at 91h. The sidewalk at the E corner of Th has been vandalized,
8:OOam Caliber has attempted to repair the damage.
8:30am GS is closin.g..... P9
_._..........._.._.......__._....._............_.the southbound curb lanes at 6th and Caliber is preparing for concrete on all corners of 6th.
...................._................................................................................ ...................._......._...._.............._.._................_...._.......__._......................_............._......._._.._ ..P......_.......... ......._....__......................................................................................................................-----............._......
9:OOam Cascade Utilities is on-site to begin adjusting utility covers at Sta. 47+OOL +/-
-.._._..._..............._.............--.._....._.._._.._.......__......._._........__.. ......................... ... --- - .......................................__...................................................._.................._.._.._........_...._..._......._......_...__...——
q
Cascade continues at Sta. 36+OOL +/-, I have informed the crews that a concrete collar is required around all
valve cans. Icon continues to prepare the subgrade at the SE corner of 6th. (10:15AM) Miles is on-site with
10:OOam concrete for the walks at 6th
11:OOam Caliber has finished placingthe walks on the W side of 6th, Cascade continues to excavate for the castings_
...._...._.._.................................................................................................................._.... ....................._ .............................................._........._........................................................................................................................................................................................................................................_--..._............_......._...- .._..._
Mark Eichelberger was on-site during our conversation we noticed that another car had driven through the median
at Sta. 29+00-33+00. It appears that the irrigation system has been damaged again along with some of the
12:OOpm plantings. The soil appears to be dry__ _
...._.._.........................._....._.............._._...._..-----._..._.._._.._..... ----._...---................................................................_.........
---
Cascade is placing the HMA around the manholes at 8th. The concrete rings have been placed around the valves
and is setting. The approved mix design is 12164230, the mix design used today is 12144250. 1 have directed
1:OOpmCascade to only p9
use the roved mix design on future work.
_.... .._._._...................................................._....................... ............._.............._......... .P......................................................... ..............................._....__.............................................................._.............................................................._._.........._...._.........._.........._....._........................_..............._ ............
Caliber continues to place finish on the walks at the SE corner of 6th. Cascade continues to place HMA; all edges
1:30pmof repairs need to be sealed. AGS has flaggers stationed at areas where HMA and concrete have been placed.
2:OOpm Cascade is finished for the day.
2:30pmCaliber has finished for the day.
....-..........................................._....................................-......................_....................................................._........ ..............._....................._.....-- .....__.._......................................-----...._.._.._.................................................................................................................._..........._............................_........_....- .._..__._...
GS is removing T/C. One of the residents of Blueberry Place walked around the barriers and onto the freshly
3:OOpm placed concrete at their corner with his dog leaving footprints in the ramp. We have tried to repair the damage.
3:30pm Work has finished for the day.
...................... ......................................................._............._..._..------..._.._...._.
Tad F,,.iX 9/21/2016
Inspector's Signature Date
Q it,(0; (M—P
INSPECTOR'S DAILY REPORT
r' Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 3 of 3
4 Subject:
Damaged ped ramp
Location:
` - - SE corner at NE 7th St.
Comment:
;N Caliber has attempted to repair
®�e' graffiti in the ped ramp.
Y
fi� K Subject:
Utility Adjustment
........................................................................................................................................................................................................
Location:
a Sta. 45+001- +/-
Comment:
Cascade Utilities is adjusting the
utilities in the southbound curb lane.
Subject:
Ped Ramps
Location:
j SW corner at NE 6th St.
' ........................................:..........
.............................................................................................
* � Comment:
r�_';: Caliber is placing concrete for the
ped ramps and sidewalks.
FoaW Frei/ 9/21/2016
Inspector's Signature Date