INSPECTOR'S DAILY REPORT
,Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004 Fed Aid No: STPUL-1113 003
II IIII I II I II II II III I II II II II II I IIII I I III III II Page 1 of 3
Ispector:
"03854 708-Inspector's Daily Reports 09/20/2016` Tuesday, September 20,
2016
Todd Freih Inspector's Shift Hrs: 7:30pm To3:00pm
ather: Time Temp Sky Time Temp Sky
7:30am 50 Clear 3:00pm 70 Clear
• WNW:
IDContractor Represeritativelr7itle, ID.: " . "Contractor x. 'Representative/TitI6
A Icon Materials Bill Johnson/ Foreman F
.........._......_....................................................................._............_..................---._................................................................................_................................................................... .............................................................................._........................................ .
B AGS Marla Dawson/TCS G
........_........_............................................._.........- ..............._.._._............................................._..__......._...................................._....._............................................................... _...................................................................................................
......................__.........._....................................................._............
C O'Bunko Chris Aire/Surveyor I
..............................--............................_..................................._.........................._......................-.................................................._._.......................................-................................. ......................................_..................__._...................................
D Caliber Concrete Jeff Segette/Foreman J
.........................
........................................................
_.._._..._.. .........._...........................................
.......................
........................................
..........
.............
...
E K
,Work Activity
ID " Description,
-Lscation _�
Crew,, E ulo .
A Placing asphalt ramps at All 2M F250 P/U, JD310 backhoe
9th and preparing base
for walks.
B Traffic Control All 4F F150 P/U
C Surveying reference All 1M Chev 1500 P/U
points for channelization
D Placing forms for ramps NE 8th St. 4M 2 F450 U/T
and walks
Traffic Control
Was Tr ffi
a cControl Re d Toda Yes Was WZT
C era roved TCP. YES
Req
'd
Delivery
Der ,;a f tIt1M Q}Spillet
prPUL •� Np '50L ,
_
!N ,.
Todd fwe4 9/20/2016
Insp ctor' Signature Date
Reviewe B (Signature) Date
., INSPECTOR'S DAILY REPORTi, .
tat Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 3
In/Owt of
"imv IlAateria�E Cies 'ptron Locati�r�4Offs i C�nfiormance
None
,.���: (Discussion
MINI
7:30am Crews are preparing for the day
........................... ..... __._.._............... - - _
8:OOam GS is sta in a ui ment to close lanes for concrete. O'Bunko is performing survey for the channelization.
................................................................................._........ ......g _G.........P................. ........................................................................................ ........................_........... ............... ...................................................................._._....._.......
Caliber is placing forms and cutting the curb that's to be replaced at 6th. No water was being used and I directed
8:30am themto stop cuttin..9.wit.......................... .................................._......................................................................................................................................................................................................._..............................._..._........._.............................._........................................._.........................................
Icon is removing the section of curb at the NW corner of 6th. KC Testing is on-site at 8th to perform concrete
testing. Caliber has relocated to 8th and are waiting for Miles to deliver concrete. (9:15am) Miles is on-site at Sta.
9:OOam 36+OOL +/-for ramps at 8th & 7th. (9.30am) NW Traffic is on-site.
......................................................._..................................._............_.._.................. ................................................................_......................................._._._.._._................................................................._...---...._........................................................................................._....._..._................._
Caliber has finished placing concrete for the ramps at 8th and the ped curbs at 7th and are preparing to place
..................................................._....__.....................................----..._................................_.__......................................................................................................................................................._----._..._.._....................------._....._...._...........................................__........A. .......
11:OOam Caliber is sta in at 7th waiting for Miles. O'Bunko continues with survey.
...._...._..............................................._.....---........_ .g...._.g......._...................._... ..... .......................... ................................. - - _. ........_............._...
11:30am Milesis on-site at the SE corner of 7th
_..........
............._.....
.........................._..__.....----..............................._............_..._......................................................................................................_.__._........._..........................._...._._.__.._..............._.._._._._......._.._......................................._...._.........................----...._..._.........
. __..._..........................
Icon has a paving crew on-site to place the asphalt ramps at 9th. Caliber has finished replacing curb at 6...tn and
are removing forms from the curb at 6th. I have notified the shops that we will be needing the castings tomorrow
12:30pm or replacin .................. ............................... .................................... _....._.......... ..............1 .............................................
1:30pm Caliber is placin forms for the walks at the NW corner of 6th. Icon is placing the asphalt ramps at 9th.
...................11.1 .. ................ ......._.............................._g_.._._..................... .................... .......
2:00 m Icon has relocated to the median at Sta. 14+71 to place asphalt. _
P__ .._...._................................._...._..._............. ..................._........................ ............................................_........_........._. _.___.__.._........---...__........_..._.............................._...._....__.................._-........._.........._........................_- -
Icon has finished placing HMA and O'Bunko is finished surveying. AGS is removing T/C around the median a
.
:30.Pm Sta. 14+71.
..
........... ........._........._...................._........................................................................._............................................................................................................................................_......_._..................................................................................... ._. .............._..........
3:OOpm GS has finished removing T/C and work has finished for the day _..._..._....................................._........................_.._._.__.._.........._.............................._._...____.._..............................._...___
...._............................................................._.............................................................................................. .................................................................................................._...............................
................_..................__._......................................._.............................................._..._........__......._..............................._._._._............................................................................................._........__..._................................................_......................._........_.__.._..__............................._....._
..............................................................._............_........._..................._....._......_........_..............................................._....._..........................................._...._............................................_._................................_..........................._................_......._..._...._.._....._...........................__........__.....
..................................................._._................................................_.._........_.._............................................................................................................................................................................................._.............---..........................................._......_..........................................__.._.......__.......................
................................................................................................................................................................_......_........................................................................................._._.._.._...._._................................_.....__............_........................................................................._.......---.._._.................................._......_.
jc(d fi�ei/c 9/20/2016
Inspector's Signature Date
INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 3 of 3
if
Subject:
Ped Ramps
Location:
' f.a Sta. 34+25R +/-
Comment:
Icon is preparing the subgrade for
a - concrete.
.. .
09/�.6i!
Subject:
Ped Ramps
Location:
Sta. 36+OOL +/-
Comment:
y b
Caliber is placing concrete for the ped
ramp at NE 8th St.
Subject:
Ped Ramps
.........._.._....._.._..- ._........-----.....-- ----...............-- ...............
Location:
,
Sta. 43+75R +/-
, .................. ....................................._.....................................
Comment:
Icon is placing the asphalt ramps at
NE 9th St.
Tad 15eA 9/20/2016
Inspector's Signature Date