Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 9/19/2016 • c:;jt.,,t�� INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) IIIIIIII�II�III�IIIIIIIIIII�I�I�I�IIIIIIIII�IIII�IIII�IIIII�I�I�IIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Page 1 of 3 Daily Information J '03854 708-Inspector's Daily Reports 09/19/2016IIIII Monday, September 19, - 2016 Inspector: Todd Freih Inspector's Shift Hrs: 7;30pm To 3:30pm Weather: Time Temp Sky Time Temp Sky 7:30am 62 Rain 3:OOpm 70 Ptly Cldy ID Contractor Representative/Title ID Contractor Representative/Title A Icon Materials Bill Johnson/ Foreman F _._._._.._._.._ ------- - -------....._...__....._....._....._....__.........__._...._...... .......-..........._.............-_..._.__._....---._..._... ------.. _.._..--..... B AGS Marla Dawson/TCS G --. --- __-._..__............ — C O'Bunko Chris Aire/Surveyor I _......._......_....--..._._._..- ------.._._..__......._..__.._._.__...—. _..- -- ...._....._.__..... -- _..._...._.__.._.........----...- ---- — _ D Green City Frank Fa J laniko/Owner E Caliber Concrete Jeff Segette/Foreman K Work,Activity ID Description Location i Crew Equip A All 2M F250 P/U, JD310 backhoe B Traffic Control All 4F, 1M F150 P/U C Surveying reference All j 1 M Chev 1500 P/U points for channelization D Placing bark in the Sta. 18+50-22+00 medians E Placing forms for ramps NE 81h St. F450 U/T and walks Traffic Control Was Traffic Control Req'd Today? Yes__..._...............-.__..-._....._._..._.._...._....._..__..........-._.._Was WZTC per„approved TCP? Yes -..........._..___...____._.......................... Comments: Material Delivery t `txI'w^�!Y^ �Y c �u9,& q. ,� ant R dYA'"T` '*� c'-UN t e' s u15U8lalnspecliiOri h tly� a a D@SCSI tlon''w. ��, ,F�l,,, aap ,> -t-lay . �Wmt per R`OM/QPL? . , Tc(cl 15.114 9/19/2016 In ect 's Signature Date Revi T e (Signature) Date d ; INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 Onsite Testing 157,0020f' Mme Material Description Location/Offset Conformance None ime .............................................................. .............................. ..................................................................................................... ................................................................................................. ................................... I Discussion O'Bunko is on-site to perform surveying for reference points AGS has staged T/C equipment to close 7:30am southbound lane adjacent to the median at Sta. 18+50-22+00. Caliber is on-site 8th St. to begin placing forms. AGS has a flagger dedicated to the surveyor. Icon is removing — 7--at 8th excess crushed surfacinq from the walks at 8th to establish qrade for the ramps and walks. Caliber'' , * has finished,-- forming**' both sides of Stn and has relocated__­­ t_o t--h,e west s_i_de_ a-t-,7th to form the ped curbs. Icon ................ 9:00am is performinq com paction on the subqrade. ................................................................................................... Green City has completed placing the mulch in the median at Sta. 18+50-22+00 and are finished for the day. 10:00am Caliber has completed the ped curbs at 7th. ............................................................................... ...... Caliber has relocated to the ramps at 6th to continue placing forms. Miles is on-site with the concrete and Caliber 1 1:00am is placinq the flatwork on the SW corner of 8th. ........... placing........................­­.................................................................................................................................................................................. .......­_...____....__­.­_­___------------------ ............._­......................... ....... I have directed the crews to place expansion joint across walks in line with the joints on the catch basins. Caliber continues to place concrete for the flat work at 8th. I have directed Caliber to send the remainder of the load back 12:00prn due to batch time. ...................... ....... ....................................................­­_­....................................................... ........... 1:00pm Caliber has finished placing and are applying E�!� 0 the ramps. O'Bunko continues surveying. -..................... L _t ........................................surveying_—_ 2:00pm Caliber is cleaninq.the concrete off the road and removinq plastic from the domes n 91h. ............................................................................................................................. ­­­ I..............................................................................................................................................................I....................................................................................................................................................................................................................... 3:00pm Work has finished for the .....................­­­­.......................................................I...........................................................I......................................................I............................................................ .............................___............................................ ............................................................................................................._.­____.____..__..­._.................................................... .................................................................................................................................................................................................. ........................................................................................................................................... ........... __........... .......................................................­ ................................................................................................................................................................................................................................... ...........................................................................................................1-........................................................................... ....................................................................­­­ ­..................................­.._._..____......_.._._._....................................................................... ........... .......................................I................. .............. ................................................ ................................................... ..................................................­­­.............................................................................................. ................................................ .................11...................I .......... ........................................................................................................................................................................................................ ...................................................................­­­­.............................................................. .......................................................................................................................................................................................................................................................................................-................................................................................................................ 9/19/2016 Inspector's Signature Date • Rampsr wi -Y T�-Zai°0�:•'�'�e,'�,, t s. b,'w--.rte + NE Ask 8 th St. . ` A .41� , , , may,:• r�.. .�.. Comment: Caliber is setting forms for the ped th St. C „ ramps at NE • • - Ped Curbs 441" • L 1 -lex, • � ,' V' � - st side of Duvall at NE 7 th St. • - Caliber • forms for ped j t y Subject: Sidewalk lz NW corner of NE 8 th St. • - Caliber • • concrete • - Ck•J�Vj