- `03854 708-Inspector's Daily Reports 09/15/2016" ED
hursday, September 15,
- 2016
Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To
Weather: Time Temp Sky Time Temp Sky
7:30am 50 Cloudy 3:00pm 72 Clear
ID Contractor ` Representative/Title ID Contractor Representative/Title
A Icon Materials Bill Johnson/ Foreman F
............................................................._..._..................._......__._..__..._................................................................................
B AGS Jessie Dillard/TCS G
............................_......._.........................._..........__..............................................................................................................
..........._......
C Green City Jesus Garnica/Foreman I
-----------...._...................._...._........_................_........._......__.......................... ._......................_..........----.....................--...-...................................._..............
- —
D NW Traffic J
.................................__.................................................._....._............................................................................................................_.._.._..__.............................__............................ ..................................................................................................................................................................._....._.............._........_......_....._.............................................
E K
Work Activity
ID Description Location Crew Equip
A Supervising Contractors All 1 M F250 P/U,
B Traffic Control All 3F, 1M F150 P/U, Arrow Board
C Landscaping the medians Sta. 18-22+00, 29+50-33+00 +/- 5M F150 P/U, F450 U/T
D Placing Channelization No work Performed Isuzu U/T
'Traffic Control
Was Traffic Control Req'd Today? _ Yes Was WZTC per approved TCP? Yes _
Comments:
Material Delivery
' PI! ` ` 1lltLo/isua ( ?nif Rs�De
7-oaV Fi°ei/c 9/15/2016
Ins a tor's Signature Date
"te a (Signature) Date
INSPECTOR'S DAILY REPORT.
(ppn �� Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 3
�Onsite Testing
In/Out of
ime Material Descri tion LocationlOffset Conformance
None
l ime Discussion
7:30am GS is on-site re arin to lace T/C at the median Sta. 29+50-33+00 +/-.
._.._................._....._...-------._......._....._...-......................__..-P................._9..._..._.._.p..----._._......_...._.._....................................._..................................................................................._..__.........__...................._.._.............._.._._..._...----..._.........................__.............._.................._..._..__..-_._........_...._..---
8:3.0_a_m AGS has closed the left lanes near the medians to create a clear space for Green City.
Green City is on-site to continue with plantings in the median at Sta. 29+50-33, NW Traffic is on-site to begin
9:OOam lacin channelization at the south end of the roject.
.....................................p............_........g..............................__....---..._..._..__......._......_.._..............._......__.....--.._................................_.......P........J._.._........_..............................................._.............................................._..._.........-...---._...........................---..._..............._...__.._.....-........................-........................
1.0_:0__Oa_m__NW is performing layout, G/C continues planting. -_
_ _....._..---- -..._........_._..__.._.... __.._.._.._...__...._._..._....._.._.—._._._.._----
NW has chosen not to place channelization until the surveyors has performed their work. The layout is too
10:30am complicated to be performed without reference I.points.
11:OOam Green Cit continues in median. Contractor has delivered the bark mulch.
- -.._..._...._...._...---- Y - - -._........_..._....................._.._.... ._....._.._.....--- ...._..........._.......---........_._..._........_.............._...._......._._._...._..-- - -- --._._..__.....----....- ----.._....._......_._._._._................
G/C continues. I have informed G/C the layout at the north end of the median is not correct and that the spacing
12:30pm is too close.
1.30pm Work in the median continues.
..............._._...-----.._._......_...------... ......_................ ...... ............................_....._......_........------ ........_...__..__.....
G/C is placing mulch in the median at Sta. 29+50-33+00; the mulch is being placed fully around each plant and
2.30pm not being_kept 4" from the base of the plants_The overall depth of the mulch appears to be approx. 3".
- .._...._ ....--- ----
Green City is removing their equipment from the roadway and are finishing fir the day.AGS is preparing to remove
3:OOpm he T/C.
3:3O.pm.............._ork has finished for the._daY..........._.._..—._._..__..__....._....__...._...__.._.._.._._..__...........................-.-_.----..............._......................_.......__....................................._...................._.........._....._......_.........
_.. --...------
Todd fi�aiX 9/15/2016
Inspector's Signature Date
`' p mac:ty(if f;�- INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 3 of 3
Subject:
,+Nt
Landscaping
Location:
/-...Sta. 29+50-33+00 +/-
...................I.........................................................-
........................................._.................................-..............._..._.............................................................................................
Comment:
Green City is performing layout for the
median.
r Subject:
Landscaping
Location:
r - Sta. 29+50-33+00
t-'I
a _._.._.........._—__.......-._. __...................._...................._........_......_.................
- Comment:
Green City is placing plants in the
_ -..j median.
Subject:
r Landscaping
•t. •"t
� yu
Location:
Sta. 29+50-33+00 +/-
Comment:
Green City is placing bark.
Tadd fi�ei/c 9/15/2016