Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 9/15/2016 INSPECTOR'S DAILY REPORT Duvall Ave INE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 1 of 3 IIIIIIIIIII IIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII - `03854 708-Inspector's Daily Reports 09/15/2016" ED hursday, September 15, - 2016 Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To Weather: Time Temp Sky Time Temp Sky 7:30am 50 Cloudy 3:00pm 72 Clear ID Contractor ` Representative/Title ID Contractor Representative/Title A Icon Materials Bill Johnson/ Foreman F ............................................................._..._..................._......__._..__..._................................................................................ B AGS Jessie Dillard/TCS G ............................_......._.........................._..........__.............................................................................................................. ..........._...... C Green City Jesus Garnica/Foreman I -----------...._...................._...._........_................_........._......__.......................... ._......................_..........----.....................--...-...................................._.............. - — D NW Traffic J .................................__.................................................._....._............................................................................................................_.._.._..__.............................__............................ ..................................................................................................................................................................._....._.............._........_......_....._............................................. E K Work Activity ID Description Location Crew Equip A Supervising Contractors All 1 M F250 P/U, B Traffic Control All 3F, 1M F150 P/U, Arrow Board C Landscaping the medians Sta. 18-22+00, 29+50-33+00 +/- 5M F150 P/U, F450 U/T D Placing Channelization No work Performed Isuzu U/T 'Traffic Control Was Traffic Control Req'd Today? _ Yes Was WZTC per approved TCP? Yes _ Comments: Material Delivery ' PI! ` ` 1lltLo/isua ( ?nif Rs�De 7-oaV Fi°ei/c 9/15/2016 Ins a tor's Signature Date "te a (Signature) Date INSPECTOR'S DAILY REPORT. (ppn �� Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 �Onsite Testing In/Out of ime Material Descri tion LocationlOffset Conformance None l ime Discussion 7:30am GS is on-site re arin to lace T/C at the median Sta. 29+50-33+00 +/-. ._.._................._....._...-------._......._....._...-......................__..-P................._9..._..._.._.p..----._._......_...._.._....................................._..................................................................................._..__.........__...................._.._.............._.._._..._...----..._.........................__.............._.................._..._..__..-_._........_...._..--- 8:3.0_a_m AGS has closed the left lanes near the medians to create a clear space for Green City. Green City is on-site to continue with plantings in the median at Sta. 29+50-33, NW Traffic is on-site to begin 9:OOam lacin channelization at the south end of the roject. .....................................p............_........g..............................__....---..._..._..__......._......_.._..............._......__.....--.._................................_.......P........J._.._........_..............................................._.............................................._..._.........-...---._...........................---..._..............._...__.._.....-........................-........................ 1.0_:0__Oa_m__NW is performing layout, G/C continues planting. -_ _ _....._..---- -..._........_._..__.._.... __.._.._.._...__...._._..._....._.._.—._._._.._---- NW has chosen not to place channelization until the surveyors has performed their work. The layout is too 10:30am complicated to be performed without reference I.points. 11:OOam Green Cit continues in median. Contractor has delivered the bark mulch. - -.._..._...._...._...---- Y - - -._........_..._....................._.._.... ._....._.._.....--- ...._..........._.......---........_._..._........_.............._...._......._._._...._..-- - -- --._._..__.....----....- ----.._....._......_._._._._................ G/C continues. I have informed G/C the layout at the north end of the median is not correct and that the spacing 12:30pm is too close. 1.30pm Work in the median continues. ..............._._...-----.._._......_...------... ......_................ ...... ............................_....._......_........------ ........_...__..__..... G/C is placing mulch in the median at Sta. 29+50-33+00; the mulch is being placed fully around each plant and 2.30pm not being_kept 4" from the base of the plants_The overall depth of the mulch appears to be approx. 3". - .._...._ ....--- ---- Green City is removing their equipment from the roadway and are finishing fir the day.AGS is preparing to remove 3:OOpm he T/C. 3:3O.pm.............._ork has finished for the._daY..........._.._..—._._..__..__....._....__...._...__.._.._.._._..__...........................-.-_.----..............._......................_.......__....................................._...................._.........._....._......_......... _.. --...------ Todd fi�aiX 9/15/2016 Inspector's Signature Date `' p mac:ty(if f;�- INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 3 of 3 Subject: ,+Nt Landscaping Location: /-...Sta. 29+50-33+00 +/- ...................I.........................................................- ........................................._.................................-..............._..._............................................................................................. Comment: Green City is performing layout for the median. r Subject: Landscaping Location: r - Sta. 29+50-33+00 t-'I a _._.._.........._—__.......-._. __...................._...................._........_......_................. - Comment: Green City is placing plants in the _ -..j median. Subject: r Landscaping •t. •"t � yu Location: Sta. 29+50-33+00 +/- Comment: Green City is placing bark. Tadd fi�ei/c 9/15/2016 Inspector's Signature Date