HomeMy WebLinkAboutInspector's Daily Reports - 9/14/2016 INSPECTORS DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 1 of 3
II IIII I III VIII II III IIII VIII IIIIIII I IIIIIIII IIIIII III II
*03854 708-Inspector's Daily Reports 09/14/2016 ••. ednesday, September 14,
2016
Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To 3:30pm
Weather: Time Temp Sky Time Temp Sky
F-1 7:30am 52 Clear 3:OOpm 80 Clear
ID Contractor Representative/Title ID - ' Contractor Representative/Title
A Icon Materials Bill Johnson/ Foreman F
..............................................._........................................................................................................................................................................... .................
B AGS Jessie Dillard/TCS G
...................................................-.-.........................................__...........__........................_.................._..........__..................................._.__._._............._..._._..__..._.. ._.....__..__.........................._............................................................................._............._..._._...._...._..............__................................................................
C Green City Jesus Garnica/Foreman I
................................................................................................................_......_.._....................._......_....... _......._....
__._._.._._..._..
D J
.......................................................................................................................................................................................................................................................................................... ......................................._._.............._..........._..............................................._......_......................................_._..................._............_.........................._._................
E K
Work Activity
ID Description Location Crew Equip
A Shoulder restorations Sta. 43-49+38L 2M JD 310 backhoe, F250,
B Traffic Control 4F, 1 m F150 P/U
C Landscape planting in Sta.. 18-22+00, 29+50-33+00 4M F150 P/U, F450 U/T
medians +/-
Traffic Control
Was Traffic Control Req'd Today? Yes _— Was WZTC per approved TCP?
Comments:
Material Delivery
Uisuallnspec ons
pipw
, r+� x c e; ; tt r �P%„n,. �� . ' ti r +ESt Q s U P �Q 7�. �ti- mt�wG er�ROM ,^PL
Todd f eiX 9/14/2016
Inspector's Signature Date
o,
VA eewed By (Signature) Date
R,
INSPECTOR'S DAILY REPOT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 3
.Onsite Testing
In/Out of
Lime Material Descri tion Location/Offset Conformance
None
ime Discussion
GS is staging equipment for lane closures at the medians. Icon is preparing for the day. I have informed Bill
that I am missing tickets 15 &16 form Paving and that I need the final ticket for the crushed surfacing delivered
7:30am 9/13/16.
8:30am Icon is removing unnecessary equipment from the site.
Green City is on-site preparing to place plants in the median at Sta. 18-21+00, Totem is on-site to inspect speed
9.00am sign at Sta. 30+70 +/-. Icon has removed the cold mix from 6th. One flag_ger removed from the site.
G/C continues to place plants in the median at Sta. 18-21 +/-. Totem has inspected the speed sign at St.30+70
+/-and found it to have power and is turned on but they cannot perform any further diagnostics without a compute
10:00am connection which the COR crews will have to perform. .
G/C continues in the median at Sta. 18-22 +/-; plant spacing appears to be too close and I have asked the
foreman if he has enough plants to finish the median at sta. 29+33+00, he stated that he did. the contractor
working the plat across the street at 9th is planning to place concrete in the Luminaire bases at 1:00pm; they plan
11:OOam o use the T/C devices that belong to AGS to take the curb lane from Sta. 45-47+OOL +/-.
12:00 m Work in the median continues. Icon has finished the shoulder restorations.
................................................................_........_.__....._..................--.._..._............-...-..........................................................................-.................-..._....__.._....................................................................._..._..................._...................-......._...................-.. _............-......_._........_..._._..................._.......................... ............- -
GS has removed another flagger from the site. COR crews are on-site to inspect the speed sign at Sta.30+70R
12:30pm +/-; they determined that the Blutooth module is malfunctioning and needs to be replaced._
1:00pm he southbound curb lane is closed from Sta. 49+38-45+OOL +/-.
....................P...................................................................................................................................__......................................................................................_........................_......................................................_...................................... ...................-.................._.__.........._......_...—.....................................................................-._._...--
G/C has completed planting in the median at Sta. 18-22+00 +/- and are relocating to the median at Sta. 29-33
1:45pm +/-. Concrete has arrived for the Luminaire bases at Sta. 49+38-45+00 +/-.
2:30 m G/C continues to lace plants in the median at St. 29-33+00 +/-.
P .................................................................................................................-................................................_.........._............................................................-.........................._.........._._.......---..__.._._............................-....._....................-_._...-.......
I have informed G/C that they need to be off of the road by 3:00pm; if they were close I would allow them to
3:00 finish but there is a large amount of work yet to be completed. They are removing their equipment.
3:30 m G/C has finished for the da and AGS is removin the T/C and is finished for the day. _
....P.............................................................................................................._........._...........y.............................. .................._..-......----._.g.................................. ........_..._..............-....---...._................. ........
. ................... ..... .
....................................................................................................................................................................................................................................................................................................................... ....................................................................................... ........................._.__....._...._.................._.._.............................................
Todd fi�ei/c 9/14/2016
Inspector's Signature Date
N
i
I
'
Subject:k
toTraffic Control
Location-
Alf Sta. 29-33+00
AGS
a
is s
w e'�rt •„�, .%jrg+•••= r a';`.;M•+"', irk.”" .� ,M F:'1%;G 7C �,. has placed to allow
City access to the median.
,y
Radar Speed Sign
.:..w••iK!�.ia/i i
s L ��•
Comment:_
a
Totem is troubleshooting the radar
speed sign.
Landscaping
'� ,t�{ �� � ,F,.� x.�':"' '• �'� ale
' •r wa% to` �&�
_ •'�� ;
Location:
a �5 6
�- 29-33+00
- �? {.
Green City is placing the plants in the
-•
4`. " 001141201'6