Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 9/14/2016 INSPECTORS DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 1 of 3 II IIII I III VIII II III IIII VIII IIIIIII I IIIIIIII IIIIII III II *03854 708-Inspector's Daily Reports 09/14/2016 ••. ednesday, September 14, 2016 Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To 3:30pm Weather: Time Temp Sky Time Temp Sky F-1 7:30am 52 Clear 3:OOpm 80 Clear ID Contractor Representative/Title ID - ' Contractor Representative/Title A Icon Materials Bill Johnson/ Foreman F ..............................................._........................................................................................................................................................................... ................. B AGS Jessie Dillard/TCS G ...................................................-.-.........................................__...........__........................_.................._..........__..................................._.__._._............._..._._..__..._.. ._.....__..__.........................._............................................................................._............._..._._...._...._..............__................................................................ C Green City Jesus Garnica/Foreman I ................................................................................................................_......_.._....................._......_....... _......._.... __._._.._._..._.. D J .......................................................................................................................................................................................................................................................................................... ......................................._._.............._..........._..............................................._......_......................................_._..................._............_.........................._._................ E K Work Activity ID Description Location Crew Equip A Shoulder restorations Sta. 43-49+38L 2M JD 310 backhoe, F250, B Traffic Control 4F, 1 m F150 P/U C Landscape planting in Sta.. 18-22+00, 29+50-33+00 4M F150 P/U, F450 U/T medians +/- Traffic Control Was Traffic Control Req'd Today? Yes _— Was WZTC per approved TCP? Comments: Material Delivery Uisuallnspec ons pipw , r+� x c e; ; tt r �P%„n,. �� . ' ti r +ESt Q s U P �Q 7�. �ti- mt�wG er�ROM ,^PL Todd f eiX 9/14/2016 Inspector's Signature Date o, VA eewed By (Signature) Date R, INSPECTOR'S DAILY REPOT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 .Onsite Testing In/Out of Lime Material Descri tion Location/Offset Conformance None ime Discussion GS is staging equipment for lane closures at the medians. Icon is preparing for the day. I have informed Bill that I am missing tickets 15 &16 form Paving and that I need the final ticket for the crushed surfacing delivered 7:30am 9/13/16. 8:30am Icon is removing unnecessary equipment from the site. Green City is on-site preparing to place plants in the median at Sta. 18-21+00, Totem is on-site to inspect speed 9.00am sign at Sta. 30+70 +/-. Icon has removed the cold mix from 6th. One flag_ger removed from the site. G/C continues to place plants in the median at Sta. 18-21 +/-. Totem has inspected the speed sign at St.30+70 +/-and found it to have power and is turned on but they cannot perform any further diagnostics without a compute 10:00am connection which the COR crews will have to perform. . G/C continues in the median at Sta. 18-22 +/-; plant spacing appears to be too close and I have asked the foreman if he has enough plants to finish the median at sta. 29+33+00, he stated that he did. the contractor working the plat across the street at 9th is planning to place concrete in the Luminaire bases at 1:00pm; they plan 11:OOam o use the T/C devices that belong to AGS to take the curb lane from Sta. 45-47+OOL +/-. 12:00 m Work in the median continues. Icon has finished the shoulder restorations. ................................................................_........_.__....._..................--.._..._............-...-..........................................................................-.................-..._....__.._....................................................................._..._..................._...................-......._...................-.. _............-......_._........_..._._..................._.......................... ............- - GS has removed another flagger from the site. COR crews are on-site to inspect the speed sign at Sta.30+70R 12:30pm +/-; they determined that the Blutooth module is malfunctioning and needs to be replaced._ 1:00pm he southbound curb lane is closed from Sta. 49+38-45+OOL +/-. ....................P...................................................................................................................................__......................................................................................_........................_......................................................_...................................... ...................-.................._.__.........._......_...—.....................................................................-._._...-- G/C has completed planting in the median at Sta. 18-22+00 +/- and are relocating to the median at Sta. 29-33 1:45pm +/-. Concrete has arrived for the Luminaire bases at Sta. 49+38-45+00 +/-. 2:30 m G/C continues to lace plants in the median at St. 29-33+00 +/-. P .................................................................................................................-................................................_.........._............................................................-.........................._.........._._.......---..__.._._............................-....._....................-_._...-....... I have informed G/C that they need to be off of the road by 3:00pm; if they were close I would allow them to 3:00 finish but there is a large amount of work yet to be completed. They are removing their equipment. 3:30 m G/C has finished for the da and AGS is removin the T/C and is finished for the day. _ ....P.............................................................................................................._........._...........y.............................. .................._..-......----._.g.................................. ........_..._..............-....---...._................. ........ . ................... ..... . ....................................................................................................................................................................................................................................................................................................................... ....................................................................................... ........................._.__....._...._.................._.._............................................. Todd fi�ei/c 9/14/2016 Inspector's Signature Date N i I ' Subject:k toTraffic Control Location- Alf Sta. 29-33+00 AGS a is s w e'�rt •„�, .%jrg+•••= r a';`.;M•+"', irk.”" .� ,M F:'1%;G 7C �,. has placed to allow City access to the median. ,y Radar Speed Sign .:..w••iK!�.ia/i i s L ��• Comment:_ a Totem is troubleshooting the radar speed sign. Landscaping '� ,t�{ �� � ,F,.� x.�':"' '• �'� ale ' •r wa% to` �&� _ •'�� ; Location: a �5 6 �- 29-33+00 - �? {. Green City is placing the plants in the -• 4`. " 001141201'6