HomeMy WebLinkAboutInspector's Daily Reports - 9/13/2016 } (dire„� ;, INSPECTOR'S DAILY REPORT
7 "' � `� '
I `k�_.�-.> Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
II IIII I II� II I I II III I II II II II I I I IIII I VIII III II Page 1 of 4
s. - • *03854 708-Inspector's Daily Reports 09/13/2016* Tuesday, September 13,
L- - 2016
Inspector: Todd Freih Inspector's Shift Firs: 7:30pm To 3:30pm
Weather: Time Temp Sky Time Temp Sky
7:30am 52 Clear 2:30pm 78 Clear
ID Contractor: RepresentativelTitle ID Contractor Representative/Title
A Icon Materials Bill Johnson/ Foreman F
.................................................................................................................................................................................................................................................................... ........................................................_...._........................................................-
AGS Jessie Dillard/TCS G
.............................................................._................_..........._.................................................._......_............................................ ....... ..................................................._......................................................................................................................_.....................................................................................
C Green City Jesus Garnica/Foreman I
................................_...._...........................................................................................__.._........_.................................................................................................................................._. ............................................................
D J
......................................._.........................................................................._.._.._._.._........._._...._.._................................................................................................................_.. ......................................................................_.._..........__..__... ---.. ._.__........................................................_................................................................
E K
�Work Activity
ID Description Location Crewe . Equip_
A Supervising Contractors All 2M F250 P/U, Ranco FG110C
grader, sweeper, JD 110
backhoe
B Traffic Control F150 p/U
C Planting Medians Sta. 29+50-33+00, 4M 1 F150 &1 F250 P/U
18+00-21+00 +/-
Traffic
Control
Was Traffic Control Req'd Today? _Yes Was WZTC per approved TCP? Yes
...................._...P........................._..._....._.__..._._..............................................................................._..............................
Comments:
Material DeliVery
�p�9a:.��+�q�T g 'g�. ,�^� ,ks��_ �§'� �� :.�G 3-�3",�,�.ayyrr ^x�. ,',, -r�u�,.�,}p��;?��x;'`',k�.�s t}�r �'` ■g. ,,��,C'' =f:p[}p „:�r%s .-A<'"�"9'' ,fir
'GVVrK�tlltt ;'°.� auY. ami �l�.x3..c��� �•'^t�:. { 6.fi<Y F�'4sm�'^d "�+'�GJ,J,rya�k� G�Z” +a`�� y�� � �F,$m> �v�ty L'n` ���'t�15��1,&'� �el�"TLfw�j��4E
7-aaW/5.4 9/13/2016
Inspector's Signature Date
J�
Levi ed By (Signature) Date
�r -r= INSPECTOR'S DAILY REPORT
OWWWO,-- t `' Duvall Ave AVE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 4
Onsite Testing
. � inl0ut of
i �
ilflateria! bhescrition La4aotZlOffsct �onfmrmance
None
�._ , . Discussion
7:30am GS is staging T/C to close the Left lane adjacent to the medians.
8:30am GS has closed the southbound left lanes near the planters.
9:30am Green Cit is on-site to accept delivery of plants_
--............................................__.....-----........y_........_...._..........................................................._.... .._._..................._......_._...--------..._........................_.............................................................._._.._.._..._........_.__.._.._._-................_._.---
Green City's delivery has just arrived and Terry Flatley is on-site to inspect the plants. The Mt Vernon Laurels
10:OOam appear to be in shock; G/C stated that they will water them and they should look better.
.........................................-p......................................_........_................................__....._._....................................__.............._..................._..... _.._.......................................__._._...._..... _....._.....................-............_.__.........................................._......................... . .. _
Icon is placing crushed surfacing for the shoulder restoration at Sta. 35-49R +/- and are removing asphalt
10:30am grindings from the stageing area at 10tH
11:OO. plants,..................._.. _ ......................_.........._................. ...........__...........P.._..... . ----._...._...._.......... . ........_..__._ ........ ...............
12:OOpm Icon continues from Sta. 37-42+50R and is removing equipment from site.
..............-....._...._....._.....__........................._......_.....--- - ........................._.......-..._......__....................----
Shoulder restorations continue at Sta. 44-49+38R. AGS has sent all but 3 flaggers away. Icon has finished
1:OOpm removin avement grindings from the site.
........_........__................................ 9.....P............................................ ......................_.............................................__......._............._........................_....................................................................._...................................._........................._....................................._...-..................
.-
:30pm Icon has finished lacing crushed surfacing and AGS is removing T/C_
.. ..................._......_ . _.__.........p.................. ................ . ....._. ........ __................. .._._._...._......................................_..__...----._.....
3:OOpmork has finished for the day.
...........................-............................._...............................................__.............................................._..-----...................................._........................................................................................-........................................._.._........_....................................................._...----........................
...................................................................................................................................................................._........................................................._...................._........................................__....................................._.------..._.............................._............._..._....-............
..........................................................................................................................................................._....__.................................................._......................_.........................................................................................................._.__..........................................---..._._.......................................
.....
7"1/1 9/13/2016
Inspector's Signature Date
INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 3 of 4
j
Subject:
Landscaping
.3
Location:
Sta. 29+00 +/-
Y , _. .............................................................................____...._.._._..._—......_............._..__..............................._..____
n. * Comment-
- � -
Green City is taking delivery of the
plants for the median.
r it I
C
Subject:
Shoulder Restorations
Location:
- Sta. 43+00 +/-
i ..... .......................................................................................... .... ...................................._.............
= r " Comment:
Icon is placing crushed surfacing.
c S. y
Subject:
"���' � � Property Restorations
+ in
{t
_...............—.......__.................._-....-......._ __..__...... ................._....................................................
�R Location:
r 1 Sta. 49+38 +/-
a.
t
Comment:
- - 7 �. Icon is removing spoils from the
staging area.
Tc(d 15eiX 9/13/2016
Inspector's Signature Date
INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 4 of 4
Todd Flv,14 9/13/2016
Inspector's Signature Date