Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 9/12/2016 r ` INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) II Page 1 of 3 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II • - 03854 708-Inspector's Daily Reports 09/12/2016" MR. Monday, September 12, 2016 Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To 5:30pm Weather: Time Temp Sky Time Temp Sky 7:30am 52 Clear 5:00pm 75 Clear ID Contractor Representative/Title ID Contractor Representative/Title A Icon Materials Bill Johnson/ Foreman F ......................................................................._..............................._......................................... . B AGS Jessie Dillard/TCS G __........._._....-._........._.........__._......._.....................-----....---.....................---.................—.------...................----......- ........._ .._................_....................................................._......................_.._._.._..................._.................................--... — -...—_..._ C Seatac Sweeping Al Vincent/Operator I ................... . . . ............._.............._...... ........... D J ..........._......_._....... .__....... — -.......-----........_.................................—— — -.._..............................._.._._.................. E K Work Activity ID Description Location J Crew Equip A Paving Sta. 28+25-49+38R 8M Cat Paver, JD310 backhoe, F250 P/U, F450 U/T B Traffic Control 5F, 2M F150 P/U C Street Cleaning 1M Sweeper Trk ControlTraffic Was Traffic Control Re d Toda Yes Was WZTC era roved TCP? Yes Comments: Delivery WIMPAU l lnspect�onr.-'' Esto-t �, a :tlni7 , T&151wX 9/12/2016 I spe or's Signature Date Cl li ko view Qy (Signature) Date INSPECTOR'S DAILY REPOR'�'' Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 Onsite Testing In/Out of irne Material Descri tion Location/Offset Conformance None ....... Diary ime Discussion 7:30am Arrived on-site and found S&S cleaning the road surface in preparation for avin . ............................_...................................__............__................_......._..._....................................................._............_....._..................9 .......................................................................................P..........P...........................................................-- _9_..._....._._.............................................._.......................__......_....._........................._.... GS is staging T/C devices in preparation to shift traffic to the northbound lanes. Icon is at NE 81h preparing for 8.00am.........pavin..g:............_....................................... ............................................................._............................_......................_......................_........_...._.._.._............................................................._............................_...._.._._._.............. -...---.-----....._.........._.........................__... Traffic remains on the northbound side of Duvall; AGS has not completed the lane shift and traffic is getting into 8:30am he southbound lanes. Icon is heatin the area where the pavement will be tied in. ....................................... ................._..............................._................__..._.._...................._..._._..---...........................................g......................................._....._...................................._.................—-—.._..._......_..._._.._._.. -................._.._..._......._...._.__................- --------_._..--........—_...._.............. Icon has started paving at Sta. 28+25, 15-33R +/- in the curb lane. No flagger is present at NE Th PI. traffic is 9:OOam crossin the work zone without aid into the live lanes. ...... .........g..................................................................................._....._........._..........................................................................................._..__.............................................................................................................._.._......._.........._._............_..........................._._............_....__......._..._......--......_..— .... 10:00am Icon continues at Sta. 35+75, 16-34R +/-. 11:OOam Icon continues at Sta. 41+00, 21.5-34R +/- 12:OOpm Icon continues at Sta. 48+00, 21-32R +/-2 1:OO.pm._.._..Icon.co.ntinues..at Sta. 23+00. 0-21 R +/-_ --------................................. ................ ...--- 2:OOpm Icon continues at Sta. 42+00, 0-21 R +/-. 3:OOpm Icon continues at Sta. 45+00, 0-21 R +/-. :OOpm Icon has finished placing HMA and continues to perform compaction and temp striding. I need tickets 15, 16. :30pm Icon has finis .. ......................._........_._P__.................................9...._.._.._........................................._........_.._....._........................................................................................................---.........----- Icon has finished for the day, I have recorded a temp of 135 at the north end of the project and have directed GS to open all lanes to traffic.AGS started at the south end of the project to remove barrels instead of the north 5:00 and and is working in traffic. 5&15 4 9/12/2016 Inspector's Signature Date A-1 Location. -32R Sta. 28+25, 15 ................................................................ ................................................. Comment: Icon is preheating the joint prior to paving. Subject: Paving Location: 28+35, 15-32R .......... Comment: Icon is applying tack to the surface prior to paving. Subject: wtl- Paving AI 1, I Location: Sta. 28+25, 15-32R +/- ................................... MIT,