Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 9/1/2016 INSPECTOR'S DAILY REPORT --------------- r V r. ('.f t :f:' Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) IIIIIIIIIIIII II I IIIIIIIII IIIIIII I II II IMI I I III II I VIII III IIII Page 1 of 3 `03854 708-Inspector's Daily Reports 09/01/2016' •.. hursday, September 1, �. - 016 Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm T- 5:OOam Weather: Time Temp Sky Time Temp Sky 8'OOpm 61 Cloudy 5:OOam 60 Cloudy 4 ID Contractor ' Representative/Title ID Contractor Representative/Title A Icon Materials Bill Johnson/Foreman F __._._......__.._...............__......_......__......—.__... —— ---- _.._.._._.........--- ....................... ---- --- --._.._...--- - -------......._............................................_.....-.........................-... D AGS Jessie Dillard/TCS G .......... ---._......_........-----..................._............__.._................................._........---...._..... ................................... __..............__...._........-----................................ ................................-.......................--..---......_.................................__...................I......................... C Muller Const. Dick Pleasant/Operator erator I D S&S Sweeping AI Vincent/Operator J _...................-----............__.._...................._.._....__._.............—_.........._.._........__..._....................................................................._......----........_....... ............_.._...................._......_.......__._.........................................._..............._...._...._......._..................................----..._..............._..._........ E K :Work Activity ID Description `'' Location Crew Equip A Support for planer, temp NE 4th St-NE 6th St. 5M, 1F 3 D/Trks, JD310 backhoe, 2 striping F450 U/T, F250 P/U, Mack Water Trk. Small weeper B Traffic control 5F, 2M 2PCMS, F150 P/U C Planing Asphalt 3M Roadtec planer, Sweeper Trk D Sweeping behind the 1 M Sweeper trk planer Traffic Control WasTraffic Control Re d Toda Yes__..........._.............--- �- --..._._....................9_...............................Y............._._....................................._........_._ ._.._..............._....................................._Was_WZTC.....P...eC._a.P.Proved TC_P...�....._Yes.........._.........................—_................................ Comments: Material D- Visual Inspection �' ;Est, G1tW. Joilt per ROM/,4P�a ,. Tcic(fi�ei�C 9-1-2016 Inspector's Signature Date Reviewed By (Signature) Date City(if , =� INSPECTOR'S DAILY REPORT r. rC r Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 Onsite In/Out of [rime Material Deseri tion Location/Offset Conformance None Diary irne Discussion 8:00pm_ GS has the road closed and Icon is removing the curb for the turn lane at 4th ....... ......... . ..._-............_------..............................................-.._...........................__. ................----....-----..-................................................._...._.................._........----._...........-..............-......_- 8:30pm Crews are waiting for Mulier to begin planing Icon had a pile of cold mix delivered at the SW corner of 6th and a motorist drove over it Bill is taking care o hem no apparent injuries.The pile was not coned off and the driver had no warning. I have contacted the police. 9:OOpm Mulier has begun planing in the northbound lanes at 4th. Mulier has completed the first pass and are repositioning. Icon is removing asphalt that the planer was unable to 10:00pm remove. ......................... ..................--.................._........................ Mulier has completed nearly half of the work.Water is pooling along the shoulder and Icon is attempting to move 11:00pmm it to the C/B. 12:30am Mulier continues, Icon has begun to place temp markings but rain is washin the paint off. .......... .........................g.................... ...................................... ...........................................-............................................. 1:30am Icon is removing asphalt around the median at Sta_14+58, Mulier continues at Sta.14+50+/-. Mulier has finished planing, Icon is removing asphalt not completed by the planer and performing layout for the 2.30am pavement markings. S&S sweeper off-site. .......... .................................... .._ ............................................................................................................................ . ........---.................................................................... . ..._..__. 3:30amMulier is offsite, Icon is drying the pavement and applying temp markings. _.-...... _.—_._........................._ :30am Icon has finished for the night, AGS is removing T/C.—_ 5:00am Duvall is open and work has finished for the night. _ ..................._....................................................._._......................................................__.....................-._........................................................................................_........................................................................................................................................................................................... Todd 5164 9/1/2016 Inspector's Signature Date ` p Ciit•or INSPECTOR'S DAILY REPORT .• T Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 3 of 3 Subject: Traffic Control Location: Sta. 12+50 +/- Comment: AGS has closed the roadway between NE 4th and NE 6th St. Subject: Pavement Planing Location: Sta. 15+00 +/- Comment: Mulier is planing asphalt Subject: Temporary Pavement Markings Location: Sta. 12+50 +/- Comment: Icon is placing pavement markings Tadd fi ei/z 9/1/2016 Inspector's Signature Date