Loading...
HomeMy WebLinkAboutCO 1Community Services Facilities Division CONTRACT NO: CAG-18-216 CO NO, 1 CONTRACT CHANGE ORDER (CO) PROJECTTITtE: Renton City Hall Elevator Mod. - Phase 2 TO: RC Zeigler Company, Inc. (CONTRACTOR) The following mutually agreed to and Owner approved Change Order Proposal(s) are hereby incorporated by reference into the contract. Description Amount COP 1- Delete Chemical Piping Re -Route $ (17,270.00) CONTRACT SUM: ❑ NO CHANGE ❑ INCREASE OF: $ (17,270 00) 0 DECREASE (WASHINGTON STATE SALES TAX INCLUDED) CONTRACT TIME: O NO CHANGE ❑ INCREASE OF: O DECREASE CALENDAR DAYS 01 The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect. CONTRACT SUMMARY (Internal Use Only) ORIGINAL CONTRACT SUM $ 115,207.40 PREVIOUS ADDITIONS/DELETIONS $ _ PREVIOUS TOTAL $ 115,Z07.40 CHANGE AMOUNT THIS CHANGE ORDER $ (17,270.00) REVISED CONTRACT TOTAL $ 97,937.40 PERCENT TOTAL CHANGE FROM ORIGINAL-14.99% NOTICE TO PROCEED DATE February 20, 2019 PREVIOUS CONTRACT CALENDAR DAYS 426 PREVIOUS SUBSTANTIAL COMPLETION DATE April 21, 2020 REVISED CONTRACT CALENDAR DAY_ S THIS CHANGE ORDER 426 CURRENT SUBSTANTIAL COMP April Zi, 2020 _ 5/7/19 S- /0 t Architect Acknowledgement Date Contra r Acknowled ment Date The City of Renton hereby accepts the foregoing Change Order Proposal(s). This formal acceptance constitutes a Change to the contract only when authorizing signature Is affixed. Invoices incorporating this Change Order constitute acceptance by the Contractor as total reimbursement due In connection with this Ch O AUTHORIZIN GNAT E DA Community Services Facilities Division Project No: CAG-18-216 COp 1 CHANGE ORDER PROPOSAL Project Name: RCH Elevator Modernization - Phase 2 (COP) TO: R.C. Zeigler Company, Inc. (CONTRACTOR) Proposal Request Date: 05/03/19 You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to: Remove scope of work to re-route cooling tower feed lines from mechanical space to roof as Identified on sheet M2.4 REASON FOR CHANGE: El Design Errors ❑ Design Omissions [D Owner ❑ Unknown Conditions ❑ Code/AHJ ❑ Other EXPLANATION: Owner requested change. DATE PROPOSAL REQUIRED: 5/17/19 CHANGE ORIGINATED BY. Russ Woodruff (Id days from Request Date, unless other date agreed to) PROPOSAL REQUESTED BY: Thomas Horton Thomas Horton (A/E) TO: Russ Woodruff WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBIN THE PROPOSAL REQUEST FOR PM ED CONTRACT SUM: ❑ NO CHANGE ❑ INCREASE OF Seventeen thousand two hundred and seventy dollars El DECREASE $ 17,270.00 (WASHINGTON STATE SALES TAX INCLUDED) In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto. CONTRACT TIME: Q NO CHANGE ❑ INCREASE OF CALENDAR DAYS ❑ DECREASE The foregoing amount covers everything required in connection with the change. All other provlslons of the contract remain In full force and effect. We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until Incorporation of this COP Into a Change Order by the City of Renton _ _R CONTRACTOR We have 1**xamined this proposal and find the cost to be reasonable. _ 56/19 A/E DATE :;;OF fnt utho Sianature f RENT N DATE 5. 7, %9 DATE Therefore, we recommend acceptance. Johnson Barrow inc Leaders in Green Solutions 2203 - 23ro Ave S, Seattle, WA 98144 04/25/2019 Project Proposal Dave Robinaugh, CHC m 206.714.5141 1 d 206.832.8352 Ph:206-826-3174 Fax:206-284-7836 McKinstry Consulting I Construction I Energy I Facility Services JOB NAME: Renton City Hall Equipment: (1) Evopco Fluid -Cooler Model# LSWA 41B l Serial# 87-289OW • FluidTEK is a division of Johnson Barrow • We are a manufacturer's representative based in Seattle since 1963. We are a general contractor specializing in cooling towers, water treatment, filtration and related equipment. We specialize in the upgrade, repair, and refurbishment of evaporative cooling equipment. Fluid-TEK recommends: Option A: ROM for re -piping of conductivity controller & chemical feed. • Remove existing piping from elevator room, and exterior of building. Tie into existing chemical pump station in mechanical room, Reroute new piping through stair well and out side to reconnect to existing points on fluid cooler. All new exterior piping will need to be heat traced and insulated. • Heat trace/insulation based on estimated linear footage. Electrician & insulator will need piping completed to provide firm price. Estimated Materials and Labor Re -pipe: $7 500 00 Estimated Materials and Labor Heat Trace: $3 700 00 Estimated Materials and Labor Insulation: 4 500.00 Total Project Cost S15.700.00 TERMS: *Exclusions: If a bigger circuit is needed for heat trace a change order will be required. • We offer to furnish the services and/or equipment specified herein at the prices stated and in accordance with Johnson-Barrow's/FluidTEK standard terms and conditions. If you do not have a copy of or are not aware of these conditions please contact this office. Payment terms are Net 30 days, O.A.C. • A notice to the property owner will be sent should the work be granted. This is not a lien: this notice is sent to inform the owner who is providing professional services, materials, or equipment for the improvement of the property and to advise the property owner of the rights of these persons and their responsibilities. Take note that laborers on the project may claim a lien without sending you a notice. • If you do not have an account with us, we take Visa or Mastercard. • NOTE: This proposal may be revised by us if not accepted within 90 days. • Work to be performed during normal business hours. M-F, 7am-5pm. • OT adder required if any work is done outside normal business hours. • Temporary cooling by others if required. • Standard one-year warranty materials and labor. ThCIv0Z �ok, Icec�a I<.�e�w FMTuEK. ion of .igflo m Elmow Inc. FluidTEK 1 Tower Solutions Group Mr. Goodtower Service Center 0: (206) 826-3174 M: (206) 679-3260 F: (206) 832-4655 k dak(ctbjbarrow com www.jbarrow.com Call for a free tower inspection! We provide parts on all Evapco and BAC units! AW please consider the impact to the environment before printing this NOTICE OF PRIVACY: This proposal is the property of Johnson Barrow / Fluid-Tek and cannot be reproduced, published or transmitted to any party other than the addressed Company and/or recipient without the written consent of Johnson Barrow / Fluid-Tek Inc. 101