AMENDMENT NO. 1 TO AGREEMENT FOR RENTON AIRPORT
PRIVATE LIFT STATION DESIGN
THIS AMENDMENT, dated June 19, 2020, is by and between the City of Renton (the "City"), a
Washington municipal corporation, and RH2 Engineering, Inc. ("Consultant"), a Washington
corporation. The City and the Consultant are referred to collectively in this Amendment as the
"Parties." Once fully executed by the Parties, this Amendment is effective as of the last date
signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-19-143, dated
April 16, 2019, to provide necessary services for the design services for replacement of the
Renton airport private lift station (referred to herein as the "Agreement");
Whereas, the Parties wish to amend the Agreement to change the time for performance in order
to complete the current scope of work.
NOW THEREFORE, It is mutually agreed upon that CAG-19-143 is amended as follows:
1. Time of Performance: Section 3, Time of Performance, is amended pursuant to the
schedule(s) set forth in Exhibit B-1. All Work shall be performed by no later than June 30,
2021.
2. All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date
last signed by the Parties below.
CITY OF RENTON
By:
Martin Pastucha
Public Works Adminstrator
Date
CONSULTANT
Richard L. Ballard
Director
Date
6/26/2020
Approved as to Legal Form
Approved by Cheryl Beyer via 6/25/2020 email
By:
Shane Maloney
Renton City Attorney
Contract Template Updated 01-15-2020
0��
PAGE 2 OF 2
EXHIBIT B-1
SCHEDULE
All remaining work shall be completed by no later than June 30, 2021