HomeMy WebLinkAboutM_Exhibits_Hyperlinked_200811
CITY OF RENTON
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE
EXHIBITS
Project Name:
Canopy PUD and Preliminary Plat
Land Use File Number:
LUA19-000223, PUD, PP, VA-H, CAE
Date of Meeting
July 13, 2020
Staff Contact
Matt Herrera
Senior Planner
Project Contact/Applicant
Jordan Salisbury, Blue Fern
11232 120th Ave NE, Suite 204, Kirkland, WA
9803311232 120th Ave NE, Suite 204, Kirkland, WA
98033
Project Location
4196 Lincoln Ave NE
The following exhibits are included with the ERC Report:
Exhibit 1 Environmental Review Committee (ERC) Report
Exhibit 2 Neighborhood Detail Map and Property Survey
Exhibit 3 Site Plan
Exhibit 4 Preliminary Plat
Exhibit 5 Landscape Plan
Exhibit 6 Civil Site Plan
Exhibit 7 Grading and Storm Drainage Plan/Detention Vault Details
Exhibit 8 Sewer and Water Plan
Exhibit 9 Road Profiles and Sections
Exhibit 10 Benefit Parcel Map and Survey
Exhibit 11 Technical Information Report prepared Core Design, dated April 26, 2019
Exhibit 12 Arborist Report prepared by Washington Forestry Consultants, dated June 3, 2019
Exhibit 13 Tree Retention Plan
Exhibit 14 Arborist Report prepared by Greenforest Incorporated, dated November 11, 2019
Exhibit 15 Onsite Critical Area Delineation
Exhibit 16 Geotechnical Report prepared by Terra Associates, dated May 18, 2020
Exhibit 17 Stream Study and Wetlands Assessment/Preliminary Mitigation Plan prepared by Wetland Resources, dated July
9, 2018
Exhibit 18 Wall Exhibit
Exhibit 19 Retaining Wall Designs Report prepared by Terra Associates, dated May 18, 2020
Exhibit 20 GeoEngineers Secondary geotechnical review memos dated December 19, 2019 and April 8, 2020
Exhibit 21 Stream Study and Wetland Assessment/Preliminary Mitigation Plan for the offsite benefit parcel prepared by
Wetland Resources, dated November 21, 2019
Exhibit 22 Colored Rendering
Exhibit 23 Architectural Streetscape Plan
Exhibit 24 Architectural Elevations
Exhibit 25 Preliminary Shade Study
Exhibit 26 Transportation Impact Analysis Transportation Engineering NW (TENW) dated April 24, 2019
Exhibit 27 Transportation Concurrency Memo
Exhibit 28 Advisory Notes
CITY OF RENTON
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
STAFF REPORT TO THE HEARING EXAMINER
EXHIBITS
Project Name:
Canopy PUD and Preliminary Plat
Land Use File Number:
LUA19-000223, PUD, PP, VA-H
Date of Hearing
September 1, 2020
Staff Contact
Matt Herrera
Senior Planner
Project Contact/Applicant
Jordan Salisbury
Blue Fern
11232 120th Ave NE, Suite
204, Kirkland, WA 98033
Project Location
4196 Lincoln Ave NE
The following exhibits are included with the Staff Report to the Hearing Examiner:
Exhibits 1-28: As shown in the Environmental Review Committee (ERC) Report
Exhibit 29: Staff Report to the Hearing Examiner
Exhibit 30: Neighborhood Meeting Packet
Exhibit 31: Comment Letter from Muckleshoot Indian Tribe
Exhibit 32: Determination of Non-Significance – Mitigated
Exhibit 33: Floor Plans
Exhibit 34: Elevation Plans (Black and White)
Exhibit 35: Renton Regional Fire Authority email correspondence
Exhibit 36: Preliminary Open Space Plan
Exhibit 37: Preliminary Private Open Space Plan
Exhibit 38: WDFW Email Correspondence
Exhibit 39: Water Plan
Exhibit 40: Sewer Plan
Exhibit 41: August 7, 2020 Applicant request to revise depths of Lots 30-40