CAG-19-001 CO # 11-20
C. Change Order No.11
Contract Title: Renton Avenue South Resurfacing
Contractor: R.W. Scott Construction
Contract No.: CAG-19-001
Federal Aid No.: STP(UQ-12%(023)
® Ordered by Engineer {
❑ Proposed by the Contractor (VECP)
❑ Unilateral T
i Amount y _j Working Days
Original Contract: $1,585,247.60 50 t
_ _ f
I Current Contract: - - - — - _ _ _ : $1,844,815.50
Estimated Net Change This Order: V -` �$8,000.00 (0
} New Contract: $1,852,815.50 j 89
Prepared By: 1 By:
Resident Engineer Date Engineer icity of Renton Transpurtaticn Date
Design Manager)
Reviewed By:
Engineer of I rd
Reviewed By:
City of Rento roject Manager
Consent By:
Surety (Greater than Z596 cost and/or 20%time Date
increase)
Endorsed B
Date Contractor
L _ � �,'ozo
Date
tlielA�Icb �Y= Ex cute Sy
Cheryl L. Beyer _ ?' Z3i2026
ifF9... Date City of Renton Public Works Date
Administrator / Mayor
Change Order No. 11
Contract Title: Renton Avenue South Resurfacing
Contract No. CAG-19-001
Page 1 of 3
THE CONTRACT IS MODIFIED AS FOLLOWS:
Description of Change:
Additional Permanent Signing and Pavement Markings at S 132"d and Renton Avenue
South Intersection. There are additional permanent signs and pavement markings
added to the intersection to allow for a marked crossing of the S 132nd Street crosswalk
at Renton Avenue South and for enhanced driver awareness of the pedestrian refuge
island on Renton Avenue South.
The above changes shall be in accordance with the plans listed below.
Reason for Change:
Added marked crosswalk on S 132"d Street and added markings and signage for the
pedestrian refuge island on Renton Avenue South. At the South 132"d Street approach
to Renton Avenue South, the crosswalk was to be unmarked per the original plans. The
City directed the Contractor to mark a crosswalk from the northwest corner across the
pedestrian island to the southwest corner of the intersection. Additional tubular
markings and signage is added to the pedestrian refuge island in Renton Avenue South
to enhance visibility to drivers.
Materials:
Plans:
This work will result in the increase of 60 SF of bid item 48 (Plastic Crosswalk Line),
additional permanent signing and flexible tubular markers. Acceptance shall be based
on visual inspection.
Channelization Plan — Plan Sheet 34/CH-2.
Equitable Adjustment:
This Change Order does include an equitable adjustment of $8,000 per Section 1-09.4 of
the 2018 WSDOT/APWA Standard Specifications. See attached.
Extension of Time:
The Time for Completion is extended 0 Working Days.
Change Order No. 11
Contract Title: Renton Avenue South Resurfacing
Contract No. CAG-19-001
Page 2 of 3
Sections 1-04.4 and 1-04.5 of the 2018 WSDOT/APWA Standard Specifications shall govern
this Change Order. The Work of the referenced Contract is modified to include the changes
detailed herein. The payment provided for herein shall constitute the complete and final
settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all
other claims that may be made by the Contractor as a result of this change.
Attachments:
Forms to be attached to Change Order
® Plans
® Field Directive
® Change Order Quotation
® Estimated Change Order Cost
El Project Labor List
(] Force Account Equipment Rate Request (DOT Form 422-010 EF)
® Equitable Adjustment Determination
Change Order No. 11
Contract Title: Renton Avenue South Resurfacing
Contract No. CAG-19-001
Page 3 of 3
Sll03MaddV OdM 31V0 N05N3tl '^N
Stl33N19N39NI11fISN00 Ntlld NOLLtl2f13NNtlNJ N
Stl0 :03NO3H] .3 .''•�•�"��g q J`y =
`JQf YdII.IOaSII� �BSfI sl*' 6!/Ol 'NOLLYNIWtl3l 1t1LL OOY �° S ¢ V n
1 l tl �l ONIOVj1if1S3M H1f10S 3f1N3Atl NOlN3?J
via aunvaa 'mm WN WWWY
S"1'16l/l! ONY 5lYJ5 NNDLLIOOY ® OdO°� �e,2JY y0� NOlONIHSVM .UNf10� ONq � m c 4i
G 640L �DN 3 Y0 YyS NYN� n
NO1N321 =10 AllO
= gym w
DO
gg
duo zoy��€e-6
z 65z m o
a gee m> a�a z; z fi. zW a! z� z = z z ax=w z� zp z z� z
o Jm�+36po.03�" 2Fg
�w4 - z
�s' aos� �n �� 8a 8� �� ��. ��� 8g �a 8` �f" 8 w 8 `> > H �-
n LL
MOl3S
I
33S -
00+%
V1S BNIIH31V
W
I
I
I
I
I
I
I
I
m
$h
I
I
I
,
,
I
I
I
I
,
,
,
�J
1
�
I
�
I
I
I{
I
I
I
I
I
I
I
I
QI
-
-
_
I
I
I
I
I
I
I
I
I
I
I
I
G\TY Oc
+
'PFN70�
FWD #013
Renton Ave S Rehabilitation
Contract # CAG 19-001
Federal Aid # STPUL
Field Work Directive
Subject: Added Pavement Markings and Signing
Scope:
Date: 11/21/2019
The Contractor is directed to add signing and pavement markings as shown on Plan Sheet
34/CH2, Rev 3.
Plans (attached): Channelization Plan Sheet 34/CH-2
Measurement and Payment:
Payment for the additional pavement markings described above will be per contract bid
items #48 Plastic Crosswalk Line. Payment for the additional permanent signing to be
determined.
By:
Sign ture
Tani Staff d
Project Engineer
� 1 I24I1 �
Dat
Michelle Faltaous
From: Ryan Burks <ryan@rwscottconstruction.com>
Sent: Thursday, June 18, 2020 3:58 PM
To: Tani Stafford
Cc: Michelle Faltaous; Josef Harnden; David Roman -Sanchez, Rodney Roberts
Subject: RE: Renton - CAG 19-001 CO #11
Tani,
The extra signage and pavement markings cost is $8000,
We would also like to request a COVID plan and implementation for $1450.
Let me know if you want this presented on a company letter head.
Thank you,
Ryan Burks
Estimator / Project Manager
4005 West Valley Hwy STE A
Auburn, WA 98001
Ryan@RWScottConstruction.com
(253) 797-9661- Cell m
(253) 351-0001- Office
�Al pry.=I I G(M.
:90ua"al IeX;MAalrlaa,
From: Tani Stafford <tstafford@g-o.com>
Sent: Monday, June 8, 2020 9:33 AM
To: Ryan Burks <ryan@rwscottconstruction.com>
Cc: mfaltaous@rentonwa.gov; jharnden@rentonwa.gov; David Roman -Sanchez <droman-sanchez@g-o.com>; Rodney
Roberts <rroberts@g-o.com>
Subject: Renton - CAG 19-001 CO #11
Ryan - here is a copy of the email sent that summarized changes to permanent signing and chan. We are looking for a
quote from you on the additional signing and the flexible markers and will prepare a CO #11.
am confirming what is required in terms of a Covid Health and Safety Plan.
We would like to keep the WSDOT Fab inspection paper tags that are plastic wrapped on the signal poles/mast arms for
the City files, so don't throw them out when the poles are unwrapped. You can give them to Rod Roberts, who will be
the field inspector.
7:00 am on Monday the 15th if the City controller testing is successful - Tani
From: Tani Stafford <tstafford -o.com>
Sent: Thursday, November 21, 2019 4:55 PM
To: 'Ryan Burks' <r an _rwscottconstruction.com>
Cc: 'Michelle Faltaous' <MFaltaous Rentonwa. ov>;'Josef Harnden' <iharnden rentonwa. ov>;'David Roman -
Sanchez' <droman-sanchezeg-o.com>
Subject: Renton - CAG 19-001- FWD 13
Ryan — here is FWD No 13 and a preliminary punchlist for pavement markings and signing. Please send a quote for the
additional signing and flexible markers noted on this sheet. The other additional items can be paid via existing unit
prices (crosswalk line).
Thanks - Tani
Tani Stafford, P.E. / 206.284.0860 p / 206.283.3206 f
Gray & Osborne, Inc. / 1130 Rainier Avenue South, Suite 300, Seattle, WA, 98144
XIPlease consider the environment before printing this email.
Electronic File Transfer -
Note that these electronic riles are provided as a courtesy only. Gray & Osborne, Inc. in no way guarantees the accuracy or completeness of the digital
data contained within these files. Furthermore, Gray & Osborne, Inc. assumes no liability for any errors or omissions in the digital data herein. Anyone
using the information contained herein should consult the approved or certified hard copy drawings or reports for the most current information available.
CITY OF RENTON
RENTON AVENUE SOUTH RESURFACING
Federal Aid No STP(UL)1201(023)
CONSTRUCTION COST ESTIMATE
June 19, 2020
CAG-19-001
G &O #17534
SCHEDULE A -Additional Strioine and Si2nin2 at Renton Ave Sand S 132nd Street
ITEM
ESTIMATED
UNIT
NO.
DESCRIPTION
QUANTITY
PRICE
AMOUNT
48.
Plastic Crosswalk Line (8-22.5)
-313.50
LF
$3.80
($1,191.30)
1 1-48
Plastic Crosswalk Line (8-22.5)
373.50
LF
$3.80
$1,419.30
1 1-62a
Additional Permanent Signing
70
SF
$60.00
$4,200.00
11-62b
Additional Tubular Markers
6
EA
$92.00
$552.00
11-62c
Additional Sign posts
6
EA
$150.00
$900.00
11-62d
Additional Flaggers/TCS
16
HR
$88.00
$1,408.00
1 1-62e
Markup on Subcontractor ct 12% for items I 1-62a,b,c
0.12
%
$5,652.00
$678.24
Subtotal Schedule A:
$7,966.24
Sales Tax @ 0%
$0.00
Total Schedule A:
$7,966.24
CO No 11 Estimate at 132nd and RAS Page I of I
Change Order Cost (Equitable Adustment)
Project Name: Renton Avenue South Resurfacing
Contractor:
Contract No:
Federal Aid No:
Construction Manager
R.W. Scott Construction
CAG-19-001
STP(UL)-1201(023)
Gray & Osborne, Inc.
Change Order No. 11
By: M. Faltaous
Date:07/01/2020
Bid Item No.
Description
I Quantity
Unit
Unit Price
Estimated Cast
Force Account
Labor
Estimate
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Labor Markup
29%
Equipment
Estimate
Equipment Markup
21%
Materials
Estimate
Materials Markup
21%
Services
Estimate
Services Markup
21%
Mobilization
Estimate
Subcontractor Work
Estimate
Subcontractor Markup
12%, 10%, 7%
Bid Item Change
48
Plastic Crosswalk Line
-313.5
LF
$ 3.80
-$1,191.30
11-48
Plastic Crosswalk Line
373.5
LF
$ 3.80
$1,419.30
11-62
Additional Permanent Signing, including Flexible
Markers
1
LS
$ 7,772.00
$7,772.00
Overhead
Per attached determination
By Agreement
$0.00
Calculated Change Order Cost
$8,0ao.a0
Estimated Change Order Cost
$0.00