Loading...
HomeMy WebLinkAboutContractor Approval Packet - 7/7/2016 Business License City of 1055 South Grady Way Renton,WA 98057(425)430-6851 Fax(425)430-6983 License #: BL.020544 Expiration Date: 10/31/2016 Issued Date: 10/06/2015 ICON MATERIALS PO BOX 3366 II Spokane, WA 99220-3366 `03854 703.1 -Contractor Approval Packet 07/07/2016' Detach License and Post at business location listed below. BUSINESS LICENSE City of .�} Out of City Rs -1NON-TRANSFERABLE License#: BL.020544 Expiration Date: 10/31/2016 ICON MATERIALS NAICS Code: 237310 1508 Valentine Ave SE Pacific, WA 98047 i Mayor Administrative s Administrator Licensee has applied for a City of Renton business license in accordance with Renton Municipal Code(the Code),Title V Business, Chapter 5 Business License.The Licensee agrees to comply with all requirements of the Code,as well as State laws and regulations applicable to the business activity licensed. Post this License at the place of business. This license does not allow licensee to operate a permanent physical location in Renton. 1055 S Grady Way,Renton WA 98057 (425)430-6851 Fax(425)430-6983 licensing@rentonwa.gov Pagel of 3 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Statement of Intent to Pay Prevailing Wage Document Received Date: Intent Id: Affidavit Id: Status: Approved On 6/28/2016 771206 7/6/2016 Company Details ICON MATERIALS UBI#: 601006854 1508 VALENTINE AVE SE Reg#: ICONM**982CF PACIFIC, WA 98047 E-mail: krhinehart@oldcastlematerials.com 206-575-3200 Industrial Insurance Account Id: 70017400 Filed By Rhinehart, Karen Prime Contractor Company Name ICON MATERIALS Contractor Registration No. ICONM**982CF WA UBI Number 601006854 Phone Number 206-575-3200 Project Information Awarding Agency RENTON, CITY OF 1055 S GRADY WAY RENTON, WA- 98055 Awarding Agency Contact Flora Lee Awarding Agency Contact Phone Number 485-430-7303 Contract Number CAG-16-004 Project Name Duvall Ave NE Pavement Preservation Project Bid due date 6/7/2016 Award Date 6/20/2016 https:Hsecureaccess.wa.gov/lni/Pwia/Viewlntent.aspx 7/7/2016 M Page 2 of 3 Project Site Address or Directions Intent Details Does your company intend to hire subcontractors to No perform all work? Does your company intend to hire any subcontractors? Yes Will your company have employees perform work on this Yes project? Do you intend to use any apprentices? (apprentices are Yes considered employees.) Will this project utilize American Recovery and No Reinvestment Act (ARRA) funds? Specifically, will this project utilize any weatherization or No energy efficiency upgrade funds (ARRA or otherwise)? How many owner/operators performing work on the 0 project own 30% or more of the company? What is the estimated contract amount? Or is this a time $1,363,058.30 and materials estimate? Expected project start date: (MM-DD-YYYY) 7/25/2016 In what county(or counties)will the project be done? King In what city (or nearest city)will the project be done? Renton Journey Level Wages County Trade Occupation Wage Fringe # Workers King Laborers General Laborer $43.95 $0.00 1 King Laborers Raker - Asphalt $45.32 $0.00 2 King Power Equipment Operators Mechanics, All (leadmen - $57.51 $0.00 1 $0.50 Per Hour Over Mechanic) King Power Equipment Operators Brooms $53.57 $0.00 1 King Power Equipment Operators Shovel, Excavator, Backhoes, $56.44 $0.00 2 Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel , Excavator, Backhoe, $56.00 $0.00 2 Tractors Under 15 Metric littps:Hsecureaccess.wa.gov/lni/PwiaNiewlntent.aspx 7/7/2016 Page 3 of 3 Tons. King Power Equipment Operators Roller, Other Than Plant Mix $53.57 $0.00 1 King Power Equipment Operators Roller, Plant Mix Or Multi-lift $56.00 $0.00 3 Materials King Power Equipment Operators Spreader, Topsider& $56.94 $0.00 2 Screedman King Power Equipment Operators Material Transfer Device $56.44 $0.00 1 i i King Power Equipment Operators Loader, Overhead, 6 Yards. $56.94 $0.00 1 But Not Including 8 Yards King Truck Drivers Asphalt Mix Over 16 Yards $51.25 $0.00 10 ?! (W. WA Joint Council 28) i King Truck Drivers Asphalt Mix To 16 Yards (W. $50.41 $0.00 5 WA Joint Council 28) King Truck Drivers Dump Truck (W. WA-Joint $50.41 $0.00 3 Council 28) King Truck Drivers Other Trucks (W. WA-Joint $51.25 $0.00 1 Council 28) ID-Show/Hide Existing Notes -- On 6/28/2016:-- General Laborer: Performs work of shoveling with a hand shovel, cleaning-sweeping with a hand broom, heating joints with a Flamo, tacking using a tack bucket. Other Trucks: A Low Boy trailer for deliver and pick up of equipment. https://secureaccess.wa.gov/lni/pwiaNiewlntent.aspx 7/7/2016