HomeMy WebLinkAbout0895.06 SWFR 82A.pdfEarth Solutions NWLLc
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 I Fax (425) 449-4711
www.esnw.com
CONSTRUCTION STORMWATER
GENERAL PERMIT - FIELD REPORT
ESNW Rep. AK
Time On Site
7:45 AM
WAR-307963
Project Name 14500 Talbot Rd. S., Renton Weatherly Inn
Erosion Control BMPs Overall Needs
(13 Elements) Condition Repair?
(good; fair; foor) (Yes; No)
1.Preserve Vegetation; Mark Clearing Limits
• Buffer Zones around Sensitive Areas G N
•Silt Fence
2. Establish Construction Access
• Fabric; Quarry Spalls G N • Wheel Wash
•Sweeper Truck
3. Control Flow Rates
• Stormwater Vault or Facility G N •Straw Wattles
•Check Dams
4. Install Sediment Controls
• Silt Fence
• Straw Bale Barriers
• Vegetation
• Straw G N
• Sediment Ponds, Traps & Filters
• Treatment
• Sediment Pond (Temp. or Perm.)
• Water Truck
5.Stabilize Soils
• Nets & Blankets
• Mulch, Bark & Rock
• Hydroseeding; Grass G N • Plastic Sheeting
• Straw Stockpiles
• Stockpiles
• PAM
6. Protect Slopes G N
• Benching; Track-Walking
• Pipe Slope Drains
• Plastic Sheeting; Anchors
7. Protect Drain Inlets
• Catch Basin Inserts G N
• Gutter; Road
8. Stabilize Channels and Outlets NIA N/A
• Channel Lining
• Check Dam
• Outlet Protection
• Nets and Blankets
9. Control Pollutants NIA N/A
• Chemical Storage Area Covered
• Concrete Handling
10. Control Dewatering NIA N/A
11. Maintain BMPs G N
12. Maintain SWPPP & Site Logbook G N
13. Protect Low-Impact Development (LID BMPs)
• Bioretention Rain Garden Facilities
• Permeable Pavement NIA N/A
��'oc.< Page Report No. 0 5.06 1 of 2 82a
Time Off Site Date Day of Week
8:15 AM 11/25/19 Mon
Reviewed �,">-l1,.
I RJ Development, LLC
Comments
Silt fence working as intended
Sweep roadway when soil is seen on surface,
replenish quarry spalls as needed
Add check dams and straw wattles as needed to
slow stormwater onsite
Add straw as needed throughout the site, 2"
minimum
CB inserts working as intended
N/A
NIA
NIA
See recommended notes
Available upon request
NIA
Earth Solutions I\IWLLc 15365 NE 90 th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 I Fax (425) 449-4711 www.esnw.com
CONSTRUCTION STORMWATER
GENERAL PERMIT -FIELD REPORT
ESNW Rep. AK Time On Site 7:45AM
WAR-307963
Project Name 14500 Talbot Rd. S., Renton Weatherly Inn
Monitoring, Records & Recommendations
..)•.b�.......J,:,u-Page Report No, 0895.06 2 of 2 82a Time Off Site Date Day of Week 8:15AM 11/25/19 Mon
Reviewed
j RJ Development, LLC
Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? D Yes @No List the completed, not-yet-completed, or ongoing action items in the table below:
Actions Items Completed? Date (Yes; .t::10; Qngoing) (If Completed)
Sweep site entrance when soil is seen on roadway Ongoing
Add 2" straw throughout the site over exposed soils as needed Ongoing
Replenish quarry spalls at the main entrance to the site as needed Ongoing
Replace plastic sheeting on exposed slopes as needed Ongoing
Current Weather: 50s° F Clear
Precipitation since last inspection (approximate): 0.27 inches
Precipitation in the last 24 hours (approximate): 0.02 inches
Was water quality sampling part of this inspection? D Yes Iii No
If "Yes": •Record results in the table below.
•Characterize the stormwater discharge, e.g., the presence of suspended sediment, "cloudiness", discoloration, or oil sheen, ifpresent: NIA
•Hanna Turbidity Meter#
Monitoring Location Turbidity pH Notes (NTU)
Is the site in compliance with the SWPPP and the permit requirements? @Yes □No
lf"No": • Indicate the tasks necessary to bring the site into compliance in the table above.•Has the non-compliance been reported to the Department of Ecology?D Yes □No • Should the SWPPP be modified?D Yes □No �f--"This report is true, accurate, and complete to the best of my knowledge and belief."
Inspector Name: Andrew Kimn CESCL Number: CESCL-EF8182309 Inspection Date: 11/25/19
I
i