HomeMy WebLinkAbout0895.06 SWFR 82A.pdfEarth Solutions NWLLc 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 I Fax (425) 449-4711 www.esnw.com CONSTRUCTION STORMWATER GENERAL PERMIT - FIELD REPORT ESNW Rep. AK Time On Site 7:45 AM WAR-307963 Project Name 14500 Talbot Rd. S., Renton Weatherly Inn Erosion Control BMPs Overall Needs (13 Elements) Condition Repair? (good; fair; foor) (Yes; No) 1.Preserve Vegetation; Mark Clearing Limits • Buffer Zones around Sensitive Areas G N •Silt Fence 2. Establish Construction Access • Fabric; Quarry Spalls G N • Wheel Wash •Sweeper Truck 3. Control Flow Rates • Stormwater Vault or Facility G N •Straw Wattles •Check Dams 4. Install Sediment Controls • Silt Fence • Straw Bale Barriers • Vegetation • Straw G N • Sediment Ponds, Traps & Filters • Treatment • Sediment Pond (Temp. or Perm.) • Water Truck 5.Stabilize Soils • Nets & Blankets • Mulch, Bark & Rock • Hydroseeding; Grass G N • Plastic Sheeting • Straw Stockpiles • Stockpiles • PAM 6. Protect Slopes G N • Benching; Track-Walking • Pipe Slope Drains • Plastic Sheeting; Anchors 7. Protect Drain Inlets • Catch Basin Inserts G N • Gutter; Road 8. Stabilize Channels and Outlets NIA N/A • Channel Lining • Check Dam • Outlet Protection • Nets and Blankets 9. Control Pollutants NIA N/A • Chemical Storage Area Covered • Concrete Handling 10. Control Dewatering NIA N/A 11. Maintain BMPs G N 12. Maintain SWPPP & Site Logbook G N 13. Protect Low-Impact Development (LID BMPs) • Bioretention Rain Garden Facilities • Permeable Pavement NIA N/A ��'oc.< Page Report No. 0 5.06 1 of 2 82a Time Off Site Date Day of Week 8:15 AM 11/25/19 Mon Reviewed �,">-l1,. I RJ Development, LLC Comments Silt fence working as intended Sweep roadway when soil is seen on surface, replenish quarry spalls as needed Add check dams and straw wattles as needed to slow stormwater onsite Add straw as needed throughout the site, 2" minimum CB inserts working as intended N/A NIA NIA See recommended notes Available upon request NIA Earth Solutions I\IWLLc 15365 NE 90 th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 I Fax (425) 449-4711 www.esnw.com CONSTRUCTION STORMWATER GENERAL PERMIT -FIELD REPORT ESNW Rep. AK Time On Site 7:45AM WAR-307963 Project Name 14500 Talbot Rd. S., Renton Weatherly Inn Monitoring, Records & Recommendations ..)•.b�.......J,:,u-Page Report No, 0895.06 2 of 2 82a Time Off Site Date Day of Week 8:15AM 11/25/19 Mon Reviewed j RJ Development, LLC Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? D Yes @No List the completed, not-yet-completed, or ongoing action items in the table below: Actions Items Completed? Date (Yes; .t::10; Qngoing) (If Completed) Sweep site entrance when soil is seen on roadway Ongoing Add 2" straw throughout the site over exposed soils as needed Ongoing Replenish quarry spalls at the main entrance to the site as needed Ongoing Replace plastic sheeting on exposed slopes as needed Ongoing Current Weather: 50s° F Clear Precipitation since last inspection (approximate): 0.27 inches Precipitation in the last 24 hours (approximate): 0.02 inches Was water quality sampling part of this inspection? D Yes Iii No If "Yes": •Record results in the table below. •Characterize the stormwater discharge, e.g., the presence of suspended sediment, "cloudiness", discoloration, or oil sheen, ifpresent: NIA •Hanna Turbidity Meter# Monitoring Location Turbidity pH Notes (NTU) Is the site in compliance with the SWPPP and the permit requirements? @Yes □No lf"No": • Indicate the tasks necessary to bring the site into compliance in the table above.•Has the non-compliance been reported to the Department of Ecology?D Yes □No • Should the SWPPP be modified?D Yes □No �f--"This report is true, accurate, and complete to the best of my knowledge and belief." Inspector Name: Andrew Kimn CESCL Number: CESCL-EF8182309 Inspection Date: 11/25/19 I i