Loading...
HomeMy WebLinkAboutExh.35_RRFA_Email_Correspondence.pdf1 Holli Heavrin From:Corey Thomas <cthomas@rentonrfa.org> Sent:Friday, May 15, 2020 9:41 AM To:Holli Heavrin Subject:RE: LUA19-000223 - Canopy PUD Fire Approval Correct, no sprinklers for lots 1-6. From: Holli Heavrin <hhh@coredesigninc.com> Sent: Friday, May 15, 2020 9:40 AM To: Corey Thomas <cthomas@rentonrfa.org> Cc: Matthew Herrera <MHerrera@Rentonwa.gov> Subject: RE: LUA19-000223 - Canopy PUD Fire Approval Thanks Corey, just to confirm, lots 1-6 will not require sprinklers correct? I’ll need to review if there are any other concerns of addressing of the “hammerhead street” but otherwise I think we’re good. Holli Heavrin, P.E. Associate Engineering Technology Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com From: Corey Thomas <cthomas@rentonrfa.org> Sent: Friday, May 15, 2020 9:33 AM To: Holli Heavrin <hhh@coredesigninc.com> Cc: Matthew Herrera <MHerrera@Rentonwa.gov> Subject: RE: LUA19-000223 - Canopy PUD Fire Approval Holli Heavrin, In response to your request and in support of your proposed project, the Renton Regional Fire Authority offers the following requirements for fire apparatus access. Your request for a longer road than code allows for Alley 2 is approved with the condition that all proposed homes fronting this road are equipped with an approved residential fire sprinkler system. Specifically this condition applies to Lots numbered 41 through 47. Proposed hammerhead type turnaround is approved. Your proposed road access for Lots 1 through 6 via the Vault Access road is approved with the condition that these homes are fronted and addressed off of this street, not Alley 1. Lots 1 through 6 may have garage access off of the proposed Alley 1, which will not be used for fire apparatus access. Proposed hammerhead type turnaround is approved. All other proposed lots are fire apparatus accessible from the proposed public street system, Road A and NE 40th Street, and we find these streets acceptable. 2 Corey Thomas Lead Plans Review Inspector Renton Regional Fire Authority 425-276-9582 From: Holli Heavrin <hhh@coredesigninc.com> Sent: Monday, May 11, 2020 3:06 PM To: Corey Thomas <cthomas@rentonrfa.org> Subject: LUA19-000223 - Canopy PUD Fire Approval Hello Corey – As a requirement of our comment letter for the above mentioned project, we are required to reach out the Renton Fire Authority for written approval of Fire Access as shown. I’ve attached a site plan for your reference. Matt Herrera noted that he’d already discussed all of this with you but confirmation is needed for the record and hearing. Fire Access will be served via the following: Lots 1-6 - fire access will be via the Vault Access Road in Tract H Lots 7- 40 and 48-55 will be via Road A Lots 41-47 will be served via Alley 2 The written confirmation is to accept hammerhead turnarounds on Alleys that extend more than 300 feet. Please review and let me know if you have any questions, comments or conditions of approval for the attached layout. A simple email response is acceptable. Thank you! Holli Heavrin, P.E. Associate Engineering Technology Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com