HomeMy WebLinkAboutRFQ (AD) Renton School XingsPage 1 of 3
PUBLIC WORKS DEPARTMENT
TRANSPORTATION SYSTEMS DIVISION
REQUEST FOR QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
RENTON ELEMENTARY AND MIDDLE SCHOOL CROSSINGS PROJECT
The City of Renton (City), in accordance with Policy & Procedure No. 250‐02, is soliciting
statements of qualifications for A&E Professional Services for the project listed below. The City
is seeking consultants with expertise in civil design, construction management, and project
management, with offices located in the State of Washington and licensed to do business in the
State of Washington. Interested consultants must submit Statements of Qualifications (SOQ) as
outlined below.
Project Description
Renton Elementary and Middle School Crossings Project (TIP # 24, 2020‐2025). This project will
provide for pedestrian improvements at the following Renton school crossings within City of
Renton Right‐Of‐Way (ROW). The design elements include: install RRFB systems with push
buttons, a new service cabinet, pedestrian ADA accessible curb ramps, bulb‐outs from the
sidewalks, a center pedestrian refuge island, crosswalks pavement markings at Maplewood
Heights Elementary School, Sierra Heights Elementary School, and McKnight Middle School.
The estimated construction cost is $530,000. The work does not include environmental services
during construction.
Scope of Work
The City intends to select one consulting firm to provide construction management, material
testing, and as‐needed inspection services. Under the direction of the City’s Project Manager,
the selected consultant will provide the following:
Review bid documents (e.g. bid items, bid quantities, measurement and payment
specifications),
Construction management, inspection and record keeping services, and material testing
in conformance with the Washington State Department of Transportation (WSDOT) Local
Agency Guidelines (LAG), Standard Specifications and City of Renton requirements.
Construction support activities provided by others
The following activities will be provided by others, contracted separately with the City:
Engineering support during construction will be provided by the Engineer of Record.
Environmental monitoring of the Contractor’s construction activities for compliance with
all regulatory, environmental permit requirements (if any) will be provided by the City’s
environmental consultant.
Inspection will be provided by City’s Community and Economic Development Department
(CED). Inspection will be as‐needed or fill in during construction.
Information to be provided in State of Qualifications (SOQ)
In addition to the items listed below, submittals from consulting firms must include the firm name
Page 2 of 3
and main phone number; name and e‐mail address for Principal‐in‐Charge and Project Manager;
disciplines provided by the firm and total number of employees within Washington State. Similar
information shall be provided for any sub‐consultants. A Submittal Information Form must be
completed and attached to the SOQ for the prime consultant and each sub‐consultant (if any).
Failure to include a Submittal Information Form will not be evaluated. Refer to WSDOT Local
Agency Guidelines, Chapter 31, Appendix 31.92(a) and (b) for the forms. The consulting firms
must read and understand the sample Construction Management (CM) scope of work provided
in Exhibit A, which is available on the City of Renton web page (see Submittal Section below), and
acknowledge the understanding of the CM scope of work in the SOQ. Failure to acknowledge the
CM scope of work in the SOQ will not be evaluated.
Evaluation Criteria
1. Project Team: (20 points, max.)
2. Project Experience: (40 points total, max.)
3. Project Delivery: (10 points, max)
4. Post Construction Audits: (10 points, max)
5. Completeness and Clarity of SOQ: (20 points, max)
Submittal
Please submit an electronic version of the SOQ in PDF format and write “RE: Construction
Management Services – Renton Elementary & Middle School Crossings Project” in the subject
line to Josef Harnden via e‐mail at JHarnden@rentonwa.gov. Submittals are due no later than
4:00 p.m. (PST) on Friday, September 4, 2020. No submittals will be accepted after that date and
time. Faxed, delivery, and mailed submittals will not be accepted. Any questions regarding the
submittal process and/or the technical aspects of the project should be e‐ mailed to Josef
Harnden at least three (3) business days prior to the submittal deadline.
For all submittal requirements including Exhibit A – sample CM Scope of Work, please review the
complete RFQ, which is available on the City of Renton web page, www.rentonwa.gov/bids/ . This
link will direct you to the City Clerk’s “Call for Bids, Proposals, Qualifications” page.
Under the “Request for Qualifications” section, select “Construction Management Services –
Renton Elementary & Middle School Crossings Project”.
Americans with Disabilities Act (ADA) Information
The City of Renton in accordance with Section 504 of the Rehabilitation Act (Section 504) and the
Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in
all of its programs and activities. This material can be made available in an alternate format by
emailing Joey Harnden at jharnden@rentonwa.gov or by calling collect 425‐430‐7225.
Title VI Statement
The City of Renton in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C.
2000d to 2000d‐4 and Title 49, Code of Federal Regulations, Department of Transportation,
subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the
Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will
affirmatively ensure that in any contract entered into pursuant to this advertisement,
Page 3 of 3
disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity
to submit bids in response to this invitation and will not be discriminated against on the grounds of
race, color, national origin, or sex in consideration for an award.
Terms and Conditions
The City may, at its sole discretion, cancel this Request for Qualifications (RFQ), issue a new RFQ,
reject any or all Statements of Qualifications (SOQs), seek or obtain data from any source that has
the potential to improve the understanding and evaluation of the responses to this RFQ, seek and
receive clarifications to an SOQ and waive any deficiencies, irregularities or technicalities in
considering and evaluating the SOQ’s.
This RFQ does not commit the City to enter into a contract. The City assumes no obligations,
responsibilities and liabilities, fiscal or otherwise, to reimburse all or part of the costs incurred by
the parties responding to this RFQ. All such costs shall be borne solely by each Submitter.
Materials submitted in response to this competitive process shall become the property of the City
and will not be returned. All submittals received will remain confidential until the City and the
selected Consultant sign any contracts resulting from this advertisement. All submittals are
deemed public records as defined in RCW 42.56.
Jason A. Seth, MMC
City Clerk
Published: August 14 & 21, 2020
Daily Journal of Commerce