Loading...
HomeMy WebLinkAboutRFQ (complete) Renton School XingsPage 1 of 4   PUBLIC WORKS DEPARTMENT  TRANSPORTATION SYSTEMS DIVISION  REQUEST FOR QUALIFICATIONS  CONSTRUCTION MANAGEMENT SERVICES  RENTON ELEMENTARY AND MIDDLE SCHOOL CROSSINGS PROJECT    The City of Renton (City), in accordance with Policy & Procedure No. 250‐02, is soliciting  statements of qualifications for A&E Professional Services for the project listed below.  The City  is seeking consultants with expertise in civil design, construction management, and project  management, with offices located in the State of Washington and licensed to do business in the  State of Washington.  Interested consultants must submit Statements of Qualifications (SOQ) as  outlined below.    Project Description    Renton Elementary and Middle School Crossings Project (TIP # 24, 2020‐2025).  This project will  provide for pedestrian improvements at the following Renton school crossings within City of  Renton Right‐Of‐Way (ROW).  The design elements include: install RRFB systems with push  buttons, a new service cabinet, pedestrian ADA accessible curb ramps, bulb‐outs from the  sidewalks, a center pedestrian refuge island, crosswalks pavement markings at Maplewood  Heights Elementary School, Sierra Heights Elementary School, and McKnight Middle School.   The estimated construction cost is $530,000.  The work does not include environmental services  during construction.      Scope of Work  The City intends to select one consulting firm to provide construction management, material  testing, and as‐needed inspection services. The consultant UDBE goal is 0%. Under the direction  of the City’s Project Manager, the selected consultant will provide the following:   Review bid documents (e.g. bid items, bid quantities, measurement and payment  specifications),   Construction management, inspection and record keeping services, and material testing  in conformance with the Washington State Department of Transportation (WSDOT) Local  Agency Guidelines (LAG), Standard Specifications and City of Renton requirements.    Construction support activities provided by others  The following activities will be provided by others, contracted separately with the City:   Engineering support during construction will be provided by the Engineer of Record.   Environmental monitoring of the Contractor’s construction activities for compliance with  all regulatory, environmental permit requirements (if any) will be provided by the City’s  environmental consultant.   Inspection will be provided by City’s Community and Economic Development Department  (CED).  Consultant Inspection will be as‐needed during construction.    Information to be provided in State of Qualifications (SOQ)  In addition to the items listed below, submittals from consulting firms must include the firm name  Page 2 of 4   and main phone number; name and e‐mail address for Principal‐in‐Charge and Project Manager;  disciplines provided by the firm and total number of employees within Washington State.  Similar  information shall be provided for any sub‐consultants.  A Submittal Information Form must be  completed and attached to the SOQ for the prime consultant and each sub‐consultant (if any).  Failure to include a Submittal Information Form will not be evaluated.  Refer to WSDOT Local  Agency Guidelines, Chapter 31, Appendix 31.92(a) and (b) for the forms.  The consulting firms  must read and understand the sample Construction Management (CM) scope of work provided  in Exhibit A and acknowledge the understanding of the CM scope of work in the SOQ.  Failure to  acknowledge the CM scope of work in the SOQ will not be evaluated.    Evaluation Criteria  Project Team: (20 points, max.)  The following information must be provided for each team member proposed for this project.    1. Name, current title with firm and current home office  location  2. Total years of experience in industry, total years of experience with firm  3. Credentials, training certificates  4. Position proposed for the project and availability in 2020, early 2021    Project Experience: (40 points total, max.)  The firm and team members must have demonstrated experience in each of the following  categories for FHWA funded transportation projects that include traffic signal/Rectangular Rapid  Flash Beacons (RRFB) projects and/or new construction and have been completed in the State of  Washington, within the past five (5) years:    1. Construction management.  2. Record keeping and documentation services.  3. Inspection services.  4. Material Testing services.    Provide a list of no more than three (3) projects that demonstrate the team members’ capabilities  for each area listed above.  Provide a brief description for each project, along with a brief  summary of the role(s) each team member had in the project(s).  Projects should only be included  if one or more team members, especially resident engineer(s) and documentation specialist(s),  contributed to the project. Projects describe the firm contributed to the project, without team  members specified will receive no points.     Project Delivery: (10 points, max)  For each project listed in the “Project Experience” section above, provide the following  information:  1. Successful bid amount and final cost of construction. If the final construction cost was  not within the successful bid amount, provide a brief explanation.   2. List the number of working days specified in the original construction contract and  actual number of working days utilized upon completion. If the of number of working  days differ, provide a brief explanation for the difference.   Page 3 of 4     Post Construction Audits: (10 points, max)  Describe the team members’ role in the success of each project listed for the “Project Experience”  section above, including passage of WSDOT Project Management Review (PMR) and Federal  Highway Administration (FHWA) audits.     1. Provide PMR and FHWA audit results for each project, as applicable. If no audits were  performed on any of the projects listed, state this and provide a brief explanation.   2. Provide an explanation if audits resulted in findings.    Completeness and Clarity of SOQ: (20 points, max)  The SOQ must contain all of the required information, organized in a clear manner on a maximum  of eleven (11) single‐sided pages or less, excluding covers, section dividers, cover letter (single  page), resumes and “Submittal Information Form(s)”. The font shall be no smaller than 11‐point.  In addition, a brochure describing the firm may accompany the SOQ and will not be counted as  part of the eleven (11) pages. The firm must provide the acknowledgement to the sample CM  scope of work and agree to the complete scope of work and/or provide a brief explanation to any  task(s) not feasible for this project or cannot be delivered by the firm.    Consultant Evaluation and Selection Process  After the SOQs have been evaluated, the highest ranked firm(s) will be asked to submit a list of  references and interviewed.  All firms submitting SOQs will be notified in writing as to their status  in the selection process.  Final selection of the most qualified firm will be made primarily upon the  written SOQs and interview(s).    The City will notify the selected firm in writing, meet with the consultant to reach a complete and  mutual understanding of the scope of services, and begin contract negotiations based on the level  of effort deemed appropriate for the project.  If a satisfactory contract cannot be negotiated, the  City will terminate the negotiations with that firm and attempt to negotiate a contract with the  next most qualified firm.  The process will continue until an agreement is reached or the search is  terminated.    Submittal  Please submit an electronic version of the SOQ in PDF format and write “RE: Construction  Management Services – Renton Elementary & Middle School Crossings Project” in the subject  line to Josef Harnden via e‐mail at JHarnden@rentonwa.gov.  Submittals are due no later than  4:00 p.m. (PST) on Friday, September 4, 2020.  No submittals will be accepted after that date and  time.  No outside visitors, including UPS and FedEx delivery, are allowed directly onto the 5th Floor  at City Hall due to COVID‐19 regulations. Faxed and mailed submittals will not be accepted.    Any questions regarding the submittal process and/or the technical aspects of the project should  be e‐ mailed to Josef Harnden at JHarnden@rentonwa.gov.  Please write the RFQ title in the  subject line.  Any questions submitted within three (3) business days of the submittal deadline  may not be addressed.    Page 4 of 4   Americans with Disabilities Act (ADA) Information  The City of Renton in accordance with Section 504 of the Rehabilitation Act (Section 504) and the  Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in  all of its programs and activities.  This material can be made available in an alternate format by  emailing Joey Harnden at jharnden@rentonwa.gov or by calling collect 425‐430‐7225.    Title VI Statement  The City of Renton in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C.  2000d to 2000d‐4 and Title 49, Code of Federal Regulations, Department of Transportation,  subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the  Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will  affirmatively ensure that in any contract entered into pursuant to this advertisement,  disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity  to submit bids in response to this invitation and will not be discriminated against on the grounds of  race, color, national origin, or sex in consideration for an award.    Terms and Conditions  The City may, at its sole discretion, cancel this Request for Qualifications (RFQ), issue a new RFQ,  reject any or all Statements of Qualifications (SOQs), seek or obtain data from any source that has  the potential to improve the understanding and evaluation of the responses to this RFQ, seek and  receive clarifications to an SOQ and waive any deficiencies, irregularities or technicalities in  considering and evaluating the SOQ’s.    This RFQ does not commit the City to enter into a contract.  The City assumes no obligations,  responsibilities and liabilities, fiscal or otherwise, to reimburse all or part of the costs incurred by  the parties responding to this RFQ. All such costs shall be borne solely by each Submitter.    Materials submitted in response to this competitive process shall become the property of the City  and will not be returned.  All submittals received will remain confidential until the City and the  selected Consultant sign any contracts resulting from this advertisement.  All submittals are  deemed public records as defined in RCW 42.56.