Loading...
HomeMy WebLinkAboutR-4038080 3 C E F G H GENERAL NOTES: w U Z W w U- w 00 C'7 O O Nt 0 w I— z O z w ry II O W, K3 3 > co X co 00 M 0) N O U 0 0 00 rn 0 0 3 N It 2 3 00 N 0 ti 0 / o -0 z J o °, J ry O X CO co M co It O � U 0 Q 3 000 p �I ry 0 0 C ���"t o M � >, co i w m " E O X � � 81 D ,b N 5 .30� N _� j 'o J a co �I J 0o o b of l : F- LL 0-0 W 3 U 0-X - N O U V 0 w w U) O O + O N Q W w z J U CQ G K11011111 21+00 22+00 N COMPLIANCE WITH CITY OF RENTON STANDARDS MENT ENGINEERING Frnair 01 /22/2019 0 0 MIM1111 �,I..�. //A01%® ca CAROLLO ENGINEERS, INC. 1218 3RD STREET, SUITE 1600 SEATTLE, WA 98101 PH:206-684-6532 FAX:206-903-0419 C PLAN (STA 20+00 - 30+00) mulff 25+00 ELEVATION PERMIT ISSUE DRAWING This document version is designed to contain sufficient relevant information for the applicable Permit Review submittal and approval process. JAN UARY 2019 W01I11 This document is released for the purpose of information exchange review and planning only under the authority of Erik J. Waligorski, P.E. (Washington License No. 38087) on January, 2019. It is not to be used for bidding, permit or construction purposes. 27+00 This document is released for the purpose of information exchange review and planning only under the authority of Brian A. Sliger, P.E. (Washington License No. 55635) on January, 2019. It is not to be used for bidding, permit or construction purposes. E 40 20 0 40 80 SCALE IN FEET (HORIZ) DESIGNED/DRAWN: CHECKED: B. HAWES E. WALIGORSKI/ G. GOULD PROJECT ENGINEER: SCALE: B. SLIGER AS NOTED DESIGN APPROVAL: FACILITY NUMBER: B. ISAAC NONE PROJECT ACCEPTANCE: CONTRACT NO: M. DARBY C01307C18 O U V 0 w w U) O O + O ('7 Q W w z_ J U CQ G 5 2.5 0 5 10 SCALE IN FEET (VERY) 6II1111 01IM1I11 150 145 140 135 130 125 120 115 105 100 95 90 1. SEE DWG G002 FOR KEY MAP. 2. SEE DWG G002 FOR ADDITIONAL LEGEND, ABBREVIATIONS, AND SYMBOLS. 3. SEE DWG G004 FOR DESIGN DATA. 4. SEE DWG G005 FOR GENERAL PROJECT NOTES. 5. ALL SURFACES TO BE REHABILITATED SHALL BE CLEANED PER SECTION 09 97 50 OF SPECIFICATIONS PRIOR TO APPLYING LINABOND. 6. SEE DWG G004 FOR TABLE OF MEASURED DEBRIS VOLUMES WITHIN PIPE SECTIONS. DEBRIS TO BE REMOVED PRIOR TO REHABILITATION PER SECTION 09 97 50 OF THE SPECIFICATIONS. 7. THE CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL PER THE APPROVED TRAFFIC CONTROL PLAN (TCP). SEE SECTION 01 55 26 OF SPECIFICATIONS FOR THE TCP REQUIREMENTS. CONTRACTOR MUST HAVE AN APPROVED TCP PRIOR TO ANY WORK WITHIN THE CITY OF RENTON R/W. 8. SEE SECTION 01 35 43 OF THE SPECIFICATIONS FOR SOIL MANAGEMENT REQUIREMENTS ON BOEING PROPERTY. KEY NOTES: 1O SEE SECTION 01 41 26 OF SPECIFICATIONS FOR APPROVED WORK/STAGING AREAS AND TRAFFIC CONTROL PLAN. O2 MAINTENANCE HOLE TO BE REHABILITATED PER DETAIL 2, DWG C106. OTEMPORARY SECURITY FENCING FOR ACCESS TO MH R02-06. REMOVE WROUGHT IRON FENCE AND REPLACE FOLLOWING CONSTRUCTION PER DWG L100-L101. O4 REMOVE EXISTING FRP LADDER AND BRACKETS FROM MAINTENANCE HOLE. OINSTALL LINABOND LINER IN EXISTING PIPE PER DETAIL 1, DWG C106. OEXISTING SERVICE CONNECTION TO ESI PIPE. ROUTE FLOWS BELOW WORKING PLATFORM PER DETAIL 1, DWG C106. O7 PROVIDE COORDINATION WITH KING COUNTY METRO FOR RELOCATION OF BUS STOP AS REQUIRED BY SECTION 01 55 26 AND APPROVED TCP. O8 PROVIDE STREET TREE PROTECTION IN WORK AREA AS NECESSARY. STREET TREES ARE NOT TO BE DAMAGED OR REMOVED WITHOUT PRIOR APPROVAL FROM THE CITY OF RENTON AND PROJECT REPRESENTATIVE. LEGEND SEWER PIPE/MANHOLE TO BE REHABILITATED WORK AREA HCOORDINATE CONTROL POINTS (TYP) (SEE DWG 0004) TEMPORARY SECURITY FENCING MERIDIAN W.S.L.G.N.Z. NAD 83/2011 (BELLEVUE) METRO DATUM Know what's below. Call before you dig. DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISION ItLaEASTSIDE INTERCEPTOR SECTION 2 REHABILITATION - PHASE II Icing Clounty PLAN AND PROFILE STA 20+00 TO 30+00 F IF G CITY OF RENTON #: R-403808 DATE: JAN UARY 2019 PROJECT FILE NO: 16-1123630 DRAWING NO: C 103 SHT NO / TOTAL REV 0 8 36 No 1