HomeMy WebLinkAboutR-4038080
3
C
E
F
G
H
GENERAL NOTES:
w
U
Z
W
w
U-
w
00
C'7
O
O
Nt
0
w
I—
z
O
z
w
ry
II
O
W,
K3
3
>
co
X
co
00
M
0)
N
O
U
0
0
00
rn
0
0
3
N
It
2
3
00
N
0
ti
0 /
o -0
z
J
o
°,
J ry
O X
CO
co
M
co It
O �
U
0
Q
3 000 p
�I ry
0
0 C
���"t
o M
� >, co
i w m
" E
O X
� � 81
D ,b N
5 .30�
N
_�
j 'o
J a co �I
J 0o
o b of
l : F- LL
0-0 W
3 U 0-X -
N
O
U
V
0
w
w
U)
O
O
+
O
N
Q
W
w
z
J
U
CQ
G
K11011111
21+00
22+00
N COMPLIANCE WITH CITY OF RENTON STANDARDS
MENT ENGINEERING
Frnair
01 /22/2019
0
0
MIM1111
�,I..�. //A01%®
ca
CAROLLO ENGINEERS, INC.
1218 3RD STREET,
SUITE 1600
SEATTLE, WA 98101
PH:206-684-6532 FAX:206-903-0419
C
PLAN
(STA 20+00 - 30+00)
mulff
25+00
ELEVATION
PERMIT ISSUE DRAWING
This document version is designed to contain
sufficient relevant information for the applicable
Permit Review submittal and approval process.
JAN UARY 2019
W01I11
This document is released for
the purpose of information
exchange review and planning
only under the authority of
Erik J. Waligorski, P.E.
(Washington License No.
38087) on January, 2019. It is
not to be used for bidding,
permit or construction
purposes.
27+00
This document is released for
the purpose of information
exchange review and planning
only under the authority of
Brian A. Sliger, P.E.
(Washington License No.
55635) on January, 2019. It is
not to be used for bidding,
permit or construction
purposes.
E
40 20 0 40 80
SCALE IN FEET (HORIZ)
DESIGNED/DRAWN:
CHECKED:
B. HAWES
E. WALIGORSKI/
G. GOULD
PROJECT ENGINEER:
SCALE:
B. SLIGER
AS NOTED
DESIGN APPROVAL:
FACILITY NUMBER:
B. ISAAC
NONE
PROJECT ACCEPTANCE: CONTRACT NO:
M. DARBY C01307C18
O
U
V
0
w
w
U)
O
O
+
O
('7
Q
W
w
z_
J
U
CQ
G
5 2.5 0 5 10
SCALE IN FEET (VERY)
6II1111
01IM1I11
150
145
140
135
130
125
120
115
105
100
95
90
1. SEE DWG G002 FOR KEY MAP.
2. SEE DWG G002 FOR ADDITIONAL LEGEND,
ABBREVIATIONS, AND SYMBOLS.
3. SEE DWG G004 FOR DESIGN DATA.
4. SEE DWG G005 FOR GENERAL PROJECT NOTES.
5. ALL SURFACES TO BE REHABILITATED SHALL BE
CLEANED PER SECTION 09 97 50 OF
SPECIFICATIONS PRIOR TO APPLYING LINABOND.
6. SEE DWG G004 FOR TABLE OF MEASURED DEBRIS
VOLUMES WITHIN PIPE SECTIONS. DEBRIS TO BE
REMOVED PRIOR TO REHABILITATION PER
SECTION 09 97 50 OF THE SPECIFICATIONS.
7. THE CONTRACTOR SHALL PROVIDE TRAFFIC
CONTROL PER THE APPROVED TRAFFIC CONTROL
PLAN (TCP). SEE SECTION 01 55 26 OF
SPECIFICATIONS FOR THE TCP REQUIREMENTS.
CONTRACTOR MUST HAVE AN APPROVED TCP
PRIOR TO ANY WORK WITHIN THE CITY OF
RENTON R/W.
8. SEE SECTION 01 35 43 OF THE SPECIFICATIONS
FOR SOIL MANAGEMENT REQUIREMENTS ON
BOEING PROPERTY.
KEY NOTES:
1O SEE SECTION 01 41 26 OF SPECIFICATIONS FOR
APPROVED WORK/STAGING AREAS AND TRAFFIC
CONTROL PLAN.
O2 MAINTENANCE HOLE TO BE REHABILITATED PER
DETAIL 2, DWG C106.
OTEMPORARY SECURITY FENCING FOR ACCESS TO
MH R02-06. REMOVE WROUGHT IRON FENCE AND
REPLACE FOLLOWING CONSTRUCTION PER DWG
L100-L101.
O4 REMOVE EXISTING FRP LADDER AND BRACKETS
FROM MAINTENANCE HOLE.
OINSTALL LINABOND LINER IN EXISTING PIPE PER
DETAIL 1, DWG C106.
OEXISTING SERVICE CONNECTION TO ESI PIPE.
ROUTE FLOWS BELOW WORKING PLATFORM PER
DETAIL 1, DWG C106.
O7 PROVIDE COORDINATION WITH KING COUNTY
METRO FOR RELOCATION OF BUS STOP AS
REQUIRED BY SECTION 01 55 26 AND APPROVED
TCP.
O8 PROVIDE STREET TREE PROTECTION IN WORK
AREA AS NECESSARY. STREET TREES ARE NOT
TO BE DAMAGED OR REMOVED WITHOUT PRIOR
APPROVAL FROM THE CITY OF RENTON AND
PROJECT REPRESENTATIVE.
LEGEND
SEWER PIPE/MANHOLE TO BE
REHABILITATED
WORK AREA
HCOORDINATE CONTROL POINTS (TYP)
(SEE DWG 0004)
TEMPORARY SECURITY FENCING
MERIDIAN
W.S.L.G.N.Z.
NAD 83/2011 (BELLEVUE)
METRO DATUM
Know what's below.
Call before you dig.
DEPARTMENT OF NATURAL RESOURCES & PARKS
WASTEWATER TREATMENT DIVISION
ItLaEASTSIDE INTERCEPTOR SECTION 2
REHABILITATION - PHASE II
Icing Clounty PLAN AND PROFILE
STA 20+00 TO 30+00
F IF G
CITY OF RENTON #:
R-403808
DATE:
JAN UARY 2019
PROJECT FILE NO:
16-1123630
DRAWING NO:
C 103
SHT NO / TOTAL REV 0
8 36 No
1