Loading...
HomeMy WebLinkAboutR-4038090 0 E F G H GENERAL NOTES: w U Z W w U- w OD CIO O O Nt 0 LLJ I— z O z LLJ ry LL O W, Ica 3 co X co 0 M 0) N O 00 0 0 Q rn 00 0 3 N It m 2 00 N 0 ti 0) o -0 z J 0 °CL J IY O X CO co M O U Q 3 000 p 0 AX C 3 "t o M l � 2 I- >, co i w m " E rn o (D <14 o0 CM O N co D , N 5 .30� CD N J Q M C:I j 0) 0) o So � e a) o l : F- U- 0-0 W 3 U d X I I co O r 0 I (D LLJ LLJ U) O O + O CM Q W UJI z_ J U CQ G KIN I UN, VVA 9bUbb IN OIVI PLI % ICE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING 0 rnair 01 /22/2019 L:3 C2nICC CAROLLO ENGINEERS, INC. 1218 3RD STREET, SUITE 1600 SEATTLE, WA 98101 PH:206-684-6532 FAX:206-903-0419 NNAIIIIIII1110% PLAN (STA 30+00 - 40+00) ELEVATION PERMIT ISSUE DRAWING This document version is designed to contain sufficient relevant information for the applicable Permit Review submittal and approval process. JAN UARY 2019 PUGET SOUND ENERGY/ ELEC 082305 9178 920 LAKE WASHINGTON BLVD N RENTON, WA 98055 This document is released for the purpose of information exchange review and planning only under the authority of Erik J. Waligorski, P.E. (Washington License No. 38087) on January, 2019. It is not to be used for bidding, permit or construction purposes. This document is released for the purpose of information exchange review and planning only under the authority of Brian A. Sliger, P.E. (Washington License No. 55635) on January, 2019. It is not to be used for bidding, permit or construction purposes. E 40 20 0 40 80 SCALE IN FEET (HORIZ) DESIGNED/DRAWN: CHECKED: B. HAWES E. WALIGORSKI/ G. GOULD PROJECT ENGINEER: SCALE: B. SLIGER AS NOTED DESIGN APPROVAL: FACILITY NUMBER: B. ISAAC NONE PROJECT ACCEPTANCE: CONTRACT NO: M. DARBY C01307C18 L0 O �Un V W W U) O O + O Nt Q W Uj z_ J U CQ G 5 2.5 0 5 10 SCALE IN FEET (VERY) 150 145 140 135 130 125 120 1. SEE DWG G002 FOR KEY MAP. 2. SEE DWG G002 FOR ADDITIONAL LEGEND, ABBREVIATIONS, AND SYMBOLS. 3. SEE DWG G004 FOR DESIGN DATA. 4. SEE DWG G005 FOR GENERAL PROJECT NOTES. 5. ALL SURFACES TO BE REHABILITATED SHALL BE CLEANED PER SECTION 09 97 50 OF SPECIFICATIONS PRIOR TO APPLYING LINABOND. 6. SEE DWG G004 FOR TABLE OF MEASURED DEBRIS VOLUMES WITHIN PIPE SECTIONS. DEBRIS TO BE REMOVED PRIOR TO REHABILITATION PER SECTION 09 97 50 OF THE SPECIFICATIONS. 7. THE CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL PER THE APPROVED TRAFFIC CONTROL PLAN (TCP). SEE SECTION 01 55 26 OF SPECIFICATIONS FOR THE TCP REQUIREMENTS. CONTRACTOR MUST HAVE AN APPROVED TCP PRIOR TO ANY WORK WITHIN THE CITY OF RENTON R/W. 8. SEE SECTION 01 35 43 OF THE SPECIFICATIONS FOR SOIL MANAGEMENT REQUIREMENTS ON BOEING PROPERTY. KEY NOTES: OSEE SECTION 01 41 26 OF SPECIFICATIONS FOR APPROVED WORK/STAGING AREAS AND TRAFFIC CONTROL PLAN. O2 BYPASS INTAKE AREA. SEE BYPASS PUMPING PLANS (DWGS CT108-CT110). OMAINTENANCE HOLE TO BE REHABILITATED PER DETAIL 2, DWG C106. 4O PREVIOUS ESI REHABILITATION PROJECT WITH LINABOND LINER EXTENDED APPROXIMATELY 200' DOWNSTREAM OF MH R02-08. PIPE REHABILITATION COMPLETED WITH THIS PROJECT SHALL OVERLAP THE EXISTING REHABILITATION BY A MINIMUM OF 4" PER DETAIL 3, DWG C107. OINSTALL LINABOND LINER IN EXISTING PIPE PER DETAIL 1, DWG C106. OMAINTAIN ALL EXISTING ACCESS TO ELECTRICAL SUBSTATION DURING CONSTRUCTION. O7 EXISTING SERVICE CONNECTION TO ESI PIPE. ROUTE FLOWS BELOW WORKING PLATFORMS PER DETAIL 1, DWG C106. OAREA RESERVED FOR PROJECT JOB TRAILER(S) AND CONSTRUCTION PARKING. LEGEND ® SEWER PIPE TO BE REHABILITATED WORK AREA STAGING AREA FXX COORDINATE CONTROL POINTS (TYP) x x(SEE DWG 0004) MERIDIAN 115 w.S.L.G.N.z. NAD 83/2011 (BELLEVUE) 105 100 95 90 Know what's below. Call before you dig. DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISION LaEASTSIDE INTERCEPTOR SECTION 2 REHABILITATION - PHASE II Icing Clounty PLAN AND PROFILE STA 30+00 TO 40+00 F IF G CITY OF RENTON #: R-403809 DATE: JANUARY 2019 PROJECT FILE NO: 16-1123630 DRAWING NO: C104 SHT NO / TOTAL I REV 9 36 NO:0 1