GENERAL NOTES:
w
U
Z
W
w
U-
w
OD
CIO
O
O
Nt
0
LLJ
I—
z
O
z
LLJ
ry
LL
O
W,
Ica
3
co
X
co
0
M
0)
N
O
00
0
0
Q
rn
00
0
3
N
It
m 2
00
N
0
ti
0)
o -0
z
J
0
°CL
J IY
O X
CO
co
M
O
U
Q
3 000 p
0 AX
C
3 "t
o M
l � 2
I- >, co
i w m
" E
rn o
(D <14 o0
CM O
N co
D , N
5 .30�
CD N
J Q M C:I
j 0) 0) o
So � e a)
o
l : F- U-
0-0 W
3 U d X
I
I
co
O
r
0 I
(D
LLJ
LLJ
U)
O
O
+
O
CM
Q
W
UJI
z_
J
U
CQ
G
KIN I UN, VVA 9bUbb
IN OIVI PLI % ICE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING 0
rnair 01 /22/2019
L:3
C2nICC
CAROLLO ENGINEERS, INC.
1218 3RD STREET,
SUITE 1600
SEATTLE, WA 98101
PH:206-684-6532 FAX:206-903-0419
NNAIIIIIII1110%
PLAN
(STA 30+00 - 40+00)
ELEVATION
PERMIT ISSUE DRAWING
This document version is designed to contain
sufficient relevant information for the applicable
Permit Review submittal and approval process.
JAN UARY 2019
PUGET SOUND ENERGY/ ELEC
082305
9178
920 LAKE WASHINGTON BLVD N
RENTON, WA 98055
This document is released for
the purpose of information
exchange review and planning
only under the authority of
Erik J. Waligorski, P.E.
(Washington License No.
38087) on January, 2019. It is
not to be used for bidding,
permit or construction
purposes.
This document is released for
the purpose of information
exchange review and planning
only under the authority of
Brian A. Sliger, P.E.
(Washington License No.
55635) on January, 2019. It is
not to be used for bidding,
permit or construction
purposes.
E
40 20 0 40 80
SCALE IN FEET (HORIZ)
DESIGNED/DRAWN:
CHECKED:
B. HAWES
E. WALIGORSKI/
G. GOULD
PROJECT ENGINEER:
SCALE:
B. SLIGER
AS NOTED
DESIGN APPROVAL:
FACILITY NUMBER:
B. ISAAC
NONE
PROJECT ACCEPTANCE: CONTRACT NO:
M. DARBY C01307C18
L0
O
�Un
V
W
W
U)
O
O
+
O
Nt
Q
W
Uj
z_
J
U
CQ
G
5 2.5 0 5 10
SCALE IN FEET (VERY)
150
145
140
135
130
125
120
1. SEE DWG G002 FOR KEY MAP.
2. SEE DWG G002 FOR ADDITIONAL LEGEND,
ABBREVIATIONS, AND SYMBOLS.
3. SEE DWG G004 FOR DESIGN DATA.
4. SEE DWG G005 FOR GENERAL PROJECT NOTES.
5. ALL SURFACES TO BE REHABILITATED SHALL BE
CLEANED PER SECTION 09 97 50 OF
SPECIFICATIONS PRIOR TO APPLYING LINABOND.
6. SEE DWG G004 FOR TABLE OF MEASURED DEBRIS
VOLUMES WITHIN PIPE SECTIONS. DEBRIS TO BE
REMOVED PRIOR TO REHABILITATION PER
SECTION 09 97 50 OF THE SPECIFICATIONS.
7. THE CONTRACTOR SHALL PROVIDE TRAFFIC
CONTROL PER THE APPROVED TRAFFIC CONTROL
PLAN (TCP). SEE SECTION 01 55 26 OF
SPECIFICATIONS FOR THE TCP REQUIREMENTS.
CONTRACTOR MUST HAVE AN APPROVED TCP
PRIOR TO ANY WORK WITHIN THE CITY OF
RENTON R/W.
8. SEE SECTION 01 35 43 OF THE SPECIFICATIONS
FOR SOIL MANAGEMENT REQUIREMENTS ON
BOEING PROPERTY.
KEY NOTES:
OSEE SECTION 01 41 26 OF SPECIFICATIONS FOR
APPROVED WORK/STAGING AREAS AND TRAFFIC
CONTROL PLAN.
O2 BYPASS INTAKE AREA. SEE BYPASS PUMPING
PLANS (DWGS CT108-CT110).
OMAINTENANCE HOLE TO BE REHABILITATED PER
DETAIL 2, DWG C106.
4O PREVIOUS ESI REHABILITATION PROJECT WITH
LINABOND LINER EXTENDED APPROXIMATELY 200'
DOWNSTREAM OF MH R02-08. PIPE
REHABILITATION COMPLETED WITH THIS
PROJECT SHALL OVERLAP THE EXISTING
REHABILITATION BY A MINIMUM OF 4" PER DETAIL
3, DWG C107.
OINSTALL LINABOND LINER IN EXISTING PIPE PER
DETAIL 1, DWG C106.
OMAINTAIN ALL EXISTING ACCESS TO ELECTRICAL
SUBSTATION DURING CONSTRUCTION.
O7 EXISTING SERVICE CONNECTION TO ESI PIPE.
ROUTE FLOWS BELOW WORKING PLATFORMS
PER DETAIL 1, DWG C106.
OAREA RESERVED FOR PROJECT JOB TRAILER(S)
AND CONSTRUCTION PARKING.
LEGEND
® SEWER PIPE TO BE REHABILITATED
WORK AREA
STAGING AREA
FXX COORDINATE CONTROL POINTS (TYP)
x x(SEE DWG 0004)
MERIDIAN
115 w.S.L.G.N.z.
NAD 83/2011 (BELLEVUE)
105
100
95
90
Know what's below.
Call before you dig.
DEPARTMENT OF NATURAL RESOURCES & PARKS
WASTEWATER TREATMENT DIVISION
LaEASTSIDE INTERCEPTOR SECTION 2
REHABILITATION - PHASE II
Icing Clounty PLAN AND PROFILE
STA 30+00 TO 40+00
F IF G
CITY OF RENTON #:
R-403809
DATE:
JANUARY 2019
PROJECT FILE NO:
16-1123630
DRAWING NO:
C104
SHT NO / TOTAL I REV
9 36 NO:0
1