HomeMy WebLinkAboutR-4038310
C A D
4
F
G A H
w
U
Z
W
ry
W
LL
W
ry
0
00
M
O
1
O
lit
W
I-
z
z
W
ry
LL
A,
u
3
2
1
NO
SDMH 4308 A x
RIM EL=125.73 X
PIPES NOT VSIBLE
BTM EL=114I
x
— — — x
X
— X
X
_ SDMH 4490
_ RI EL=124.65
� X I
-�� X STRUCTURE P
_ AVED OVER
X RAILROAD — — — — — _ x NOT AS —BUILT
TRACKS X
----- — _ — X
--------------- = ---------------_ — _ SIDEwAL — — — x
RIM EL=124.57
IE(NE) 48 "RCP-120.11
BTM EL=115.4
GENERAL NOTES:
1. SAWCUT EXISTING PAVEMENT FOR UNDERGROUND
RACEWAY AND PAVE OVER TEMPORARILY. REMOVE
UNDERGROUND RACEWAY AFTER STATION IS
DECOMMISSIONED AND REPLACE PERMANENT
PAVEMENT.
2. CABLES SHOWN AS INSTALLED ABOVE GRADE MAY BE
INSTALLED BELOW GRADE AS NEEDED TO ENSURE
ADEQUATE PROTECTION FROM DAMAGE. SUITABLY
PROTECT ALL ELECTRICAL CABLE AND EQUIPMENT. SIZE
ALL CABLE AND RACEWAY PER NEC AND
MANUFACTURER GUIDELINES.
KEY NOTES:
-�___--- - _ K _ _ X v PROVIDE EXCAVATION FOR A TRANSFORMER VAULT IF A
----- --------- = — — — >< VAULT IS REQUIRED BY PSE.
IX
-- — — O2 COORDINATE SERVICE PRIMARY TRENCHING
O----------------- 96, METRO SEWER-------------� REQUIREMENTS WITH PSE.
+ \� \� O -- -- — — — —, _ O3 PROVIDE GUARD POSTS AROUND SERVICE TRANSFORMER
\ PARCEL CONCRETE
082305-9057 I
\ \ I PUGET SOUND ENERGY P
I• —
� � IX
�-- ----- -- ----- -
SDMH 4343 - 48= P O - - -
RIM
X PIPES NOT VISIBLE
I BTM EL=113.9X
EXISTING
PSE POLE 31856 166205 _x
x
Y
CB 4408
RIM EL=123.7
[P10] t(NE)24"RCP=119.1
i IE(S)12"RCP=119.
BTM EL=118.1 3
— PANELBOARD PB3
—/ x
X\ �.j // \ GRASS
iQ Q/
_
_-�--- - ----X -
m��— — — — LANDSCAPED—
L9 .
APPROXIMATE JOB
TRAILER LOCATIONS
PAR�AVE N
X_ — EX
PANELBOARD PB2
PROPOSED PSE
SERVICE
TRANSFORMER —
PROPOSED PSE
o Q METERING SECTION
n = LOCATION
rn(n
� rl
m Q
APPROXIMATE VFD AND ---------------------- -- -- T--__= PER PSE REQUIREMENTS.
UMP INSTALLATION --- --- _ II_- 96" METRO SEWER
AREA II ------ — 4a-� - = W
- XXx---------------------
---------48"-------------------- _---il---
X
a
X
SERVICE PRIMARY
[P01 ]
[P08]
[P02]
;URB
+ X
CB 45 \ \�
RIM EL_ 65
-124.03
X X X X NOT gS_BUILT; X \�
BLOCKED �t
----------- - - - - - - - - - - - - - _ --
— - — — — — — — — — — — —
YYPI AL CABt� — 12» X
TO VFDs C C
0
TRANSFORMER AND I I
PANELBOARD PB1 III /
a
_ [P09] /
[PO4]
B U a —
P
rr
-----X— ___X_ — — Bus �U U— °
rfx�, P
RIUNITY'
REVISION DESCRIPTION BY APVD DATE
B C
PERMIT ISSUE DRAWING
JANUARY 2019
This document is released for
the purpose of information
exchange review and planning
only under the authority of
Richard E. Hensel, P.E.
(Washington License No.
38424) on January, 2019. It is
not to be used for bidding,
permit or construction
purposes.
—m- m PEL
-—X------ O X.
►� - --��®
PROPOSED MOBILE I
GENERATOR
o
0
PROPOSED ATS �
AND SWITCHBOARD2.
_1�
l
X
�F
CROS;
20 10 0 20 40
SCALE IN FEET
'HIS SHEET HAS NOT BEEN REVIEWD AND HAS NOT BEEN APPROVED WITH THIS CIVIL CONSTRUCTION PERMIT PLAN SET.
DESIGNED/DRAWN:
CHECKED:
R. HENSEL
J. THOMAS
PROJECT ENGINEER:
SCALE:
B. SLIGER
1" = 20'
DESIGN APPROVAL:
FACILITY NUMBER:
B. ISAAC
PROJECT ACCEPTANCE: CONTRACT NO:
M. DARBY C01307C18
DEPARTMENT OF NATURAL RESOURCES & PARKS
WASTEWATER TREATMENT DIVISION
EASTSIDE INTERCEPTOR SECTION 2
REHABILITATION - PHASE II
ELECTRICAL
SITE PLAN
1
z
Q
J_
m
Q
�W//
N
z
0
U
Lu
U)
w
U
w
MERIDIAN z
W.S.L.G.N.Z. —
NAD 83/2011 (BELLEVUE) LU
U)
DATUM U)
Q
W
METRO DATUM
Q
75
LL
z
U
W
0
n
z
0
I—
DATE:
JAN UARY 2019
z
W
PROJECT FILE NO:
n/
16-1123630
LL
DRAWING NO:
0
El 02
>-
SHT NO / TOTAL
REV
31 36
NO:
0
U
0
0
F
i