Loading...
HomeMy WebLinkAboutR-411403:l T - DEMOLITION CALLOUTS: 1 1. DEMOLISH EXISTING ON -SITE CONCRETE AND/OR ASPHALT AND DISPOSE OF O OFFSITE. qt 2. DEMOLISH EXISTING FUEL CANOPY, FUEL DISPENSERS, FUEL ISLANDS, AND Q 1 APPURTENANCES AND DISPOSE OF OFFSITE (TYPICAL). W 3. DEMOLISH EXISTING UNDERGROUND STORAGE TANK (UST) AND FUEL DISPENSER H CONCRETE SLAB AND DISPOSE OFFSITE.TANKS SHOULD BE DECOMMISSIONED, REMOVED AND DISPOSED OF PER APPLICABLE DEPARTMENT OF ECOLOGY AND CITY OF RENTON/KING COUNTY REQUIREMENTS. SEE DEEP EXCAVATION NOTE THIS SHEET. 4. CONTRACTOR TO PROVIDE SEPARATE SHORING PERMIT AND DESIGN AS NECESSARY TO REMOVE EXISTING UST SYSTEM. PER GEOTECH REPORT, VISUAL MONITORING OF TANK EXCAVATION IS RECOMMENDED AND TEMPORARY SHORING IS IMPLEMENTED UPON OBSERVATION OF UNSTABLE SLOPES. 5. REMOVE EXISTING CHANNELIZATION MARKERS (TYPICAL) AND DISPOSE OFFSITE. 6. CONTRACTOR TO COORDINATE RELOCATION AND PROTECTION OF EXISTING BEAR STATUES WITH OWNER PRIOR TO DEMOLITION. 7. REMOVE EXISTING ONSITE CURB AND DISPOSE OFFSITE. 8. PROTECT EXISTING CURB TO REMAIN. 9. EXISTING CARWASH TO REMAIN AND BE PROTECTED. 10. APPROXIMATE SAWCUT LIMITS (TYPICAL). 11. CONTRACTOR TO OBTAIN PERMITS AS NECESSARY TO REMOVE EXISTING OIL/WATER SEPARATOR AND DISPOSE OFFSITE. 12. REMOVE EXISTING CATCH BASIN AND DISPOSE OFFSITE. PLUG EXISTING STORM DRAIN. EXISTING STORM DRAIN TO REMAIN AND BE PROTECTED. 13. CONFIRM EXTENTS OF EXISTING UNDERGROUND POWER REMOVAL. CONTRACTOR TO CONFIRM POWER SERVICE TO NEW LOT LIGHTS, AND AUTO SENTRY STRUCTURE PRIOR TO CONSTRUCTION. CONSULT OWNER FOR ELECTRICAL DESIGN AND CONDUIT ROUTING PRIOR TO CONSTRUCTION. 14. REMOVE EXISTING FENCE AND DISPOSE OFFSITE. 15. REMOVE EXISTING LIGHT AND DISPOSE OFF -SITE. 16. PROTECT EXISTING LIGHT TO REMAIN. 17. PROTECT EXISTING VAC STATIONS TO REMAIN. 18. REMOVE EXISTING OFF -SITE ASPHALT. CONTRACTOR TO CONFIRM SEPARATE ROW PERMIT FOR WORK OFF -SITE AS NECESSARY. 19. PROTECT EXISTING ASPHALT/CONCRETE PAVEMENT TO REMAIN. 20. PROTECT EXISTING TREE TO REMAIN. CONTRACTOR TO INSTALL PERIMETER PROTECTION AROUND EXISTING TREES FOR DURATION OF PROJECT. 21. REMOVE EXISTING SIGN AND APPURTENANCES AND DISPOSE OFF -SITE. 22. PROTECT EXISTING STORM PIPE TO REMAIN. 23. ABANDON EXISTING STORM PIPE TO EXTENTS SHOWN. SEE C4.0 FOR LOCATION OF PROPOSED STORM PIPE. 24. PROTECT EXISTING CATCH BASIN TO REMAIN. SEDIMENT CONTROL NOTE: CONTRACTOR TO SLOPE SITE AND MAINTAIN SEDIMENT CONTROL BMP'S TO ENSURE THAT THE SITE CONTAINS ALL SURFACE STORM WATER RUNOFF AND SEDIMENT. THE PROPERTY SHALL BE BOUND BY SILT FENCE AS NECESSARY. ADDITIONAL TESC CONTROL MAY BE REQUIRED. WHAT HAS BEEN DEPICTED ON THESE PLANS IS ONLY THE MINIMUM REQUIRED TO CONTAIN SILT LADEN STORM WATER. CONTRACTOR MAY BE REQUIRED TO MODIFY OR IMPLEMENT ADDITIONAL TESC CONTROLS THROUGHOUT CONSTRUCTION. 0 UTILITY CONFLICT NOTE: U THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, Q AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY _ POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE @ 811 AND o THEN POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED 7, PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, CO THE CONTRACTOR SHALL NOTIFY BARGHAUSEN CONSULTING ENGINEERS, INC. TO 3 RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. z w TESC/DEMO LEGEND: co 0 N 0, Cm CATCH BASIN PROTECTION i � PERIMETER PROTECTION CN LIMITS OF DISTURBANCE 0 0 o ---------------------- SAWCUT LINE a CONSTRUCTION FENCE TESC AND DEMOLITION PLAN FOR RENTON BROWN BEAR AUTO SENTRY ADDITION NE QUARTER OF SECTION 18, TOWNSHIP 23 NORTH, RANGE 5 EAST W.M. CITY OF RENTON, KING COUNTY, WASHINGTON 3 1p 20 1 6 \\ �� 3 20 20 73. 3 ."a 4 • ,� , 1 7 Ci 7 I «•• o r= I \ 15 1 o O ,1010 \ 14 / � 5 \ I �O ++� 1' c \\ \ \\ \ J' 4 12 1 \ .' C \\ \ \\ 1 r \\ \\ \ 10 i 1 0 t MR s \00, 24 4 ` \ \ \ r / \ « w * 22 5 13 s « 000 I \ w '00 \\\ ss \ \ \ �� % \\\ \ \ 19 18 \ J / \\\ \ss \ � l,s� \ 'o \ •i I \\ \s \� \ \ .� ; : \ 6 \\\\\\s \\\ \ 16 / d e . 17 0 \\ \ss \ � \ � °• A ° � A \ PIUGI 'C °•° 17 o \\\o rs \\ \\ \I SDSD N I j � 1 I , 0 � I 1 N I 0 o 11 N o I It, P(`'jG) ---� P(UG) V '� rn 0 VI N D I I ' I � N N 0 EP.I SS SS 0 1 ' c . 15y o � I 4 /1 N � / N I � I 1 I 0 / I � I O �= I /o 11 0 � I 1 I I I I I 24 ° O 17 1 I o• I I I \I\ \ o s \ \ \ I I I > O TESC CALLOUTS' ° \ \ \ I �'` �' a C I ' 1. TEMPORARY CONSTRUCTION FENCE 6' HIGH CHAIN LINK OR °:..I SIMILAR). FIELD VERIFY AND CONFIRM EXACT LOCATION WITH °' ° L 0 \ ° °• OWNER. SEE DETAIL 3/C3.1. \ \\\ \ ° -i 2. TEMPORARY SITE ACCESS GATE (6' HIGH CHAIN LINK WITH LOCKING DEVICE). FIELD VERIFY AND CONFIRM EXACT LOCATION \ \ O WITH OWNER. 3. CONTRACTOR TO INSTALL PERIMETER PROTECTION (TEMPORARY \ 1 \ ss\ss \\ \\ SILT FENCE - MIRAFI 10OX, OR EQUIVALENT) AROUND \ \ \ \Ln PERIMETER OF SITE AS REQUIRED PER COR STANDARD PLAN \1 GJ 216.30 TO PREVENT SILT -LADEN RUNOFF FROM LEAVING SITE, \ ° AND AS DIRECTED BY CITY INSPECTOR. SEE DETAIL 1 /C3.1. N \ ss \ \ \ \ \ \ ArGCJ \ 1 4. CONTRACTOR TO INSTALL M D STORRAIN INLET PROTECTION AT C ss \ \\ ALL CATCH BASIN INLET LOCATIONS AS REQUIRED PER COR \ GCJ \ STANDARD PLAN 214.00 TO PREVENT TO PREVENT SILT -LADEN \ss WATER FROM ENTERING STORM DRAINAGE SYSTEM, AND AS DIRECTED BY CITY INSPECTOR. SEE DETAIL 2/C3.1. \ ss h 5. CONSTRUCTION STAGING AREA. CONTRACTOR TO USE THIS AREA s FOR TEMPORARY STOCKPILE STORAGE AND CONCRETE WASHOUT. \ \ \Ss AREA SHALL BE USED TO FUEL EQUIPMENT AND TEMPORARY \ �� STORAGE OF FUEL. CONTRACTOR SHALL KEEP SPILL KITS ON -HAND IN CASE OF EMERGENCY. ADJUST SIZE AND LOCATION \ ss OF AREA AS NEEDED DURING CONSTRUCTION. \ \Ss 6. APPROXIMATE LIMITS OF DISTURBANCE. CONCRETE TO BE REMOVED ASPHALT TO BE REMOVED CURB TO BE REMOVED UTILITY NOTE: ALL UNDERGROUND UTILITIES AND SERVICES TO REMAIN UNDISTURBED UNLESS OTHERWISE SHOWN. ALL CLEANOUTS AND OTHER UTILITIES WITHIN REPLACED ASPHALT OR CONCRETE TO BE RAISED TO FINISHED GRADE. 2 REVISI❑NS PER CITY COMMENTS DATED 05/21/20 1 REVISIONS PER CITY COMMENTS NO. REVISION LRH pow CMS 6/18/20 CRJ LRH LRH 3/19/20 CRJ * ook AEM BY DATE APPR CRJ :: l 2 d= � R=56 . L=2 .01' 4 1 I 0 a \ ✓ i 42 e J O w4- I Know what's below. Call before you dig. Dial 811 1"=20' *a dem Y UNU I= ifW*Ado• am Ilpgl�grQ�r 1 I 1 1 DEMOLITION PERMIT: A DEMOLITION PERMIT FROM THE DEPARTMENT OF ECOLOGY SHALL BE REQUIRED FOR THIS PROJECT. EROSION CONTROL NOTES: 1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS IMMINENT. 2. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE AUTHORITY HAVING JURISDICTION AFTER EACH RUN-OFF PRODUCING RAINFALL. 3. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE AUTHORITY HAVING JURISDICTION DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 4. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. 5. CONTRACTOR TO IMPLEMENT SLOPE STABILIZATION MEASURES AS NECESSARY FOR EXPOSED SLOPES DURING CONSTRUCTION. DEMOLITION NOTES: 1. ALL PAVEMENTS, SLABS, GROUND COVER, UTILITIES, ETC., INSIDE LIMITS OF DISTURBANCE SHALL BE REMOVED UNLESS OTHERWISE SHOWN ON THE PLANS. 2. CONTRACTOR SHALL CONTACT AND COORDINATE WITH THE VARIOUS UTILITY COMPANIES ON REQUESTING DISCONNECTIONS, REMOVALS AND/OR RELOCATION OF EXISTING SERVICE AS NECESSARY. 3. CONTRACTOR SHALL ASSURE THAT ALL NECESSARY PERMITS AND CONSTRUCTION APPROVALS HAVE BEEN OBTAINED PRIOR TO COMMENCING WORK. 4. CONTRACTOR SHALL REPLACE ALL EXISTING CURB, PAVEMENT AND/OR LANDSCAPING DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY. 5. CONTRACTOR SHALL, PRIOR TO CONSTRUCTION OR REMOVAL OF IMPROVEMENTS, FIELD VERIFY AND CONFIRM LIMITS OF DEMOLITION AS WELL AS EXISTING UTILITIES AND IMPROVEMENTS TO REMAIN. CONSTRUCTION SEQUENCE: 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, A PRECONSTRUCTION MEETING MUST BE HELD BETWEEN THE APPLICANT, APPLICANT'S CONSTRUCTION REPRESENTATIVE, AND THE CITY OF RENTON. 2. POTHOLE / UTILITY LOCATES. 3. FLAG CLEARING LIMITS. 4. INSTALL DESIGNATED CONSTRUCTION ENTRANCE AS NEEDED. 5. INSTALL FILTER FABRIC FENCE AS INDICATED ON PLAN. 6. INSTALL ONSITE/OFFSITE CATCH BASIN PROTECTION. ' 7. POTHOLE EX. UTILITIES FOR VERTICAL AND HORIZONTAL LOCATIONS ' 8. CLEAR AND GRUB AREAS OF THE SITE TO BE ROUGH GRADED OR FILLED. 9. CLEAN STORM DRAINAGE SYSTEM, ON AND OFF -SITE, OF ALL SEDIMENT AND DEBRIS AFTER CONSTRUCTION. 10. REMOVE TEMPORARY EROSION CONTROL MEASURES WHEN SITE IS COMPLETELY STABILIZED. DEEP EXCAVATION NOTE: TANK EXCAVATIONS SHALL BE PER OSHA REQUIREMENTS. TANK EXCAVATIONS THAT REQUIRE SHORING SHALL BE ENGINEERED AND PERMITTED SEPARATELY AND SHALL BE THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR. Barghausen Consulting Engineers, Inc. 18215 72nd Avenue South Kent, WA 98032 425.251.6222 barghausen.com CITY OF RENTON Planning/Building/Public Works Dept. G ��SW�EN p 47671 �`FS FC I S i ro II`L R-411401. IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING ` •• -r Scott Warlick 7/15/2020 CURRENT PLANNING Angelea Weihs 07/23/2019 1 /10/2020 FOR mm BROWN BEAR CARWASH 77 RAINIER AVE S RENTON, WA 98057 I`t C3.d' 7