T - DEMOLITION CALLOUTS:
1 1. DEMOLISH EXISTING ON -SITE CONCRETE AND/OR ASPHALT AND DISPOSE OF
O OFFSITE.
qt 2. DEMOLISH EXISTING FUEL CANOPY, FUEL DISPENSERS, FUEL ISLANDS, AND
Q 1 APPURTENANCES AND DISPOSE OF OFFSITE (TYPICAL).
W 3. DEMOLISH EXISTING UNDERGROUND STORAGE TANK (UST) AND FUEL DISPENSER
H CONCRETE SLAB AND DISPOSE OFFSITE.TANKS SHOULD BE DECOMMISSIONED,
REMOVED AND DISPOSED OF PER APPLICABLE DEPARTMENT OF ECOLOGY AND
CITY OF RENTON/KING COUNTY REQUIREMENTS. SEE DEEP EXCAVATION NOTE
THIS SHEET.
4. CONTRACTOR TO PROVIDE SEPARATE SHORING PERMIT AND DESIGN AS
NECESSARY TO REMOVE EXISTING UST SYSTEM. PER GEOTECH REPORT, VISUAL
MONITORING OF TANK EXCAVATION IS RECOMMENDED AND TEMPORARY SHORING
IS IMPLEMENTED UPON OBSERVATION OF UNSTABLE SLOPES.
5. REMOVE EXISTING CHANNELIZATION MARKERS (TYPICAL) AND DISPOSE OFFSITE.
6. CONTRACTOR TO COORDINATE RELOCATION AND PROTECTION OF EXISTING BEAR
STATUES WITH OWNER PRIOR TO DEMOLITION.
7. REMOVE EXISTING ONSITE CURB AND DISPOSE OFFSITE.
8. PROTECT EXISTING CURB TO REMAIN.
9. EXISTING CARWASH TO REMAIN AND BE PROTECTED.
10. APPROXIMATE SAWCUT LIMITS (TYPICAL).
11. CONTRACTOR TO OBTAIN PERMITS AS NECESSARY TO REMOVE EXISTING
OIL/WATER SEPARATOR AND DISPOSE OFFSITE.
12. REMOVE EXISTING CATCH BASIN AND DISPOSE OFFSITE. PLUG EXISTING STORM
DRAIN. EXISTING STORM DRAIN TO REMAIN AND BE PROTECTED.
13. CONFIRM EXTENTS OF EXISTING UNDERGROUND POWER REMOVAL. CONTRACTOR
TO CONFIRM POWER SERVICE TO NEW LOT LIGHTS, AND AUTO SENTRY
STRUCTURE PRIOR TO CONSTRUCTION. CONSULT OWNER FOR ELECTRICAL
DESIGN AND CONDUIT ROUTING PRIOR TO CONSTRUCTION.
14. REMOVE EXISTING FENCE AND DISPOSE OFFSITE.
15. REMOVE EXISTING LIGHT AND DISPOSE OFF -SITE.
16. PROTECT EXISTING LIGHT TO REMAIN.
17. PROTECT EXISTING VAC STATIONS TO REMAIN.
18. REMOVE EXISTING OFF -SITE ASPHALT. CONTRACTOR TO CONFIRM SEPARATE
ROW PERMIT FOR WORK OFF -SITE AS NECESSARY.
19. PROTECT EXISTING ASPHALT/CONCRETE PAVEMENT TO REMAIN.
20. PROTECT EXISTING TREE TO REMAIN. CONTRACTOR TO INSTALL PERIMETER
PROTECTION AROUND EXISTING TREES FOR DURATION OF PROJECT.
21. REMOVE EXISTING SIGN AND APPURTENANCES AND DISPOSE OFF -SITE.
22. PROTECT EXISTING STORM PIPE TO REMAIN.
23. ABANDON EXISTING STORM PIPE TO EXTENTS SHOWN. SEE C4.0 FOR LOCATION
OF PROPOSED STORM PIPE.
24. PROTECT EXISTING CATCH BASIN TO REMAIN.
SEDIMENT CONTROL NOTE:
CONTRACTOR TO SLOPE SITE AND MAINTAIN SEDIMENT CONTROL BMP'S TO ENSURE
THAT THE SITE CONTAINS ALL SURFACE STORM WATER RUNOFF AND SEDIMENT. THE
PROPERTY SHALL BE BOUND BY SILT FENCE AS NECESSARY. ADDITIONAL TESC
CONTROL MAY BE REQUIRED. WHAT HAS BEEN DEPICTED ON THESE PLANS IS ONLY
THE MINIMUM REQUIRED TO CONTAIN SILT LADEN STORM WATER. CONTRACTOR MAY BE
REQUIRED TO MODIFY OR IMPLEMENT ADDITIONAL TESC CONTROLS THROUGHOUT
CONSTRUCTION.
0
UTILITY CONFLICT NOTE:
U
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION,
Q AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY
_ POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION
PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE @ 811 AND
o THEN POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY
CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS
OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED
7, PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR,
CO THE CONTRACTOR SHALL NOTIFY BARGHAUSEN CONSULTING ENGINEERS, INC. TO
3 RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION.
z
w TESC/DEMO LEGEND:
co
0
N
0,
Cm
CATCH BASIN PROTECTION
i
�
PERIMETER PROTECTION
CN
LIMITS OF DISTURBANCE
0
0
o
---------------------- SAWCUT LINE
a
CONSTRUCTION FENCE
TESC AND DEMOLITION PLAN
FOR
RENTON BROWN BEAR AUTO SENTRY ADDITION
NE QUARTER OF SECTION 18, TOWNSHIP 23 NORTH, RANGE 5 EAST W.M.
CITY OF RENTON, KING COUNTY, WASHINGTON
3 1p
20 1
6
\\ �� 3 20 20 73.
3 ."a 4 • ,� , 1 7
Ci 7 I «•• o r= I \ 15 1 o O ,1010
\ 14 / � 5 \ I �O
++� 1'
c \\ \ \\ \ J' 4 12 1
\ .'
C \\ \ \\ 1 r
\\ \\ \ 10 i 1 0 t MR
s \00,
24 4 `
\ \ \ r
/ \ « w *
22
5 13 s « 000 I
\ w '00
\\\ ss \ \ \ �� %
\\\ \ \ 19 18
\ J /
\\\ \ss \ � l,s� \ 'o \ •i I
\\ \s \� \ \ .� ; : \ 6
\\\\\\s \\\ \ 16 / d e . 17 0
\\ \ss \ � \ � °• A ° � A \ PIUGI 'C
°•°
17
o
\\\o rs \\ \\ \I SDSD
N I
j � 1
I ,
0 �
I 1
N I
0
o
11
N
o I
It, P(`'jG) ---� P(UG)
V
'� rn
0
VI
N D
I
I '
I
� N
N
0
EP.I SS SS
0
1 '
c . 15y
o �
I 4 /1
N � /
N I
� I 1
I
0 /
I � I
O �= I
/o
11
0
� I 1
I
I I
I I
24 °
O 17 1 I
o•
I I I
\I\
\ o s \ \ \ I I I
>
O TESC CALLOUTS' ° \ \ \ I �'` �' a C I '
1. TEMPORARY CONSTRUCTION FENCE 6' HIGH CHAIN LINK OR °:..I
SIMILAR). FIELD VERIFY AND CONFIRM EXACT LOCATION WITH °' ° L 0 \ ° °•
OWNER. SEE DETAIL 3/C3.1. \ \\\ \ °
-i
2. TEMPORARY SITE ACCESS GATE (6' HIGH CHAIN LINK WITH
LOCKING DEVICE). FIELD VERIFY AND CONFIRM EXACT LOCATION \ \
O
WITH OWNER.
3. CONTRACTOR TO INSTALL PERIMETER PROTECTION (TEMPORARY \ 1 \ ss\ss \\ \\
SILT FENCE - MIRAFI 10OX, OR EQUIVALENT) AROUND \ \ \ \Ln
PERIMETER OF SITE AS REQUIRED PER COR STANDARD PLAN \1 GJ
216.30 TO PREVENT SILT -LADEN RUNOFF FROM LEAVING SITE, \ °
AND AS DIRECTED BY CITY INSPECTOR. SEE DETAIL 1 /C3.1.
N
\ ss \ \ \ \ \ \ ArGCJ \ 1
4. CONTRACTOR TO INSTALL M D STORRAIN INLET PROTECTION AT C
ss \ \\
ALL CATCH BASIN INLET LOCATIONS AS REQUIRED PER COR \ GCJ \
STANDARD PLAN 214.00 TO PREVENT TO PREVENT SILT -LADEN \ss
WATER FROM ENTERING STORM DRAINAGE SYSTEM, AND AS
DIRECTED BY CITY INSPECTOR. SEE DETAIL 2/C3.1. \ ss h
5. CONSTRUCTION STAGING AREA. CONTRACTOR TO USE THIS AREA s
FOR TEMPORARY STOCKPILE STORAGE AND CONCRETE WASHOUT. \ \ \Ss
AREA SHALL BE USED TO FUEL EQUIPMENT AND TEMPORARY \ ��
STORAGE OF FUEL. CONTRACTOR SHALL KEEP SPILL KITS
ON -HAND IN CASE OF EMERGENCY. ADJUST SIZE AND LOCATION \ ss
OF AREA AS NEEDED DURING CONSTRUCTION. \ \Ss
6. APPROXIMATE LIMITS OF DISTURBANCE.
CONCRETE TO BE REMOVED
ASPHALT TO BE REMOVED
CURB TO BE REMOVED
UTILITY NOTE:
ALL UNDERGROUND UTILITIES AND SERVICES TO REMAIN UNDISTURBED UNLESS
OTHERWISE SHOWN. ALL CLEANOUTS AND OTHER UTILITIES WITHIN REPLACED ASPHALT
OR CONCRETE TO BE RAISED TO FINISHED GRADE.
2 REVISI❑NS PER CITY COMMENTS DATED 05/21/20
1 REVISIONS PER CITY COMMENTS
NO. REVISION
LRH
pow
CMS 6/18/20 CRJ LRH
LRH 3/19/20 CRJ * ook AEM
BY DATE APPR CRJ
:: l
2
d= �
R=56 .
L=2 .01'
4
1 I 0
a
\ ✓ i 42
e J O
w4- I
Know what's below.
Call before you dig.
Dial 811
1"=20'
*a dem
Y UNU I=
ifW*Ado•
am Ilpgl�grQ�r
1
I
1
1
DEMOLITION PERMIT:
A DEMOLITION PERMIT FROM THE DEPARTMENT OF
ECOLOGY SHALL BE REQUIRED FOR THIS PROJECT.
EROSION CONTROL NOTES:
1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO
FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS
WHEN RAIN IS IMMINENT.
2. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO
WORKING ORDER TO THE SATISFACTION OF THE AUTHORITY HAVING
JURISDICTION AFTER EACH RUN-OFF PRODUCING RAINFALL.
3. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES
AS MAY BE REQUIRED BY THE AUTHORITY HAVING JURISDICTION DUE TO
UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH
MAY ARISE.
4. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION
BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND
MAINTAINED.
5. CONTRACTOR TO IMPLEMENT SLOPE STABILIZATION MEASURES AS NECESSARY
FOR EXPOSED SLOPES DURING CONSTRUCTION.
DEMOLITION NOTES:
1. ALL PAVEMENTS, SLABS, GROUND COVER, UTILITIES, ETC., INSIDE LIMITS OF
DISTURBANCE SHALL BE REMOVED UNLESS OTHERWISE SHOWN ON THE
PLANS.
2. CONTRACTOR SHALL CONTACT AND COORDINATE WITH THE VARIOUS UTILITY
COMPANIES ON REQUESTING DISCONNECTIONS, REMOVALS AND/OR
RELOCATION OF EXISTING SERVICE AS NECESSARY.
3. CONTRACTOR SHALL ASSURE THAT ALL NECESSARY PERMITS AND
CONSTRUCTION APPROVALS HAVE BEEN OBTAINED PRIOR TO COMMENCING
WORK.
4. CONTRACTOR SHALL REPLACE ALL EXISTING CURB, PAVEMENT AND/OR
LANDSCAPING DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY.
5. CONTRACTOR SHALL, PRIOR TO CONSTRUCTION OR REMOVAL OF
IMPROVEMENTS, FIELD VERIFY AND CONFIRM LIMITS OF DEMOLITION AS WELL
AS EXISTING UTILITIES AND IMPROVEMENTS TO REMAIN.
CONSTRUCTION SEQUENCE:
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, A
PRECONSTRUCTION MEETING MUST BE HELD BETWEEN THE APPLICANT,
APPLICANT'S CONSTRUCTION REPRESENTATIVE, AND THE CITY OF RENTON.
2. POTHOLE / UTILITY LOCATES.
3. FLAG CLEARING LIMITS.
4. INSTALL DESIGNATED CONSTRUCTION ENTRANCE AS NEEDED.
5. INSTALL FILTER FABRIC FENCE AS INDICATED ON PLAN.
6. INSTALL ONSITE/OFFSITE CATCH BASIN PROTECTION.
' 7. POTHOLE EX. UTILITIES FOR VERTICAL AND HORIZONTAL LOCATIONS
' 8. CLEAR AND GRUB AREAS OF THE SITE TO BE ROUGH GRADED OR FILLED.
9. CLEAN STORM DRAINAGE SYSTEM, ON AND OFF -SITE, OF ALL SEDIMENT AND
DEBRIS AFTER CONSTRUCTION.
10. REMOVE TEMPORARY EROSION CONTROL MEASURES WHEN SITE IS
COMPLETELY STABILIZED.
DEEP EXCAVATION NOTE:
TANK EXCAVATIONS SHALL BE PER OSHA REQUIREMENTS. TANK EXCAVATIONS
THAT REQUIRE SHORING SHALL BE ENGINEERED AND PERMITTED SEPARATELY
AND SHALL BE THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR.
Barghausen
Consulting Engineers, Inc.
18215 72nd Avenue South
Kent, WA 98032
425.251.6222 barghausen.com
CITY OF
RENTON
Planning/Building/Public Works Dept.
G ��SW�EN
p 47671
�`FS FC I S i
ro II`L
R-411401.
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING ` ••
-r
Scott Warlick 7/15/2020
CURRENT PLANNING
Angelea Weihs 07/23/2019
1 /10/2020
FOR mm
BROWN BEAR CARWASH
77 RAINIER AVE S
RENTON, WA 98057 I`t C3.d' 7