ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC Meeting Date: August 31, 2020
Project File Number: PR20-000220
Project Name: First Metals, Inc. Change of Use
Land Use File Number: LUA20-000174, ECF
Project Manager: Angelea Weihs, Associate Planner
Owner: Pedro E. Aguilar Martinez, PO Box 1511, Bellevue, WA 98009
Applicant/Contact: Ani Babaian, First Metals, Inc., 414 Monroe Ave NE, Renton, WA 98056
Project Location: 414 Monroe Ave NE
Project Summary: The applicant is requesting Environmental (SEPA) Review for a proposed change of use
and tenant improvement from a vehicle repair shop to a “laboratory, light
manufacturing” use in the existing building located at 414 Monroe Ave NE (APN
0923059171). The property is approximately 15,625 square feet in size and is located in
the Commercial Arterial (CA) zone and Commercial Mixed Use (CMU) land use
designation. The purpose of the proposed lab is to research, investigate, and test
weather barrier systems to improve energy efficiency in existing and new structures.
No exterior development or exterior modifications are proposed for the change of use.
“Laboratories: light manufacturing” is a permitted use in the CA Zone and Commercial
Mixed Use (CMU) land use designation provided the subject property is not located
along NE Sunset Blvd, NE 4th Street, or S Puget Drive. Therefore, the proposed use is a
permitted use on the subject property. Environmental (SEPA) Review is required due to
the project being a change of use in a building larger than 4,000 square feet. Access to
the site would remain via existing curb cuts off of Monroe Ave NE. According to COR
maps, no critical areas are mapped on the project site. No trees or vegetation removal
is proposed as a part of the project. The applicant submitted an Environmental
Checklist with the project application.
Exist. Bldg. Area SF: 5,555 Proposed New Bldg. Area (footprint):
Proposed New Bldg. Area (gross):
N/A
N/A
Site Area: 15,625 SF Total Building Area GSF: 5,555
STAFF
RECOMMENDATION:
Staff Recommends that the Environmental Review Committee issue a Determination
of Non-Significance.
DocuSign Envelope ID: B29E2B1E-FDFF-4E54-B7A5-1B044F1BB4C3
City of Renton Department of Community & Economic Development
First Metals, Inc. Change of Use
Staff Report to the Environmental Review Committee
LUA20-000174, ECF
Report of August 31, 2020 Page 2 of 3
SR_First Metals, Inc. Change of Use_v2
ENVIRONMENTAL REVIEW
In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those project
impacts that are not adequately addressed under existing development standards and environmental regulations.
A. Environmental Threshold Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials:
Issue a DNS
B. Mitigation Measures
None
C. Exhibits
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: Site Plan
Exhibit 3: Project Narrative
Exhibit 4: Staff and Applicant Correspondence, Description of Business
Exhibit 5: Environmental Checklist
Exhibit 6: Advisory Notes to Applicant
D. Environmental Impacts
The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether the
applicant has adequately identified and addressed environmental impacts anticipated to occur in conjunction
with the proposed development. Staff reviewers have identified that the proposal is likely to have the following
probable impacts:
1.Earth
Impacts: The site is currently developed with an existing 5,555 square foot structure and a surface parking
lot with approximately 24 (non-striped) parking spaces. There is no existing on-site landscaping. No exterior
site improvements are proposed under the current application. As no site improvements are proposed, no
further mitigation is recommended at this time.
Mitigation Measure: None recommended.
Nexus: Not Applicable.
2.Surface Water
Impacts: The project site is currently fully developed, no new impervious surfaces are proposed under the
current development application. Therefore, no further mitigation is recommended.
Mitigation Measure: None recommended.
Nexus: Not Applicable.
3.Air
Impacts: The purpose of the proposed new lab is to research, investigate, and test weather barrier systems
to improve energy efficiency in existing and new structures. No emissions are proposed as part of the
business operations, therefore, no further mitigation is recommended.
Mitigation Measures: No further mitigation recommended.
DocuSign Envelope ID: B29E2B1E-FDFF-4E54-B7A5-1B044F1BB4C3
City of Renton Department of Community & Economic Development
First Metals, Inc. Change of Use
Staff Report to the Environmental Review Committee
LUA20-000174, ECF
Report of August 31, 2020 Page 3 of 3
SR_First Metals, Inc. Change of Use_v2
Nexus: Not applicable.
4.Transportation
Impacts: A traffic impact analysis is required when the estimated vehicular traffic generated from a
proposed development exceeds 20 vehicles per hour in either the AM (6:00 – 9:00) or PM (3:00 – 6:00) peak
periods. The average trip rate for the proposed use is less than 20 vehicles per hour, therefore, a traffic
impact analysis was not required. It is anticipated that code required impact fees would adequately mitigate
transportation impacts for the proposed new auto sentry canopy, and the total proposed stacking spaces
would provide adequate off-street parking for the proposed development; therefore, no further mitigation
is recommended.
Mitigation Measures: No further mitigation recommended.
Nexus: Not applicable.
E. Comments of Reviewing Departments
The proposal has been circulated to City Department and Division Reviewers. Where applicable, their comments
have been incorporated into the text of this report and/or “Advisory Notes to Applicant.”
Copies of all Review Comments are contained in the Official File and may be attached to this report.
DocuSign Envelope ID: B29E2B1E-FDFF-4E54-B7A5-1B044F1BB4C3
CITY OF RENTON
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE
EXHIBITS
Project Name:
First Metals, Inc. Change of Use
Land Use File Number:
LUA20-000174, ECF
Date of Meeting
August 31, 2020
Staff Contact
Angelea Weihs
Associate Planner
Project Contact/Applicant
Ani Babaian
First Metals, Inc.
414 Monroe Ave NE, Renton,
WA 98056
Project Location
414 Monroe Ave NE
The following exhibits are included with the ERC Report:
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: Site Plan
Exhibit 3: Project Narrative
Exhibit 4: Staff and Applicant Correspondence, Description of Business
Exhibit 5: Environmental Checklist
Exhibit 6: Advisory Notes to Applicant