HomeMy WebLinkAboutMFP20003814.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP20003814 IVR Number: 20003814 Permit Information Permit Name: Puget Sound Energy Gas Permits Address/Location:08/27/2020Application Date:7227801205Parcel Number: 2820 NE SUNSET BLVD Permit Type:09/09/2020Issue Date:Franchise Permit Work Class:09/09/2021Expiration Date:Major Utility Job Number: 108622739 Description: PSE gas CREW TO REMOVE 9 GAS SERVICE AT MAIN 5/8" MPE (1), 3/4" STW U (1), 1 1/8" MPE (3), 1 1/4" MPE (4), 2" MPE (6), 2" STW (2). RESTORATION PER CITY OF RENTON STANDARDS Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX INFRASOURCE SVCS B: (206) 949-5846Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 JSH PROPERTIES INC 923 POWELL AVE SW STE 101 RENTON , WA 98057 Owner Marita Bond Puget Sound Energy - Billing 6905 S 228th St Kent, WA 98032 B: (253) 395-6346Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering MFP20003814 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date 17 17 111110 10 1212121212NE SUNSET BLVD11 1 1 1 2 1 1 1 1 NE 1 0 TH S T 12 12 12 1216 16HARRINGTON PL NE2820 BUSSTOP17 17 SUNSET LN NEROADWORKAHEADW20-1SHOULDERWORKW21-5100'100'W20-1R O A D W O R K AH E A D LEFTKEEPR4-8Bm a i n t a i n 1 1 ' l a n e maintain 11' laneNE 1 0 TH S T PLACE SIGNS ALONG WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKPuget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 TEMPORARY TRAFFIC CONTROL PLAN PSE PUGET SOUND ENERGY JOB#108622739 2820 NE SUNSET BLVD, RENTON, WA 98056 07/20/20 JOHN.CROFOOT@PSE.COM 425-424-6658 SHEET 1 of 1 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 8. Work area will be along Sunset Ln NE from Harrington Pl NE to NE 10th St. N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 WORK PIT LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY MFP20003814 Est. Start Date: 2810 (2814 ?) NE SUNSET BLVD 5/8" PE (2000) 2808 NE SUNSET BLVD 3/4" STW-U (1960) 2828 SUNSET LN NE TEAPLC 1-1/4" PE (2008) 2820 NE SUNSET BLVD 1-1/8" PE (2014) 4MM -2822, 24, 30 A&B NE SUNSET BLVD 2" PE (2014) 2MM - 2832, 36 NE SUNSET BLVD 2" STW (1962) 2MM -2844, 44 NE SUNSET BLVD 1-1/8" PE (1999) 2MM -2902 NE SUNSET BLVD 2" PE (2015) 3MM 2828, 32, 34 SUNSET LN NE 1-1/4" PE SVC (2008) & & & Job #: Date:6/13/20 Address:2820 NE SUNSET BLVD Puget Sound Energy Gas Pre-Inspect Form PM / Inspector:Sara Hyacinthe (206) 637-3169 Est. Duration:1 Day (8 Hours) Jurisdiction:RENTON City / Zip:RENTON, 98056 ROW Permit:Yes Customer:DALTON ARNDT (253) 606-0715 PLAT Map:206.084 N Work Location Size of Cut Surface Type Job Description / Scope of Work C/C (RETIRE) COMM SERVICES 9X AT MAIN: 5/8" MPE (1), 3/4" STW-U (1), 1-1/8" MPE (3), 1-1/4" MPE (4), 2" MPE (6), 2" STW (2) REMOVE ALL METERS AND MANIFOLDS New Construction: No Construction Method of CL SUNSET LN NE 3X5 ASPHALT 469'North of CL NE 10TH ST (D)18'West 249'North of CL NE 10TH ST (B)18'West of CL SUNSET LN NE 3X5 ASPHALT Service Information Street Information Job Type of CL SUNSET LN NE 3X5 ASPHALT 25'East of CL HARRINGTON PLACE NE (I)18'West Cut & Cap EFV:0 Police #:TCP:Yes Diameter:0 Flaggers #:Arterial:No Trolley Lines:Mtr Hoods #: Meter:Speed Limit: Tie-In Fitting Route #'s:Bollards:2.5" #4" #ADA Ramps #: Del Press:Traffic Signal:No Bus Stop:No No Parks #: Meter Loc:0 A B C D E GI A B C D E F G H F I MFP20003814 RESTORATION PER CITY OF RENTON STANDARDS MFP20003814 MFP20003814