Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CO 3
CommunityServicesFacilitiesDivisionCONTRACTNO:ICAG-19-254IPROJECTTITLE:CedarRiverBoathouseReconfiguratioiCONTRACTCHANGESUM:CNOCHANGECINCREASEOF:CDECREASE(WASHINGTONSTATESALESTAXINCLUDED)CHANGEORDERSUMMARY1,653.0016,500.0018,153.00311,325.006.19%NOTICETOPROCEEDDATESeptember23,2019ORIGINAL/PREVIOUSCONTRACTCALENDARDAYS465PREVIOUSSUBSTANTIALCOMPLETIONDATEDecember31,2020REVISEDCONTRACTCALENDARDAYSTHISCHANGEORDER0TOTALREVISEDCONTRACTCALENDARDAYSTODATE465CURRENTSUBSTANTIALCOTDATEDecember31,20208/26/20Q)(72[7..OU)ContractorAcknIedgementDateTheCityofRentonherebyacceptstheforegoingFieldAuthorization(s)and/orChangeOrderProposal(s).ThisformalacceptanceconstitutesaChangetothecontractonlywhenauthorizingsignatureisaffixed.InvoicesincorporatingthisChangeOrderconstituteacceptancebytheContractorastotalreimbursementdueinconnectioithtChanOrder.‘1///2&AUORIZINIGNATDATECONTRACTCHANGEORDER(CO)TO:MarineFloatsIncorporatedCONO:I31DescriptionAddpolyureacoatingtodeckingThefollowingmutuallyagreedtoandOwnerapprovedChangeOrderProposal(s)and/orFieldAuthorization(s)areherebyincorporatedbyreferenceintothecontract.(CONTRACTOR)Amount$16,500.00$$$$$CONTRACTCHANGETIME:CNOCHANGE1________________CINCREASEfOF:CDECREASE]Theforegoingamountcoverseverythingrequiredinconnectionwiththechange.Allotherprovisionsofthecontractremaininfullforceandeffect.REVISEDCALENDARDAYSTHISCOI$16500.00L01ORIGINALCONTRACTSUMPREVIOUSADDITIONS/DELETIONSCHANGEAMOUNTTHISCHANGEORDERTOTALCHANGEAMOUNTTODATE$293,172.00$$$REVISEDCONTRACTTOTAL$PERCENTTOTALCHANGEFROMORIGINALArchitectAcknowledgementDate REQUESTFORINFORMAflONFORM___RFI#IDATE:6-1O2ODATENEEDEDBYTO:CityofRentonPROJECTNAMECedarRivet10545GradyWayRenton,WA98057PROJECT2820__RflDescriponAUUpolyureacoatingtoaluminumdecking.Priceincreaseof$15,000.Pleasecreateachangeordertoreflectthi5pricechange.ExcludesSalesTaxATTACHMENTS:SUBMITTEDBY:LoganBrownMarineFloatsRESPONSETORFIRESPONSEBY:DATE:ATTACHMENTS