Loading...
HomeMy WebLinkAboutPre-app Mtg Summary - 20-000205.pdf1 PRE-APPLICATION MEETING FOR Ehlert Short Plat PRE20-000205 CITY OF RENTON Department of Community & Economic Development Planning Division Septembe 24, 2020 Contact Information: Planner: Alex Morganroth, 425-430-7219, amorganroth@rentonwa.gov Public Works Plan Reviewer: Jonathan Chavez, 425-430-7288, jchavez@rentonwa.gov Fire Prevention Reviewer: Corey Thomas, 425-276-9582, cthomas@rentonrfa.org Building Official: Rob Shuey, 425-430-7235, rshuey@rentonwa.gov Please retain this packet throughout the course of your project as a reference. Consider giving copies of it to any engineers, architects, and contractors who work on the project. You will need to submit a copy of this packet when you apply for land use and/or environmental permits. Pre-screening: When you have the project application ready for submittal, call and schedule an appointment with the project manager to have it pre-screened before making all of the required copies. The pre-application meeting is informal and non-binding. The comments provided on the proposal are based on the codes and policies in effect at the time of review. The applicant is cautioned that the development regulations are regularly amended and the proposal will be formally reviewed under the regulations in effect at the time of project submittal. The information contained in this summary is subject to modification and/or concurrence by official decision-makers (e.g., Hearing Examiner, Planning Director, Development Services Director, Department of Community & Economic Development Administrator, Public Works Administrator and City Council). 2 RENTON REGIONAL FIRE AUTHORITY M E M O R A N D U M DATE: September 17, 2020 TO: Alex Morganroth, Senior Planner FROM: Corey Thomas, Lead Plans Review Inspector SUBJECT: Ehlert Short Plat 1. The fire flow requirement for a single-family home is 1,000 gpm minimum for dwellings up to 3,600 Square feet (including garage and basements). If the dwelling exceeds 3,600 square feet, a minimum of 1,500 gpm fire flow would be required. A minimum of one fire hydrant is required within 300-feet of the proposed buildings and two hydrants if the fire flow goes up to 1,500 gpm. Water is provided by King County Water District 90. A water availability certificate is required from them. 2. The fire impact fees are currently applicable at the rate of $829.77 per single family unit. This fee is paid at building permit issuance. Credit will be granted for any existing homes that are removed or retained. 3. Fire department apparatus access roadways are adequate from existing city streets. 3 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: September 22, 2020 TO: Alex Morganroth, Senior Planner FROM: Jonathan Chavez, Civil Engineer III SUBJECT: Ehlert Short Plat PRE20-000205 I have reviewed the pre-application submittal for the Eileen Short Plat at 6304 SE 2nd Place (KC Parcel ID: 1423059033). The applicant is proposing to short plat into 4 new buildable lots. WATER 1. Water service is provided by King County Water District 90. 2. Applicant shall obtain a water availability certificate from the District and provide it with the civil construction permit submittal. 3. Review of the water plans will be conducted by King County Water District 90 and the Renton Regional Fire Authority. 4. Plans approved by King County Water District 90 shall be routed to the City for final review prior to permit issuance. SEWER 1. The project is within the City of Renton’s sanitary sewer service area. 2. There is an existing 10” PVC main sewer to the south of the property, on SE 2nd Place (See Record Drawing S-314802). 3. The developer will need to show how they propose to serve the new development with sanitary sewer service to each of the units. 4. A separate side sewer will be required for the new lots. All new side sewers shall be a minimum of 6”. All side sewers shall flow by gravity to the main at a minimum slope of 2%. 5. The development is subject to a wastewater system development charge (SDC) fee. The 2020 SDC fee for sewer is based on the size and number of new domestic water services to serve the project. The current sewer fee for a 1-inch meter install is $3,400.00 per meter. a. This project will be subject to the Central Plateau Interceptor Special Assessment District fee. The fee is assessed at $538.48 per new lot. SURFACE WATER 1. A drainage report complying with the current version of the City adopted Surface Water Design Manual (SWDM) will be required. Based on the City’s flow control map, the site falls within the Flow Control Duration Standard area matching Forested Site Conditions and is within the Lower Cedar River Drainage Basin. Refer to Figure 1.1.2.A – Flow chart to determine the type of drainage review required in the RSWM. All stormwater improvements as per the drainage review along with stormwater improvements in the frontage are required to be provided by the developer. 4 2. The site topography slopes moderately from the northeast to the southwest. The site contains regulated slopes between 15% and 25% grade. There is an existing 12-inch stormwater main located along the property frontage on SE 2nd Place. Reference Record Drawing R-301705. 3. Storm drainage improvements along all public street frontages are required to conform to the City’s street and stormwater conveyance standards. Any new storm drain installed on or off-site shall be designed and sized in accordance with standards found in Chapter 4 of the 2017 RSWDM and shall account for the total upstream tributary area, assuming developed conditions for onsite tributary areas and existing conditions for any offsite tributary areas. 4. Maintenance access is required for any proposed stormwater tracts and shall be designed and installed in accordance with the City adopted SWDM. 5. If the new plus replaced pollution generating impervious surface exceeds 5,000 SF, the applicant will be required to provide basic water quality treatment. Any proposed detention and/or water quality vault shall be designed in accordance with the RSWDM that is current at the time of civil construction permit application. Separate structural plans will be required to be submitted for review and approval under a separate building permit for the detention and/or water quality vault. 6. Appropriate on-site BMPs satisfying Core Requirement #9 will be required to help mitigate the new runoff created by this development to the maximum extent feasible. On-site BMPs shall be evaluated as described in Section C.1.3 of the 2017 RSWDM. A preliminary drainage plan, including the application of on-site BMPs, shall be included with the land use application, as applicable to the project. The final drainage plan and drainage report must be submitted with the utility construction permit application. 7. A geotechnical soils report for the site is required per the 2017 Renton Surface Water Design Manual Section C.1.3. Information on the water table and soil permeability (measured infiltration rates), with recommendations of appropriate on-site BMPs per Core Requirement #9 and Appendix C shall be included in the report. The report should also include information concerning the soils, geology, drainage patterns and vegetation present shall be presented in order to evaluate the drainage, erosion control and slope stability for site development of the proposed plat. The applicant must demonstrate the development will not result in soil erosion and sedimentation, landslide, slippage, or excess surface water runoff. 8. Erosion control measures to meet the City requirements shall be provided. 9. The current City of Renton Surface Water Standard Plans that shall be used in all drainage submittals are available online at the City of Renton website. 10. The 2020 Surface water system development fee is $0.76 per square foot of new impervious surface, but no less than $1,900.00. This is payable prior to issuance of the construction permit. This fee is subject to change based on the calendar year the construction permit is issued. TRANSPORTATION 1. The proposed development fronts SE 2nd Place along the south property line(s). SE 2nd Place is classified as a residential access street. Per RMC 4-6-060, the minimum right of way width for a residential access street is 53 feet. Per City code 4-6-060, half street improvements shall include a pavement width of 26 feet (13 feet from centerline), a 0.5-foot curb, an 8-foot planting strip, an 5-foot sidewalk, street trees and storm drainage improvements. a. Refer to the following record drawings to design the frontage improvements to match existing improvements along SE 2nd Place: i. https://edocs.rentonwa.gov/Documents/DocView.aspx?id=524518& ii. https://edocs.rentonwa.gov/Documents/DocView.aspx?id=1430703& 2. Refer to City code 4-4-080 regarding driveway regulations: a. Maximum driveway slope is 15%. Driveways which exceed 8% shall provide slotted drains at the lower end with positive drainage discharge to restrict runoff from entering the garage. b. The maximum width of a single loaded garage driveway is 9-feet and the maximum width of a double loaded garage driveway is 16-feet. If a garage is not present, the maximum driveway width is 16-feet. c. Driveways shall not be closer than 5-feet to any property line. 3. Paving and trench restoration shall comply with the City’s Trench Restoration and Overlay Requirements. 5 4. The transportation impact fee is based on the type of land use. For single-family residential, the 2020 transportation impact fee is $7,820.42 per lot. Transportation impact fees are subject to change based on the year the building permit is applied for. GENERAL COMMENTS 1. All existing and proposed utility lines (i.e. electrical, phone, and cable services, etc.) along property frontage or within the site must be underground. The construction of these franchise utilities must be inspected and approved by a City of Renton inspector. 2. Adequate separation between utilities as well as other features shall be provided in accordance with code requirements: a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other utilities is required with the exception of water lines which require 10-ft horizontal and 1.5-ft vertical. b. The stormwater line should be minimum 5 feet away from any other structure or wall or building. c. Trench of any utility should not be in the zone of influence of the retaining wall or of the building. 3. All civil construction permits for utility and street improvements will require separate plan submittals. All utility plans shall confirm to the Renton Drafting Standards. A licensed Civil Engineer shall prepare the civil plans. Please visit the Development Engineering Forms page for the most up-to-date plan submittal requirements: http://rentonwa.gov/business/default.aspx?id=42473 4. A landscaping plan and tree retention shall be included with the civil plan submittal. Each plan shall be on separate sheets. 5. Additional Building Permit Applications will be required for the following: a. Any retaining walls that exceed 4 feet in height, as defined by RMC 4-4-040. b. Detention vaults for storm water flow control. c. Demo of any existing structures on the project site(s). 6. Fees quoted in this document reflect the fees applicable in the year 2020 only and will be assessed based on the fee that is current at the time of the permit application or issuance, as applicable to the permit type. Please visit www.rentonwa.gov for the current development fee schedule. 6 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: September 24, 2020 TO: Pre-Application File No. 20-000205 FROM: Alex Morganroth, Senior Planner SUBJECT: Ehlert Property Short Plat 6304 SE 2nd Pl Parcel #s 1423059033 General: We have completed a preliminary review of the pre-application for the above-referenced development proposal. The following comments on development and permitting issues are based on the pre-application submittals made to the City of Renton by the applicant and the codes in effect on the date of review. The applicant is cautioned that information contained in this summary may be subject to modification and/or concurrence by official decision-makers (e.g., Hearing Examiner, Community & Economic Development Administrator, Public Works Administrator, Planning Director, Development Services Director, and City Council). Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant. The applicant is encouraged to review all applicable sections of the Renton Municipal Code. The Development Regulations are available online at https://www.codepublishing.com/WA/Renton/. Project Proposal: The applicant is proposing to subdivide one existing parcel into four (4) lots. The subject property proposed for subdivision is located at 6304 SE 2nd Pl (APN 1423059033) near the intersection of 156th Ave SE and SE 2nd Pl. The parcel totals approximately 43,267 sq. ft. (0.99 acres) in size. An existing primary residence and an associated accessory structure are located on the parcel. The applicant is proposing to retain the residence and remove the accessory structure as part of the project. The site has a Comprehensive Plan Land Use of Designation of Residential Low Density (RLD) and a zoning designation of Residential-4 (R-4) dwelling units per net acre (du/ac). The size of the proposed lots range from 8,525 to 13,950 sq. ft. Access to the four lots is proposed via individual driveways off of SE 2nd Pl. According to COR Maps, regulated slopes are present on the project site. The applicant did not propose the removal of any trees or vegetation on the project site; however, some removal is expected based on the site layout. Current Use: The site is currently developed with a single-family home and one accessory structure. Zoning/Density Requirements: The subject property is located within the R-4 zoning classification. A maximum of 4.0 dwelling units per acre is allowed in the R-4 zone. There is no minimum density for the R-4 zone. The Residential Low Density Land Use designation is intended to provide transition to the rural area, or those appropriate for larger lot housing within the Residential Low Density (RLD) land use designation to allow for a range of lifestyles. The area of public and private streets (including driveway tracts) and critical areas (excluding buffers) would be deducted from the gross site area to determine the “net” site area prior to calculating density. In order to calculate the proposed density of the project, any area of public road, private easement, and/or critical area dedication must be known. As proposed, the four lots would yield a gross density of approximately 4.03 du/ac (4 units/0.99 ac = 4.03 du/ac). Compliance with the density standards would be required to be demonstrated at the time of formal land use application. 7 Development Standards: The project would be subject to RMC 4-2-110A, “Development Standards for Single Family Zoning Designations” effective at the time of complete application (noted as “R-4 standards” herein) Minimum Lot Size, Width and Depth – The minimum lot size permitted in the R-4 zone, is 9,000 square feet for parcels being subdivided. Minimum lot width is 70 feet for interior lots and 80 feet for corner lots; minimum lot depth is 100 feet. For short plats of parcels smaller than one acre, one parcel may be allowed to be smaller than the required minimum lot size if all other parcels meet the required minimum lot size standard of the zone. In the R-4 zone, one parcel may be allowed to have a total size of 8,000 sq. ft. Based on the size of the subject parcel (0.99 acres), the proposal appears to be eligible for this lot size exemption. In the submittal documents, the applicant indicated the intent to utilize Footnote 31 in RMC 4-2-110E to allow for proposed Lot 4 to have a reduced lot width of 55 feet. However, lot variation requirements are not applicable for the R-4 per RMC 4-2-115 and therefore Footnote 31 cannot be utilize for projects in the R-4 zone as it relates to lot width variation. Proposed Lots 2 and 4 do not appear to meet the minimum width requirements for the R-4 zone. The proposed size of Lot 4 is acceptable per the size exemption for the R -4 zone described above (one lot can sized at 8,000 sq. ft. for short plats under an acre). It is the applicant’s responsibility to demonstrate compliance with the minimum lot size, width and depth criteria of the zone at the time of formal land use application. Building Standards – The R-4 standards allow a maximum building coverage of 35% of the lot area. The maximum impervious coverage in the R-4 zone is 50%. The maximum wall plate height is restricted to 32 feet, and the buildings shall be not more than three stories. Roofs with a pitch equal to or greater than 4:12 may project an additional six (6) vertical feet from the maximum wall plate height; common rooftop features, such as chimneys, may project an additional four (4) vertical feet from the roof surface. Non-exempt vertical projections (e.g., decks, railings, etc.) shall not extend above the maximum wall plate height unless the projection is stepped back one-and-a-half (1.5) horizontal feet from each façade for each one (1) vertical foot above the maximum wall plate height. Detached accessory structures have a maximum wall height of 12 feet and maximum overall height of 18 feet. The gross floor area must be less than that of the primary structure. Accessory structures are also included in building lot coverage calculations. Compliance with the building standards for the new building would be required to be demonstrated at the time of building permit review. Setbacks – Setbacks are the minimum required distance between the building footprint and the property line. The required setbacks for the R-4 zone are: Front yard: 30 feet for the primary structure; Rear yard: 25 feet; Side yards: 20 feet combined (minimum of 7.5 feet on either side); and Secondary Front yard: 30 feet. Corner lots required to have a front yard and a secondary front yard are relieved of the requirement to have a rear yard; in place of a rear yard setback, the side yard setback of the zone shall apply. The setbacks would be measured from the new property lines after roadway dedication. In order to allow the primary residence on proposed Lot 3 to utilize a 5 foot side yard setback along the west property line, the applicant would be required to obtain a setback variance. Access/Parking: Access to the lots is proposed via individual driveways off of SE 2nd Pl. Any driveway shall be setback at least 5 feet from the side lot lines (unless utilizing a joint driveway). Each lot is required to accommodate off street parking for a minimum of two vehicles. Fences/Walls: If the applicant intends to install any fences or retaining walls as part of this project, the location must be designated on the landscape plan or grading plan. A fence and/or wall detail should also be included on the plan. A retaining wall that is 4 feet or taller, as measured by the vertical distance from the bottom of the footing to the finish grade at the top of the wall requires a building permit. A fence shall not be constructed on top of a retaining wall unless the total combined height of the retaining wall and the fence does not exceed the allowed height of a standalone fence. For more information about fences and retaining walls refer to RMC 4-4-040. Landscaping: With the exception of critical areas, all pervious area shall have landscape treatment. Landscaping may include hardscape such as decorative paving, rock outcroppings, fountains, plant containers, etc. Ten feet (10') of on-site landscaping is required along all public street frontages. Where there is insufficient right-of-way space or 8 no public frontage, street trees are required in the front yard subject to approval of the Administrator. A minimum of two (2) trees are to be located in the front yard prior to final inspection. Storm drainage facilities are required to comply with the minimum 15-foot perimeter landscaping strip on the outside of the fence unless otherwise determined through the site plan review or subdivision review process. Please refer to landscape regulations RMC 4-4-070 for further general and specific landscape requirements. A conceptual landscape plan shall be provided with the formal land use application as prepared by a registered Landscape Architect or other certified professional. Significant Tree Retention: If significant trees are proposed to be removed, a tree inventory and a tree retention plan along with a tree retention worksheet shall be provided with the formal land use application. The tree retention plan must show preservation of at least 30 percent (30%) of significant trees, and indicate how proposed building footprints would be sited to accommodate preservation of significant trees that would be retained. The Administrator may authorize the planting of replacement trees on the site if it can be demonstrated to the Administrator's satisfaction that an insufficient number of trees can be retained. In addition to retaining 30% of existing significant trees, the lot would be required to provide a minimum tree density of two (2) trees per 5,000 square feet of lot area onsite. Significant trees shall be retained in the following priority order: Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees on slopes greater than twenty percent (20%); Significant trees adjacent to critical areas and their associated buffers; and Significant trees over sixty feet (60') in height or greater than eighteen inches (18") caliper. Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; other significant native evergreen or deciduous trees; and other significant non-native trees. Priority Three: Alders and cottonwoods shall be retained when all other trees have been evaluated for retention and are not able to be retained, unless the alders and/ or cottonwoods are used as part of an approved enhancement project within a critical area or its buffer. The Administrator may require independent review of any land use application that involves tree removal and land clearing at the City's discretion. If staff determines that the trees cannot be retained, replacement trees, with at least a 2-inch caliper or an evergreen at least 6 feet tall, shall be planted at a rate of 12 caliper inches of new trees to replace each protected tree removed. A formal tree retention plan prepared by an arborist or landscape architect would be reviewed at the time of the formal land use application if any trees are proposed for removal. Critical Areas: According to COR Maps, regulated slopes are located on the project. It is the applicant’s responsibility to ascertain whether any additional critical areas are present on the site. Environmental Review: Projects consisting of nine (9) units or less and that will not impact a critical area are exempt from Environmental (SEPA) Review. Based on the proposal submitted by the applicant, the proposed project would be exempt from SEPA review. Permit Requirements: The proposal would require administrative short plat approval. The 2020 administrative short plat application fee is $5,544 ($5,280 plus a 5% Technology Surcharge Fee). The 2020 administrative variance fee is $1,365.00 ($1,300 plus a 5% Technology Surcharge Fee). All fees are subject to change. The applications would be reviewed concurrently within an estimated time frame of six to eight weeks. Detailed information regarding the land use application submittal can be found on the City’s permitting page at permitting.rentonwa.gov and clicking on “Land Use”, then “All Forms (A to Z).” The City now requires electronic plan submittal for all applications. Once Preliminary Short Plat approval is obtained, the applicant must complete the required improvements and dedications, as well as satisfy any conditions of the preliminary approval before submitting for Final Short Plat review. Once final approval is received, the plat may be recorded. The newly created lots may only be sold after the 9 plat has been recorded. In addition to the required land use permits, separate construction and building permits would be required. Public Notice: A minimum of one Public Information Sign is required for a Short Plat application. The applicant is responsible for the procurement, installation and maintenance of the sign. Detailed information regarding the land use application submittal requirements is provided on the City of Renton website (www.rentonwa.gov). Fees: In addition to the applicable building and construction fees, impact fees would be required. Such fees would apply to all projects and would be calculated at the time of building permit application and payable prior to building permit issuance. The 2020 impact fees are as follows:  A Transportation Impact Fee based on $7,820.42 per each new detached dwelling unit.  A Parks Impact Fee based on $3,945.07 per each new detached dwelling unit.  A Fire Impact fee of $829.77 per each new detached dwelling unit.  A Renton School District Impact Fee of $6,877.00 (+5% administrative fee) per each new detached dwelling unit. A handout listing Renton’s development-related fees is available on the City of Renton website for your review. Note: When the formal application materials are complete, the applicant is strong ly encouraged to send a copy of the application materials via email prior to submitting the complete application package. Please contact Alex Morganroth, Senior Planner at amorganroth@rentonwa.gov or 425-430-7219 before sending any documents associated with the project. Expiration: Upon approval, the Short Plat is valid for five years with a possible one year extension (RMC 4-7-070M). It is the responsibility of the owner to monitor the expiration date.