HomeMy WebLinkAbout0895.06 DFR 224-226.pdfEarth Solutions NW, LLC
LETTER OF TRANSMITTAL
15365 NE 90th Street, Suite 100 Redmond, WA 98052
(425) 449-4704 FAX (425) 449-4711
To: RJ Development
401 Central Street SE
Olympia, WA 98501
Date: September 30, 2020
ESNW No.: ES- 895.06
Project: Weatherly Inn
Attn: Mr. Duane Meyer
Email: duane@accrete.build
No. of
Copies Date Description
1 9/1-9/8/20 Daily Field Report(s) # 224-226
Comments:
CC:
1: John Wilson ATTN: johnw@rinocon.com
2: Mark Richardson ATTN: mark@accrete.build
3: Jeff Bennett ATTN: jeffb@accrete.build
4: Jennifer Vogele ATTN: jennifer@accrete.build
5: Jonathan Chavez ATTN: jchavez@rentonwa.gov
6: Joe W ATTN: joew@accrete.build
7: Roxanne Caballero ATTN: roxanne@accrete.build
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 224
Time On Site Time Off Site Date Day of Week
11:30 AM 1:00 PM
9/1/20
Tuesday
Travel Time Weather
1.00Hr. RT 70s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site? Project No. Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe and test water main junction backfill and slope stability.
Water Main Junction Backfill
ESNW Rep observed contractor backfill around a water main junction vault. Rep observed contractor backfill with
native brown silty sand with gravel material. While onsite, rep used a ½” steel t-probe and observed the subgrade
to be very dense, firm, unyielding, and suitable for support of the wall. Rep observed contractor place 18’’ of pea
gravel and then 1’ lifts of native material compacted with a jumping jack to grade. ESNW rep observed that the
contractor had achieved minimum compaction standards of 95% or greater in areas tested.
Cut Slopes
While onsite, rep observed slopes of the cut slopes to be near vertical. Rep observed that the north slopes of the
excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes are stable in current configuration
and stable to work within. The contractor is responsible for providing all safety measures in accordance with state
and federal regulation
ESNW rep will return to observe earthwork activities when requested by client
Fig 1. Water main junction backfill
Jackson Lundgren Field Technician 206-468-0991
1/2
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 224
Time On Site Time Off Site Date Day of Week
11:30 AM 1:00 PM
9/1/20
Tuesday
Travel Time Weather
1.00Hr. RT 70s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site? Project No. Permit No.
Test Number Test Location
(WM Vault
Backfill) Elevation Reference
Compaction
Curve
Maximum Dry
Density (pcf) Fill Moisture
(%) Test
Dry Density
(pcf)
% of Maximum
Dry Density
244 See map -4’ SG 6 133.0 126.7 6.33 95
245 See map -4’ SG 6 133.0 128.2 5.78 96
246 See map -3’ SG 6 133.0 1259 6.21 95
247 See map -3’ SG 6 133.0 126.2 6.68 95
Fig. 1 Approximate location of compaction tests 242-243 on water main backfill
244-247
2/2
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 225
Time On Site Time Off Site Date Day of Week
11:30 AM 1:00 PM 9/2/20 Wednesday
Travel Time Weather
1.00Hr. RT 70s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site?Project No.Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe roof drain subgrade, water main junction backfill, slope
stability.
Roof Drain Trench
ESNW rep observed contractor using a medium sized excavator to grade along the northern margin of the main
building in preparation for excavation of a 2’ deep 100’ long trench for a roof drain and a 3’ deep trench for an 8’’
sewer. Rep used a ½” steel t-probe and observed the subgrade to be very dense, firm, unyielding, and suitable
for support of the proposed roof drains and sewer.
Water Main Junction
While onsite, ESNW rep observed contractor placing form boards for concrete thrust blocks supporting a 6’’ ductile
iron water main. Contractor relayed that thrust blocks would be poured Thursday and water main junction vault
would be backfilled to grade with native material and compacted with a hoe pack and jumping jack.
Cut Slopes
While onsite, rep observed slopes of the cut slopes to be near vertical. Rep observed that the north slopes of the
excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes are stable in current configuration
and stable to work within. The contractor is responsible for providing all safety measures in accordance with state
and federal regulation
ESNW rep will return to observe earthwork activities when requested by client
Fig 1. Thrust block form boards for support of 6’’ ductile iron water main.
Jackson Lundgren Field Technician 206-468-0991
1/1
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 226
Time On Site Time Off Site Date Day of Week
11:00 AM 12:30 PM 9/8/20 Tuesday
Travel Time Weather
1.00Hr. RT 70s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site?Project No.Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe wall backfill and slope stability.
Wall Backfill
ESNW Rep observed contractor backfill around cast in place wall North of main building. Rep observed contractor
backfill with native brown silty sand with gravel material. While onsite, rep used a ½” steel t-probe and observed
the subgrade to be very dense, firm, unyielding, and suitable for support of the wall. Rep observed 1’ lift of native
material compacted with a jumping jack to grade.
Water Main Connection
ESNW Rep observed contractor working on the 12’’ ductile iron water main connection to site in Talbot Road S.
Contractor relayed backfill would not take place until after pressure testing was completed.
Cut Slopes
While onsite, rep observed slopes of the cut slopes to be near vertical. Rep observed that the north slopes of the
excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes are stable in current configuration
and stable to work within. The contractor is responsible for providing all safety measures in accordance with state
and federal regulation
ESNW rep will return to observe earthwork activities when requested by client
Jackson Lundgren Field Technician 206-468-0991
1/1