Loading...
HomeMy WebLinkAboutPN_Boeing_ project narrative_ Apron R_ Tree revsion_200908_v3. PDF.pdfProject narrative BOEING COMMERCIAL AIRPLANE GROUP RENTON WASHINGTON Apron R Tree revision 737 Logan avenue north Renton WA 98055 Adjacent to the shoreline of the Lake Washington Adjacent to Boeing Renton Apron A and Renton municipal Airport Master use permit, Environmental Checklist, Substantial Shoreline development permit is the land use permits for the proposed projects. Zoning designation is Urban Center north 2 Department of Natural Resources- Natural area The Cedar River & Lake Washington are the special site features Sandy silt loam is the soil type. The work is within 200 ft. of the ordinary high water mark of the Lake Washington The DNR area is adjacent to Lake Washington and has a variety of fish and wildlife . Cost of the task is approx. $8,000 Revision to existing Apron R Tree plan A) Remove 1 each 40ft high Black cottonwood tree An existing 40 ft. high Black cottonwood tree roots would be affected when the contractor removes the Boeing utilities off the DNR property. The Cottonwood tree is adjacent to the property and could likely fall on the Apron itself, becoming a dangerous tree. B) Add 3 each Sitka spruces To compensate for the tree removal and to give the grove of trees more diversity, we are adding three more conifer trees to the DNR property. C) Delete existing 6ft high maple tree off removal list Existing Maple that was to be originally removed on the extreme west of the DNR property is in a state of decline and would eventually fall on its own near the shoreline, this would improve the habitat naturally after the normal tree and limbs fall.