Loading...
HomeMy WebLinkAboutBoeing_Renton_ApronR_Tree Removal_Revised 200908_REV_opt_ v3.pdfCr] r w i a N N Q a m O C] m OJ C o.. m a� J P1 PZ P1 PROPOSED TREE RE -PLANTING WITHIN DNR PRGPERTY. TGTAL GF �8} TREES, SEE PLANT LIST FQR SPECIES. TREES SHALL NGT BE LOCATED WITHIN THE WINGTIP CLEARANCE AREAS. ACTUAL LGCATIGNS SHALL BE FIEL❑ DETERMINED BY THE PRGJECT ENGINEER. P2 PROPOSED TREE RE-PLANTRING WITHIN DNR PRGPERTY. TGTAL GF �3} TREES, SEE PLANT LIST FGR SPECIES. TREES SHALL NGT BE LOCATED WITHIN THE WINGTIP CLEARANCE AREAS. ACTUAL LGCATIGNS SHALL BE FIEL❑ DETERMINED BY THE PRGJECT ENGINEER. PRaPDSE❑TREE REPLACEMENT DNR SITE C�MM�N NAME SCIENTIFIC NAME SIZE SPACING HEIGHT* QEJANTITY COMMENTS SITKA SPRUCE Picea Sitchensis S Gallon FIELD F[T BDft $ 51TICA WILLGW Salix 5itchensis 2 Gallon FIELD FIT 20ft 3 �Appraximate height at maturity. SYM I REVI5ION — I APRON R INFRASTRI.IOTl.1RE - IFC - I REVISION -EDITS TO TREE REMOVAL BY APPROVED DATE 5YM WOOD JC 07�05�19 WOOD JC 08�17�2D REVI514N BY I APPROVED I DATE �BOE/NCm CATIONS PRGPGSED TREE REMGVAL FGR EXISTING UTILITY REMGVAL VIIGRK: 1. CASCARA BUCKTHORN, �" DBH, 1 � FDDT HEIGHT 2. MAPLE, VINE, � 8" DBH �1 D+ MULTI -STEM}, 8 FDDT HEIGHT 3. CGTTGNVIJGGD, BLACK, � �" DBH, 4D FDDT HEIGHT 4. WILLOW, SCGULER'S, 4" DBH, 3� FDDT HEIGHT 5. CGTTGNVIJGGD, BLACK, � D" DBH, 4D FDDT HEIGHT TREES IDENTIFIED FOR PRUNING: 3. TREES FOR CROWN RAISE PRUNING. (24) ASPEN, QUAKING AND �� 3} PORT CRFGRD CEDAR ABOVE INFORMATION PRDVIL7ED TD BERGER ABAM BY DAVY RESOURCES GROUP DN AUGUST 2D2D DBH =DIAMETER AT BREAST HEIGHT REVISED 8/19/20 ACCEPTABILITY Sp W" U81L17_2a SUBTITLE PROPOSED TREE REMOVAL FDR THIS DE51GN AND�aR JCECKED �_�7_2a EXISTING UTILITY REMOVAL `IIIGRK SPECIFICATION 15 APPROVED ENGINEER TITLE APRON R INFRASTRUCTURE APPROVE❑ BY DEPT. DATE CIVIL MASTER RENTDN SITE SITE R-4� 13 � 42 I IN COMPLIANCE WITH CITY OF RENTDN STANDARDS ❑ATE a7�a���� L7 W47�C331 COMP N0. 6WC N0. RENTON, WA LY1 fi 1 CC44�_1 CC_ABAM_Revised 2C2C CURRENT REVISION 5YM80L W47CC331 SHEET L�� AI�1=�i[�a