Loading...
HomeMy WebLinkAboutMFP20004521.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP20004521 IVR Number: 20004521 Permit Information Permit Name: Puget Sound Energy Gas Permits Address/Location:10/05/2020Application Date:3276900260Parcel Number: 17800 113TH PL SE Permit Type:10/07/2020Issue Date:Franchise Permit Work Class:10/07/2021Expiration Date:Major Utility Job Number: 109132227Franchise Type:Natural Gas Description: PSE gas RUSH REQUEST CREW TO REPLACE EXISTING 2" STW IP MAIN IN 113TH PL SE WITH 2" PE IP MAIN. BEGINNING AT APPROX 72' SCL SE PETROVITSKY RD, REPLACE SOUTHERLY TO APPROXIMATELY 356' NCL SE 179TH ST APPROX 793'. RESTORATION PER CITY OF RENTON STANDARDS. Replace existing 1" STW IP main (68E 191) in the cul de sac off the west side of 113th Pl SE at approximately 500' SCL SE Petrovitsky Rd. Beginning at from 10' WCL of 113 Pl SE replace westerly to the EOM at approximately 128' WCL. Approx. 121' Replace existing 1" STW IP main (68E 191) in the cul de sac off the east side of 113th Pl SE at approximately 375' NCL SE 179th St. Beginning at from 10' WCL of 113 Pl SE replace easterly to the EOM at approximately 102' ECL. Approx. 116' Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX INFRASOURCE SVCS B: (206) 949-5846Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 NGUYEN QUANG 17800 113TH PLACE NE RENTON , WA 98055 Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering MFP20004521 Scott Warlick CED 10/5/2020 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date SE PETROVITSKY RDSE PETROVITSKY RD113TH PL SEBUSSTOPBUSSTOP13131212121212 1212121212ARRW-BRD ARRW-BRD RIGHT KEEP R4-7BRIGHTKEEPR4-7BSTOPFLAGGER STOP FLAGGER W20-7ABEPREPARED TOSTOP W3-4350'350'ROAD WORK AHEAD W20-1350'350'350'RIGHT LANECLOSEDAHEAD W20-5RW4-2LW20-7ABEPREPAREDTOSTOPW3-4350'350'350'350'RIGHT LANECLOSEDAHEADW20-5RW4-2LW20-7AROADWORKAHEADW20-1 W20-4ONE LANEROADAHEAD100'100'100'STOP FLAGGER PLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKRESIDENT(S) WILL BE INFORMED OFTEMPORARY DRIVEWAY CLOSUREEMERGENCY VEHICLES WILL BEALLOWED TO PASS WORK ZONE.MOVE BUS STOP 250' WEST. NOTIFYKING COUNTY METRO CONTACTEDAT 206-477-1150 FIVE DAYS INADVANCE OF SCHEDULED DATE.X'X'PLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN1050 FEET OF WORK AREAROADWORKAHEADW20-1 ROADWORKAHEADW20-1Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLANPSEPUGETSOUNDENERGYJOB#10913222717800 113th Pl SE, Renton, WA 980559/25/2020safaa.alneema@pse.com(425) 398-6077SHEET 1 of 628" TRAFFIC CONEWORK PITTRAFFIC FLOWSIGN LOCATIONSTOPFLAGGERLEGENDCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be 70' SCL of SE Petrovitsky Rd &14-7' WCL of 113th Pl SE, and 81' SCL of SE PetrovitskyRd & 7' WCL of 113th Pl SE.NMFP20004521 SE PETROVITSKY RD SE PETROVITSKY RD 113TH PL SEBUS STOP BUS STOP 1313 1313 12121212121212121212STOP FLAGGER STOP FLAGGER W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4350'350'350' W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 350'350'350'W20-7AROAD WORK AHEAD W20-1W20-4ONE LAN E ROAD AHEAD 100'100'100' RESIDENT(S) WILL BE INFORMED OF TEMPORARY DRIVEWAY CLOSURE EMERGENCY VEHICLES WILL BE ALLOWED TO PASS WORK ZONE. PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKSIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 TEMPORARY TRAFFIC CONTROL PLAN WORK PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY N PSE PUGETSOUNDENERGY JOB#109132227 17800 113th Pl SE, Renton, WA 98055 9/25/2020 safaa.alneema@pse.com (425) 398-6077 SHEET 2 of 6 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 8. Work area will be 162-235' SCL of SE Petrovitsky Rd & 7' WCL of 113th Pl SE. MFP20004521 SE PETROVITSKY RD SE PETROVITSKY RD 113TH PL SE113TH PL SEBUS STOP BUS STOP 1313 1313 13 13 12121212121212121212STOP FLAGGER STOP FLAGGERW20-7A100'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4350'350'ROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 350'350'W20-7AROAD WORKAHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'RESIDENT(S) WILL BE INFORMED OF TEMPORARY DRIVEWAY CLOSURE EMERGENCY VEHICLES WILL BE ALLOWED TO PASS WORK ZONE. PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE L LC 000 0 0000 00 NO PARKINGNO-PARK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR K SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 TEMPORARY TRAFFIC CONTROL PLAN WORK PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY N PSE PUGETSOUNDENERGY JOB#109132227 17800 113th Pl SE, Renton, WA 98055 9/25/2020 safaa.alneema@pse.com (425) 398-6077 SHEET 3 of 6 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 8. Work area will be 282-348-352-353' SCL of SE Petrovitsky Rd & 7' WCL of 113th Pl SE. MFP20004521 17800 113th Pl SE Renton WA 98055 USA SE PETROVITSKY RD 113TH PL SE113TH PL SE1313 1313 1313 1313 STOP FLAGGER STOP FLAGGER STOP FLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROAD WORK AHEAD W20-1W20-4ONE LAN E ROAD AHEAD100'100'100'RESIDENT(S) WILL BE INFORMED OF TEMPORARY DRIVEWAY CLOSURE EMERGENCY VEHICLES WILL BE ALLOWED TO PASS WORK ZONE. PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 00 0 000 0000 NO PARKINGNO-PAR K FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 TEMPORARY TRAFFIC CONTROL PLAN WORK PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY N PSE PUGETSOUNDENERGY JOB#109132227 17800 113th Pl SE, Renton, WA 98055 9/25/2020 safaa.alneema@pse.com (425) 398-6077 SHEET 4 of 6 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 8. Work area will be 452-521' SCL of SE Petrovitsky Rd & 7' WCL of 113th Pl SE, and 15' SCL of 113th Pl SE & 130' WCL of 113th Pl SE. MFP20004521 17800 113th Pl SE Renton WA 98055 USA SE PETROVITSKY RD 113TH PL SE113TH PL SE113TH PL SE SE 179TH ST 131313131313 1313 1313 1313 STOP FLAGGER STOP FLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROAD WORK AHEAD W20-1BE PREPARED TO STOP W3-4100'100'100'RESIDENT(S) WILL BE INFORMED OF TEMPORARY DRIVEWAY CLOSURE EMERGENCY VEHICLES WILL BE ALLOWED TO PASS WORK ZONE. PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999 INFRASOURCE LLC 000 000 0000 NO PARKINGNO-PA R K FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PA R K SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 TEMPORARY TRAFFIC CONTROL PLAN WORK PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY N PSE PUGETSOUNDENERGY JOB#109132227 17800 113th Pl SE, Renton, WA 98055 9/25/2020 safaa.alneema@pse.com (425) 398-6077 SHEET 5 of 6 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 8. Work area will be 641-688-802' SCL of SE Petrovitsky Rd & 7' WCL of 113th Pl SE. MFP20004521 17800 113th Pl SE Renton WA 98055 USA113TH PL SE113TH PL SE113TH PL SE SE 179TH ST1313 13131313 1313 1313 1313 SE 179TH ST RESIDENT(S) WILL BE INFORMED OF TEMPORARY DRIVEWAY CLOSURE EMERGENCY VEHICLES WILL BE ALLOWED TO PASS WORK ZONE. PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 00 0 000 0000 NO PARKINGNO-PAR K FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK STOP FLAGGER STOP FLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD 100'100'100'ROADWORKAHEADW20-1 100' SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 TEMPORARY TRAFFIC CONTROL PLAN WORK PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY N PSE PUGETSOUNDENERGY JOB#109132227 17800 113th Pl SE, Renton, WA 98055 9/25/2020 safaa.alneema@pse.com (425) 398-6077 SHEET 6 of 6 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 8. Work area will be 379-356' NCL of SE 179th St & 7' WCL of 113th Pl SE, and 15' SCL of 113th Pl SE & 100' ECL of 113th Pl SE. MFP20004521 N Vicinity Map Owner / Developer Contact Info officeATTN: THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 109133242 108624354 108624353 GAS PROJECT PHASE Notification #Order # Main Retire SVC Retire SAP Superior Service/Meter Service/Meter HP Svc/MSA Dis. Reg. / FT Ind. MSA Ind. Service Service/Meter Service/Meter AREA PLAN SCALE: N.T.S. LEGEND ### T&T ### T&T KEY TO SERVICE ACTION FIELD NOTES: 2. NOTIFY PROJECT MANAGER IF ADDITIONAL DUPONT AND/OR STW MATERIALS ARE FOUND DURING CONSTRUCTION, 1. ALL DUPONT AND STW PIPES SHALL BE RETIRED PER SCOPE OF WORK. INCLUDING AT OR BEYOND THE CONNECTION POINTS. FIELD DESIGNER: CELL: EMAIL: CONSTRUCTION QUESTIONS: PROJECT CONTACT INFORMATION: CONST MANAGER: CELL: EMAIL: PROJ MANAGER: CELL: EMAIL: FOR MAIN DESIGNS REALIGNMENTS - FIELD DESIGNER SHALL BE CONTACTED: BILLING QUESTIONS: 425-424-6542 JACOB DETERS jacob.deters@pse.com 206-255-4824 STEVE MELLINGER steve.mellinger@pse.com 425-424-6542 JACOB DETERS jacob.deters@pse.com SAP BATCH YEAR & FOOTAGE ACTUAL LENGTH OF RETIREMENT MATERIAL RETIRED ORIGINAL JOB ORIGINAL YEAR PROPOSED LENGTH OF RETIREMENT SIZE OF RETIRED MAIN Cell Phone: "Locates Required" "Flagging Required" Yes No Yes No E-Mail: Manager: Project Manager Contact Information: JACOB DETERS 425-424-6542 jacob.deters@pse.com 109132227HOLE HOG/BORE TABLE CALLOUT LOCATION DEPTH LENGTH BP1 START BP2 END BP3 START BP4 END BP5 START BP6 END BP7 START BP8 END BP9 START BP10 END BP11 START BP12 END BP13 START BP14 END BP15 START BP16 END BP17 START BP18 END BP19 START BP20 END BP21 START BP22 END BP23 START BP24 END STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY GAS MAIN INSTALLATION/RETIREMENT SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F Type/Work ManufacturerPipe Size Type Est Length Act Lgth TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 02/18 TEST RESULTS / / / / / / Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 GASSED UP PIPELINE PIPE SEGMENT FOREMAN'S DATENAME Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 4680 06/11 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE Drawing Number SAP Sup Order Nbr PC APPROVAL J.DETERS 425-424-6542 . . R.BECK 425-424-6483 . M.LOCK 425-424-6413 . J.DETERS 425-424-6542 . JOHNSON 206-571-8519 9/30/20 ... N/A RENTON STEEL WRAP MAIN REPLACEMENT` 17800 113TH PL SE RENTON, WA 98055 PUGET SOUND ENERGY 109132227 109132227 1" = 30'-0"1/3 KING 132A SYSSKGPM NE 32-23-05 212.080 214.083 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 10913222711699688113TH PL SESTANDARD IP & LP GAS REPLACEMENT CONSTRUCTION NOTES 1.NOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED OUTAGE. 2.INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSE GAS OPERATING STANDARD 2525.2300. 3.MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300. 4.INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 AND PSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS. 5.INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICES PER PSE GAS OPERATING STANDARD 2550.1600. 6.REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS. 7.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400 AND PSE GAS FIELD PROCEDURE 4700.1500. 8.PROJECT MANAGER TO MAKE AN ACTIVE SERVICE RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION. 9.INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARD 2525.2100. 10.PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATING STANDARDS 2525.2100 AND 2525.3600. 11.REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED. 12.INSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700. 13.REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300. 14.REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985. 15.ACTIVE SERVICES TO BE REPLACED DENOTED BY: 16.MAINS AND SERVICES SHALL BE CONSTRUCTED IN ACCORDANCE WITH 2525.1200. 17. PIPE SQUEEZING SHALL BE DONE IN ACCORDANCE WITH GOS 2525.1200 AND GAS FIELD PROCEDURES 4700.1300 AND 4700.1310. ### STANDARD GAS CONSTRUCTION NOTES: 1.FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811 2.NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS). 3.ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES. 4.EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. 5.NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT THE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE. 6.ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. 7.COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE BOX (TEST LEAD) INSTALLATION. 8.PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2500. 9.INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX. 10.TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. 11.SYSTEM MAOP DENOTED BY: SYSTEM MAOP = 60 PSIG 12.GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED. 13.RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. 14.PURGE POINTS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3400. 15.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400. 16.IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH. ____JOHNSON__________________________, PHONE___206-571-8519___________. 17.NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES FOOTAGE BETWEEN FITTINGS. 18.EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL INFORMATION ON D-4 CARD)SHEET 2SHEET 3113TH PL SESE 179TH ST (ARTERIAL) SE PETROVITSKY RD (SE 176TH ST) INSTALL 2"MPE 1074' RETIRE 2"STW 821' RETIRE 2"PE 6' RETIRE 1-1/4"PE-A 8' RETIRE 1"STW 194' 60 60 PSIG 10/01/2020ML RB 10/01/2020 JD 10/05/2020 JD 10/05/2020 MFP20004521 RESTORATION PER CITY OF RENTON STANDARDS This permit is for Major construction work in the ROW and will be billed at an additional $60/HR for inspections. After hours and weekend work will be billed at $125/HR //////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// / / / / / / / / / / / / / / / / / / / / /// //////////// ///////////////////////////////////6" STW IP 35'S 852365 1985 6" STW IP 35'S 852365 1985 2" STW IP 10'W68E191 19683/4" STW IP 717'W19855/8" PE IP 81'S 1984 1/2" STW IP 235'S19695/8" MPE IP 162'S 1999 35'S 1/2" STW IP 235'S19695/8" MPE IP 282'S 1997 3/4" STW IP 348'S19681/2" STW IP 348'S19681 1/8" MPE IP 75'W20131 1/8" MPE IP 352'S20135/8" MPE IP 4 5 2 ' S IP GAS FLOW IP GAS FLOW IP GAS FLOWT&T17709T&T177031770817702T&T176221762117613T&T176141132517611T&T17716(___')11'W2" PE IP 14'W852365 1985IP GAS FLOW1/2" STW IP 353 ' S 1968 1 1/8" MPE IP 352'S 2013 1/2" STW IP 235'S 1969 ///////73'S (___')2" STWIP 10'W2" PEIP 14'WTHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PLOT PLAN SCALE: 1" = 30'-0" Cell Phone: "Locates Required" "Flagging Required" Yes No Yes No E-Mail: Manager: Project Manager Contact Information: JACOB DETERS 425-424-6542 jacob.deters@pse.com Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 4680 06/11 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE Drawing Number SAP Sup Order Nbr PC APPROVAL J.DETERS 425-424-6542 . . R.BECK 425-424-6483 . M.LOCK 425-424-6413 . J.DETERS 425-424-6542 . JOHNSON 206-571-8519 9/30/20 ... N/A RENTON STEEL WRAP MAIN REPLACEMENT` 17800 113TH PL SE RENTON, WA 98055 PUGET SOUND ENERGY 109132227 109132227 1" = 30'-0"2/3 KING 132A SYSSKGPM NE 32-23-05 212.080 214.083 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A (SE 176TH ST) MATCHLINE A-A SHEET 3 Scale: N.T.S. TIE-IN DETAIL1 1 - (ARTERIAL)113TH PL SESE PETROVITSKY RD 10/01/2020ML RB 10/01/2020 MFP20004521 / / / / / / / / / / / / / / / / / //////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// ///////////////////////////////////////////////// 0" STW IP 1 0 5 ' W NR 5/8" MPE IP 4 5 2 ' S 2007 1/2" S T W I P 6 8 8 ' S 196 9128'W1" STW IP 10'S 68E191 1968 5/8" MPE IP 379'N 2010 1/2" STW IP 802' S 1969 1/ 2 " S TW I P 6 5 ' E 1 9 6 9 1/2" S T W I P 6 5 ' E 196 9 1/ 2 " S TW I P 7 7 ' E 1 9 6 9 1/2" STW IP 78'E19705/8" PE IP 314'N 1988 10'W@BASE@BA S E 3 5 ' S73'E3/4" ST W I P 1 0 5 ' W 1969 1/2" STW IP 10 5 ' W 1968 5/ 8 " M P E I P 1 0 4 ' W 20 0 9 P IP GAS FLOW IP GAS FLOWIP GAS FLOW 178091780117808178001775017746T&T177511774717741177251772117717T&T177131774017734T&T17726T&T17716IP GAS FLOW(___')(___') (___') 1" STW IP 1 0 ' S 68E191 196 8 5/8 " P E I P 6 4 1 ' S 19 7 5 0" U n k n o w n I P N R 2" STW IP 10'W68E191 19681 1/4" PE-A IP 10'W862005 19861/2" STW I P 8 0 2 ' S NR 5/8" M P E I P 5 2 1 ' S 2007 1/2" S T W I P 6 4 1 ' S 196 9 1/2" STW IP 688'S19691/2" S T W I P 6 4 1 ' S NR 1/2" STW IP 78'E20201/2" STW IP 77'E2020//////////////2" STWIP 10'W356'N (___')(___')(___') 356'N 358'N 1 1/4" PE-AIP 10'WTHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PLOT PLAN SCALE: 1" = 30'-0" Cell Phone: "Locates Required" "Flagging Required" Yes No Yes No E-Mail: Manager: Project Manager Contact Information: JACOB DETERS 425-424-6542 jacob.deters@pse.com Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 4680 06/11 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE Drawing Number SAP Sup Order Nbr PC APPROVAL J.DETERS 425-424-6542 . . R.BECK 425-424-6483 . M.LOCK 425-424-6413 . J.DETERS 425-424-6542 . JOHNSON 206-571-8519 9/30/20 ... N/A RENTON STEEL WRAP MAIN REPLACEMENT` 17800 113TH PL SE RENTON, WA 98055 PUGET SOUND ENERGY 109132227 109132227 1" = 30'-0"3/3 KING 132A SYSSKGPM NE 32-23-05 212.080 214.083 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/ASE 179TH ST113TH PL SEScale: N.T.S. TIE-IN DETAIL2 2 - MATCHLINE A-A SHEET 2 10/01/2020ML RB 10/01/2020 MFP20004521