Matveyev Final Short Plat
LUA17-000503
3810 Park Ave N.
Confirmation of Compliance with all Conditions of Plat Approval:
1. The applicant shall submit a final detailed landscape plan that includes the required shared driveway
tract landscaping, required front yard trees for Lot 2, and complies with RMC 4-8-120D.12 at the time
of utility construction permit application to the current planning project manager for review and
approval prior to construction permit issuance. A copy of the approved Landscape plan is included
with the final short plat submittal.
2. The applicant shall submit for a demolition permit for the existing residence and all required
inspections shall be completed prior to the approval of the final short plat. A demolition permit has
been obtained and the house has been demolished.
3. The applicant shall submit a final detailed landscape plan showing two (2) additional trees on Lot 1 in
order to meet the minimum tree density requirements of three (3) trees. Onsite landscaping shall be
installed prior to final occupancy for the individual homes and landscaping within the right-of-way shall
be installed prior to short plat recording. A copy of the approved Landscape plan is included with the
final short plat submittal.
4. The applicant shall either request a variance from the Renton Fire Authority to allow a 16-foot wide
fully paved fire apparatus access roadway, or provide a 20 foot wide paved shared access driveway for
emergency vehicles. A Fire Lane Variance Request was submitted for review and addressed in the
conditions of approval. The civil plans were designed and approved per the Fire Lane Variance. A
note has been added to the final short plat map requiring Lot-2 future residence to be equipped with
a fire sprinkler system. The note is located under Plat Conditions on Sheet 1, note 2. of the final short
plat map.
5. The applicant shall record a note on the face of the plat that executes a shared maintenance
agreement for equal ownership and maintenance responsibilities for improvements in Tract A. A draft
version of the shared maintenance agreement shall be submitted for review and approval by the current
planning project manager prior to short plat recording. A Tract Note and shared maintenance
agreement note have been placed on Sheet 1 of the final short plat plan.
6. It shall be recorded on the face of the short plat that Lot 1 vehicle access shall be exclusively from the
shared driveway (Tract A) and direct access to Park Ave. N shall not be permitted. . Lot 1 will have
vehicle access from the new shared driveway and not from Park Ave N. A note is shown on Sheet 1
under Plat Conditions of the final short plat plan.
7. Project construction shall comply with the recommendations found in the geotechnical engineering
study completed by completed by Earth Solutions NW (ESNW), LLC. (dated May 18th, 2017) for the
subdivision. Construction up to date has followed the geotechnical engineering study. Completion of
the construction will comply with the geotechnical study.