Loading...
HomeMy WebLinkAboutA_Shoreline Tracking Worksheet_171228_v1DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT 1 C:\Users\Becky\Desktop\SEA Classics - permits\Intake Folder\SEA Classics Shoreline Tracking Worksheet.docx Rev: 08/2016 SHORELINE TRACKING WORKSHEET Planning Division 1055 South Grady Way, Renton, WA 98057 Phone: 425-430-7200 | www.rentonwa.gov The City of Renton is required by the Washington State Department of Ecology to track and evaluate the effectiveness of the Shoreline Master Program at achieving no net loss of shoreline ecological functions with respect to shoreline projects. The City will use shoreline development tracking information to prepare a Shoreline Master Program report every eight years to comply with the Shoreline Management Act requirements. SHORELINE STABILIZATION 1. Is there currently a bulkhead on your site?  Yes  No; If yes, fill out table below. If no, see “Site Conditions”, Section 2 below. What Type of Materials is Your Bulkhead Made of? Linear Feet of Hard Materials: Linear Feet of Soft Materials: Examples of Types of Bulkheads: Hard (e.g. rocks, wood); Soft (e.g. sand, plants); Combination-soft materials at the water with hard materials further inland, or a combination of hard and soft materials at the water. SITE CONDITIONS 2. List the size (in square feet) and type of all structures (1st floor only) on your property (e.g. 2,000 sq. ft. house, 125 sq. ft. greenhouse). 8100 SF existing commercial office structure No additional structures will be added to the property 3. List distance (in feet) from the water to the closest point of each structure. List each building separately (e.g. shed, dock, carport). 32.5’ to parking lot; 55’ to building corner 4. List the size (in square feet) and type of all impervious surfaces (e.g. driveway, parking area, walkway, patio). 28,580 – approximate area of building, parking lots, access drives No change to impervious surfaces as a result of the project RECEIVED 01/02/2018 amorganroth PLANNING DIVISION 2 C:\Users\Becky\Desktop\SEA Classics - permits\Intake Folder\SEA Classics Shoreline Tracking Worksheet.docx Rev: 08/2016 5. List distance (in feet) from the water to the closest point of each impervious surface (hard surface). 32.5’ to parking lot; 55’ to building corner 6. Describe the existing vegetation within 100 ft. of the waterline. Estimate the amount (in squ are feet) of native vegetation. Grass and ornamental plantings (e.g. plants requiring care or grown for decorative purposes) should not be counted. Deciduous trees, grasses; 15,500 SF approximately None of the vegetation is within the project area 7. Will the project require any added fill? If so, how many cubic yards will be added: No; no ground disturbance is associated with this project IN WATER AND OVER WATER STRUCTURES 8. Are there any in or over water structures on your site (e.g. docks, floats, bridges, mooring piles, boatlifts)?  Yes  No; If yes, fill out the table below. Describe the in- and over-water structures on your site The city property includes docks and other park-related structures. Type (e.g. dock, float, bridge, mooring pile, boat lift, etc.) Surface Area (in square feet, if applicable) Light Penetrating Materials (the percentage of the surface area that is made of material that allows light to reach the water) Existing structures to remain Existing structures that will be removed 3 C:\Users\Becky\Desktop\SEA Classics - permits\Intake Folder\SEA Classics Shoreline Tracking Worksheet.docx Rev: 08/2016 Proposed structures