HomeMy WebLinkAboutExhibit_7_Shoreline_Tracking_SheetDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
1
C:\Users\Becky\Desktop\SEA Classics - permits\Intake Folder\SEA Classics Shoreline Tracking Worksheet.docx Rev: 08/2016
SHORELINE TRACKING WORKSHEET
Planning Division
1055 South Grady Way, Renton, WA 98057
Phone: 425-430-7200 | www.rentonwa.gov
The City of Renton is required by the Washington State Department of Ecology to track and evaluate the effectiveness of
the Shoreline Master Program at achieving no net loss of shoreline ecological functions with respect to shoreline
projects. The City will use shoreline development tracking information to prepare a Shoreline Master Program report
every eight years to comply with the Shoreline Management Act requirements.
SHORELINE STABILIZATION
1. Is there currently a bulkhead on your site? Yes No; If yes, fill out table below.
If no, see “Site Conditions”, Section 2 below.
What Type of Materials is Your Bulkhead Made of? Linear Feet of Hard Materials:
Linear Feet of Soft Materials:
Examples of Types of Bulkheads: Hard (e.g. rocks, wood); Soft (e.g. sand, plants); Combination-soft
materials at the water with hard materials further inland, or a combination of hard and soft materials at
the water.
SITE CONDITIONS
2. List the size (in square feet) and type of all structures (1st floor only) on your property (e.g. 2,000 sq. ft.
house, 125 sq. ft. greenhouse).
8100 SF existing commercial office structure
No additional structures will be added to the property
3. List distance (in feet) from the water to the closest point of each structure. List each building separately
(e.g. shed, dock, carport).
32.5’ to parking lot; 55’ to building corner
4. List the size (in square feet) and type of all impervious surfaces (e.g. driveway, parking area, walkway,
patio).
28,580 – approximate area of building, parking lots, access drives
No change to impervious surfaces as a result of the project
RECEIVED
01/02/2018
amorganroth
PLANNING DIVISION
Approximately 150 sq. ft. of new impervious surface created by
concrete pad
55 feet to building corner and new equipment cabinet
RECEIVED
10/15/2020
AMorganroth
PLANNING DIVISION
Exhibit 7
X
Riprap
DocuSign Envelope ID: 47F26158-00CC-4DDC-AC77-F0C2D9CF8404
2
C:\Users\Becky\Desktop\SEA Classics - permits\Intake Folder\SEA Classics Shoreline Tracking Worksheet.docx Rev: 08/2016
5. List distance (in feet) from the water to the closest point of each impervious surface (hard surface).
32.5’ to parking lot; 55’ to building corner
6. Describe the existing vegetation within 100 ft. of the waterline. Estimate the amount (in squ are feet) of
native vegetation. Grass and ornamental plantings (e.g. plants requiring care or grown for decorative
purposes) should not be counted.
Deciduous trees, grasses; 15,500 SF approximately
None of the vegetation is within the project area
7. Will the project require any added fill? If so, how many cubic yards will be added:
No; no ground disturbance is associated with this project
IN WATER AND OVER WATER STRUCTURES
8. Are there any in or over water structures on your site (e.g. docks, floats, bridges, mooring piles, boatlifts)?
Yes No; If yes, fill out the table below.
Describe the in- and over-water structures on your site
The city property includes docks and other park-related structures.
Type
(e.g. dock, float, bridge,
mooring pile, boat lift, etc.)
Surface Area
(in square feet, if
applicable)
Light Penetrating Materials
(the percentage of the surface
area that is made of material that
allows light to reach the water)
Existing
structures to
remain
Existing
structures that
will be
removed
DocuSign Envelope ID: 47F26158-00CC-4DDC-AC77-F0C2D9CF8404
3
C:\Users\Becky\Desktop\SEA Classics - permits\Intake Folder\SEA Classics Shoreline Tracking Worksheet.docx Rev: 08/2016
Proposed
structures
DocuSign Envelope ID: 47F26158-00CC-4DDC-AC77-F0C2D9CF8404