Loading...
HomeMy WebLinkAboutAdden 1DocuSign Envelope ID: 7992708C-2F4E-4618-ABFC-49DB6CA68E4F CAG-20-336, Adden #1-20 AMENDMENT NO. 1 TO AGREEMENT FOR CAG-20-336 THIS AMENDMENT, dated 11-5-2020 , is by and between the City of Renton (the "City"), a Washington municipal corporation, and Perteet, Inc. ("Consultant"), a Washington corporation. The City and the Consultant are referred to collectively in this Amendment as the "Parties." Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-20-336, dated September 24, 2020 to provide necessary services for the Safe Routes to Transit — Transportation/Operations Design Engineering Services — CAG-20-336 (referred to herein as the "Agreement"); Whereas, the Parties wish to amend the Agreement to change the scope of work, time of performance and the compensation in order to add survey for NE 12th Street design services and add development of a monitoring plan. NOW THEREFORE, It is mutually agreed upon that CAG-20-336 is amended as follows: 1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit A-1, which is attached and incorporated herein. 2. Time of Performance: Section 3, Time of Performance, is amended pursuant to the schedule(s) set forth in Exhibit A-1. All Work shall be performed by no later than December 31, 2025. 3. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $25,982.00 from $79,483.00 to $105,465.00, including any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit B-1 of the Agreement, which is attached and incorporated herein. 4. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. DocuSign Envelope ID: 7992708C-2F4E-4618-ABFC-49DB6CA68E4F IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date last signed by the Parties below. CITY OF RENTON DocuSig ned by: Martin Pastucha By: Martin Pastucha Public Works Administrator 11/5/2020 1 12:32 PM PST CONSULT T By: eter De Boldt Vice President Date Date Attest N/A Jason A. Seth City Clerk Approved as to Legal Form Approved by Cheryl Beyer via 11/3/2020 email By: Contract Template Updated 01-15-2020 c .} PAGE 2 OF 2 November 2, 2020 DocuSign Envelope ID: 7992708C-2F4E-4618-ABFC-49DB6CA68E4F City of Renton 10 pERTEET Better communities, by design EXHIBIT A-1 Scope of Services Renton Safe Routes to Transit Amendment #l: NE 12th Street Survey; Monitoring Plans November 2, 2020 505 5TH AVENUE S, SUITE 300 SEATTLE, WA 98104 800.615.9900 1206.436.0515 DocuSign Envelope ID: 7992708C-2F4E-4618-ABFC-49DB6CA68E4F RENTON SAFE ROUTES TO TRANSIT —AMENDMENT #1: NE 12TH STREET SURVEY; MONITORING PLANS Agreement with Perteet Inc. November 2, 2020 During the term of this Contract, Perteet Inc. ("CONSULTANT") will perform professional services for the City of Renton (the "CITY"), as detailed below: INTRODUCTION This Safe Routes to Transit ("SRTT") project includes design work to improve pedestrian connectivity to King County Metro transit stops within Renton. GENERAL SCOPE OF SERVICES This Scope of Services amendment includes survey and basemapping for NE 12th Street and monitoring plan development for three SRTT sites in Renton that were identified in the Renton -King County Safe Routes to Transit Program Capital Improvement Agreement: Site 12—NE 12th Street, Aberdeen Avenue NE to NE Sunset Boulevard Site 13 — NE 12th Street, NE Sunset Boulevard to Union Avenue NE Site 18—State Route 900 ("SR 900") and Oakesdale Avenue SW high -intensity activated crosswalk beacon ("HAWK signal") Only local funding will be used for the design of the project. The CONSULTANT reserves the right to shift funds within the Contract between tasks, and between members of the CONSULTANT team during the prosecution of the work. The scope language for the following tasks are modified or added with this amendment. Task 1— Unchanged Task 2 — Unchanged Task 3 — Unchanged Task 4 — Unchanged Task 5 — Unchanged Task 6 — Unchanged Task 7 — Unchanged Task 8 — Unchanged Task 9 — Survey and Basemapping for NE 12th Street Task 10 — Monitoring Plan FUTURE SERVICES The CONSULTANT may be asked by the CITY to provide Future Services. Future Services that may be performed include: • Final design (plans, specification, and estimate) packages • Bid -ready design (plans, specification, and estimate) packages • Bid support services • Services during construction • Other items as desired by the City File location: Y:\Contract Administration\Contracts\Renton\20200180—Safe Routes to Transit\Amendment 1\Renton-SR17-Perteet—Amend-l- Scope2020-11-02.docx DocuSign Envelope ID: 7992708C-2F4E-4618-ABFC-49DB6CA68E4F RENTON SAFE ROUTES TO TRANSIT -AMENDMENT #1: NE 12TH STREET SURVEY; MONITORING PLANS Agreement with Perteet Inc. November 2, 2020 Providing Future Design Services will require an amendment to this agreement. TIME FOR COMPLETION All work under this Contract will be completed by December 31, 2020. SCOPE OF SERVICES Unless otherwise noted, all deliverables will be submitted electronically in PDF format. Task 1— Project Management Task I is unchanged by this amendment. Task 2 — Quality Assurance/Quality Control Task2is unchangedbythis amendment. Task 3 — Pre -Design, NE 12th Street, Aberdeen Avenue NE to NE Sunset Boulevard Task 31s unchangedby this amendment. Task 4 — Pre -Design, NE 12th Street, NE Sunset Boulevard to Union Avenue NE Task 4 is unchanged by this amendment. Task 5 — Pre -Design, Oakesdale Avenue SW HAWK Signal Task 5is unchanged by this amendment. Task 6 — WSDOT Coordination and Documentation Task his unchanged by this amendment. Task 7 — Geotechnical Engineering Services Task 71s unchanged by this amendment. Task 8 — Survey and Basemapping for Oakesdale Avenue SW HAWK Signal Task 8 is unchanged by this amendment. Task 9is added as follows: K File location: Y:\Contract Administration\Contracts\Renton\20200180_Safe Routes to Transit\Amendment 1\Renton-SR17-Perteet_Amend-l- Scope-2020-11-02.docx DocuSign Envelope ID: 7992708C-2F4E-4618-ABFC-49DB6CA68E4F RENTON SAFE ROUTES TO TRANSIT —AMENDMENT #1: NE 12TH STREET SURVEY; MONITORING PLANS Agreement with Perteet Inc. November 2, 2020 Task 9 — Survey and Basemapping for NE 12th Street 1 Alliance Geomatics (1 ALLIANCE"), as a SUBCONSULTANT to Perteet Inc., will complete survey and mapping services as defined below for NE 12th Street. The survey and mapping services will include six intersections as described below and illustrated in Figures 1-1 through 1-5: 1. NE 12th Street and Dayton Avenue NE (for new curb ramps at the north corners) 2. NE 12th Street and Lynnwood Avenue NE (supplement existing CONSULTANT basemap that endsjust west of existing curb ramps; this site will include utility locates and measure downs) 3. NE 12th Street and Redmond Avenue NE (for a potential new curb bulb at the SW corner and RRFB foundations; this site will include utility locates and measure downs) 4. NE 12th Street and Shelton Avenue NE (for new curb ramps at the south corners) 5. NE 12th Street and NE llth Place (for new curb ramps at the south corners) 6. NE 12th Street and Union Avenue NE (for new curb bulbs and ramps) Figure 1-1. Survey Extents at NE 12th Street and Dayton Avenue NE. 3 File location: Y:\Contract Administration\Contracts\Renton\20200180—Safe Routes to Transit\Amendment 1\Renton-SR17-Perteet—Amend-l- Scope2020-11-02.docx DocuSign Envelope ID: 7992708C-2F4E-4618-ABFC-49DB6CA68E4F RENTON SAFE ROUTES TO TRANSIT —AMENDMENT #1: NE 12TH STREET SURVEY; MONITORING PLANS Agreement with Perteet Inc. November 2, 2020 Figure 1-2. Survey Extents at NE 12th Street and Lynnwood Avenue NE. Figure 1-3. Survey Extents at NE 12th Street and Redmond Avenue NE. CI File location: Y:\Contract Administration\Contracts\Renton\20200180_Safe Routes to Transit\Amendment 1\Renton-SR17-Perteet_Amend-l- Scope1020-11-02.docx DocuSign Envelope ID: 7992708C-2F4E-4618-ABFC-49DB6CA68E4F RENTON SAFE ROUTES TO TRANSIT —AMENDMENT #1: NE 12TH STREET SURVEY; MONITORING PLANS Agreement with Perteet Inc. November 2, 2020 4. NE IZth Street and Shelton Avenue NE (for nevi+ curb ramps at the south corners) S. N€ IZth Street and NE IIth Place (fof new curb ramps at the south corners) Figure 1-4. Survey Extents at NE 12th Street at Shelton Avenue NE and at NE llth Place. 6. NE 12th Street and Union Avenue NE (tar new curb blufas and ramps) ir� Figure 1-5. Survey Extents at NE 12th Street and Union Avenue NE. Survey Project Management, Administration, and QA/QC This task includes the survey project management, administrative duties, and quality control required for a project of this complexity and magnitude. 5 File location: Y:\Contract Administration\Contracts\Renton\20200180_Safe Routes to Transit\Amendment 1\Renton-SR17-Perteet_Amend-l- Scope-2020-11-02.docx DocuSign Envelope ID: 7992708C-2F4E-4618-ABFC-49DB6CA68E4F RENTON SAFE ROUTES TO TRANSIT —AMENDMENT #1: NE 12TH STREET SURVEY; MONITORING PLANS Agreement with Perteet Inc. November 2, 2020 Survey Control This task includes the establishment of survey control, or the recovery of existing survey control, as required for the project. Typically, survey control will be set, found, or referenced utilizing Real Time Kinematic ("RTK") GPS (GNSS) and the Washington State Reference Network ("WSRN") in conformance with industry standards. This survey control is then typically propagated, as required, utilizing standard terrestrial station measurements. Field Surveying and Mapping This task includes the field surveying and mapping required for this specific effort. 1 ALLIANCE will be using a traditional Total Station and GPS technologies to collect the data for use in the creation of the basemap. 1 ALLIANCE will provide ground -based topographic survey to generate basemaps at 1"=20' scale and to prepare DTM generated 2-foot contours. Field survey will pick up surface observable and ground features typical for a topographic survey. Utility Surveying Services • Surface observable • Measure downs of storm and sanitary (at locations #2 and #3 only) • Underground conductible utility locates and surveying (at locations #2 and #3 only) Office Processing This task includes the office processing of the collected survey data, data extraction, field book note reductions, CADD drafting, and other duties required for the generation of the deliverable(s). Segment Basemapping The CONSULTANT will supplement the CADD file and DTM produced by 1 ALLIANCE with approximated surface features between 1 ALLIANCE survey locations. Surface features will be approximated in CADD using a collection of GIS information (e.g. parcel boundaries, utilities), site visit evaluations, field measurements, and aerial imagery. All work by the CONSULTANT will be limited to visible surface features within right-of-way; the CONSULTANT will not measure any vertical dimensions. The information developed by CONSULTANT will be used to produce a continuous basemap between Aberdeen Avenue NE and Union Avenue NE for plans development in future tasks. Assumptions: • Health, safety, and security are priority. 1 ALLIANCE personnel will not proceed if the conditions are deemed unhealthy, unsafe, or not secure from harm of any type. • 1 ALLIANCE will use appropriate signage, high -visibility clothing and traffic control devices while performing field survey. • 1 ALLIANCE is not responsible for any delays or errors caused by others. • Traffic control is not anticipated. • No right-of-way or boundary work is anticipated at this time. • Trees — type and size over 6-inches DBH. Deliverables: • 2020 Civil 3D CADD file and DTM 1.1 File location: Y:\Contract Administration\Contracts\Renton\20200180—Safe Routes to Transit\Amendment 1\Renton-SR17-Perteet—Amend-l- Scope2020-11-02.docx DocuSign Envelope ID: 7992708C-2F4E-4618-ABFC-49DB6CA68E4F RENTON SAFE ROUTES TO TRANSIT —AMENDMENT #1: NE 12TH STREET SURVEY; MONITORING PLANS Agreement with Perteet Inc. November 2, 2020 Task 10 /s added as follows: Task 10 — Monitoring Plan The CONSULTANT will develop a Monitoring Plan to guide performance -tracking efforts across all three project sites. This Monitoring Plan will consist of a memorandum indicating data collection locations, collection time periods, types of data to collect, and a schedule to analyze the complete data. Data for this project may include collision records, vehicle volumes, vehicle speeds, pedestrian volumes, bicyclist volumes, and transit ridership (boarding and/or deboarding data at nearby stops). The intent of the Monitoring Plan will be to establish a procedure for tracking the performance of the project sites before and after construction of the improvements at Sites 12, 13, and 18. The CONSULTANT assumes that data will not be collected in this phase of the project due to the anticipated delay until project construction at each site. Deliverables: • Monitoring Plan memorandum. Items to Be Prepared and/or Furnished by the Consultant See deliverables under each task. Items to be Furnished by the City • NE 12th Street title reports in locations requested by the CONSULTANT. DESIGN CRITERIA The CITY will work with the CONSULTANT to develop the basic premises and criteria for the design. Reports and plans, to the extent feasible, will be developed in accordance with the latest edition and amendments of the following: 1. AASHTO 2018, "A Policy of Geometric Design of Highways and Streets." 2. WSDOT, "Standard Specifications for Road and Bridge Construction." 3. WSDOT, "Design Manual." 4. WSDOT, "Materials Laboratory Outline." 5. WSDOT, "Construction Manual." 6. WSDOT, "Local Agency Guidelines." 7. AASHTO, "Highway Safety Manual." 8. FHWA and WSDOT, "Manual on Uniform Traffic Control Devices for Streets and Highways." 9. Standard drawings prepared by City of Renton and furnished to the Consultant will be used as a guide in all cases where they fit design conditions; where no City of Renton standard drawings are applicable, WSDOT Standard Plans will be used as a default. 10. AASHTO "Guide for the Development of Bicycle Facilities." 11. AASHTO 1993 "Guide for the Design of Pavement Structures." 12. WSDOT Highway Runoff Manual. 13. WSDOT Hydraulics Manual. 7 File location: Y:\Contract Administration\Contracts\Renton\20200180—Safe Routes to Transit\Amendment 1\Renton-SR17-Perteet—Amend-l- Scope2020-11-02.docx DocuSign Envelope ID: 7992708C-2F4E-4618-ABFC-49DB6CA68E4F RENTON SAFE ROUTES TO TRANSIT —AMENDMENT #1: NE 12TH STREET SURVEY; MONITORING PLANS Agreement with Perteet Inc. November 2, 2020 14. 2017 City of Renton Surface Water Design Manual. 15. City of Renton Municipal Code. L File location: Y:\Contract Administration\Contracts\Renton\20200180—Safe Routes to Transit\Amendment 1\Renton-SR17-Perteet—Amend-l- Scope2020-11-02.docx DocuSign Envelope ID: 7992708C-2F4E-4618-ABFC-49DB6CA68E4F EXHIBIT B-1 Consultant Fee Determination Summary 1 PERTEET 505 5th Avenue S, Suite 300, Seattle, WA 98104 1 P 206.436.0515 Project: Renton Safe Routes to Transit, Amendment #1: NE 12th Street Survey; Monitoring Plans Client: City of Renton Hourly Costs Classification Hours Rate Amount Sr. Associate 4 $211.13 $845 Lead Engineer / Mgr 4 $148.11 $592 Lead Engineer / Mgr 16 $154.41 $2,471 Engineer II 16 $102.41 $1,639 Lead Technician/Designer 4 $126.05 $504 Total Hourly Costs 44 $6,051.00 Reimbursables Expenses Amount Total Expenses 0 In -House Costs Qty Rate Amount Mileage - $.575 500 $0.575 $288 Total In -House Costs $288.00 Subconsultants Subconsultants Cost Markus Amount 1 Alliance Geomatics, LLC $19,644.00 1.00 $19,644 Total Subconsultant Costs $19,644.00 $19,644.00 Other Management Reserve Total Other Costs $0 $ 0.00 Contract Total $25,982,00 Prepared By: Brent M Powell Date: November 2, 2020