HomeMy WebLinkAboutCM_Construction_Mitigation_Description_201005_v1Construction Mitigation Description Perotto Lifts Construction Dates : The date of construction will depend on when the necessary government approvals for the lifts are issued. Installation of the lifts and canopy will take two days to complete. The in-water work window at the site is open from July 16th through December 31st. The lifts and canopy will be installed during the work window opening of 2020. Hours and Days of Operation: The work will take place during the City of Renton’s typical hours of construction which are 7:00 am through 10:00 pm Monday through Friday and 9:00 am through 10:00 pm Saturday and Sunday. Proposed Hauling/Transportation Routes: The lifts and canopy will be brought to the site by barge. Measures to be implemented to minimize dust, traffic and transportation impacts, erosion, mud, noise, and other noxious characteristics: Work will take place only during allowed hours of operation. Only a couple vehicular trips are required to install the lifts. Erosion will not be caused by the installation. Noise levels from installation are very low. Special Hours Proposed for Construction: No special hours are proposed for construction. Preliminary Traffic Control Plan: Traffic control is not necessary for the project.