Loading...
HomeMy WebLinkAboutMFP20004526.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20004526 IVR Number: 20004526 Permit Information Permit Name: Verizon - MCI Address/Location:10/05/2020Application Date:3340406260Parcel Number: 900 SW 16TH ST Permit Type:11/10/2020Issue Date:Franchise Permit Work Class:11/10/2021Expiration Date:Minor Utility Job Number: VZ00018Franchise Type:Telephone Description: Dig and intercept existing conduit. Install new 1730 handhole vault and pull new fiber/coax cable through existing "POE" conduit to customer. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Bill Carroll Utiligi Communications 111 Nyberg Rd SW Pacific, WA 98047 Applicant HOLLY NORTH MGC TECHNICAL CONSTULTING, INC 8521 154th Ave NE REDMOND, WA 98052 B: (206) 618-0651Applicant Louise Popelka Verizon MCI Buisness 3245 158th Ave SE Bellevue, WA 98008 B: (425) 240-0238Contact Matthew Sapp Verizon - MCI Contact BOSS CONSTRUCTION SERVICES dba Utiligi Communications LLC PO Box 1965 Sumner, WA 98390 B: (253) 863-3881Contractor Business License Number: 50846Construction Contractor: UTILIL*808CO JOHN C RADOVICH DEV CO 2835 82ND AV SE #S-1 MERCER ISLAND , WA 98040 Owner Amy Ledvina Verizon - MCImetro 3245 158 Ave SE Bellevue, WA 98008 H: (425) 505-5651Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 2/1/2018 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 2/1/2018 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $367.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐New Construction ☐Repair/Relocate ☐Underground ☐Overhead ☐Sidewalk ☐Street ☐Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date MFP20004526 RESTORATION PER CITY OF RENTON STANDARDS Scott Warlick 11/10/2020 DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 11/25/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 11/25/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.☐ A copy of the Traffic Control Plan (TCP) Application form. 2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ☐Include map(s) showing the location of the project and work area. ☐Be legible lettering and clear, contrasting, symbols of viewing or printing. ☐Must indicate street names, and north arrow and scale. ☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ☐Types of plans required: ☐Work hour plan – show all mobility impacts during construction hours. ☐Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ☐Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ☐Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering MFP20004526 Scott Warlick CED 11/10/2020 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 11/25/2019 APPLICANT AGREES TO ALL THE FOLLOWING: •TCP must be approved prior to commencing the work, and all permit conditions shall be met. •Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. •Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. •The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. •Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. •TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. •Approved Temporary TCP must be at the work site during work hours. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. •The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date TRAFFIC CONTROL PLAN/ROW IMPACT PLANSHORT DURATION WORK ZONEPROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCEROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT.BUFFER DATALONGITUDINAL BUFFER SPACE = B20030SPEED (MPH)LENGTH (FEET)251553053540250425360455057049555607307064565WITH TMATYPICAL PROTECTIVEVEHICLE TYPE(LBS)TYPICAL PROTECTIVE VEHICLE(WITH TMA) LOADED WEIGHT(FEET)STATIONARYOPERATIONFLAT BED, ECT.4 YARD DUMP TRUCK,SERVICE TRUCK,IN ACCORDANCE WITHMINIMUM WEIGHT 15,OOO LBS.(MAXIMUM WEIGHT SHALL BEMANUFACTURER RECOMMENDATION)30 MIN.A PROTECTIVE VEHICLE IS RECOMMENDED REGARDLESS IFA TMA IS AVAILABLE. IF NO TMA IS USED, THE PROTECTIVEVEHICLE SHALL BE STRATEGICALLY LOCATED IN THE FIELD TOSHIELD WORKERS AND NO ROLL AHEAD DISTANCE IS SPECIFIED.*CLASS OF ROADWARNING SIGN SPACINGTAPER LENGTH (L)WARNING SIGNIN FEETIN FEETCHANNELIZING DEVICE SPACING IN FEET (maximum)IIIIII*150300150300751507515040090200500Speed LimitSpeed LimitSpeed LimitSpeed Limit X 2Speed Limit X 2Speed Limit X 215203030508030X3030X3048X48XXX10'12'Lane WidthTaper (S)TangentTaper (S)TangentMIN. SIZEIN INCHESROAD CLASSIFICATIONSCLASS I - Central Business District, University DistrictCLASS II - Arterial StreetsCLASS III - All partially or full controlled access arterial streets*Advanced warning signs if feasible**Vertical barricades, cones, tubular guidepostsSW 16TH STSW 16TH STVVROADAHEADWORKRIGHT LANEAHEADCLOSEDROADAHEADWORKCENTER LANEAHEADCLOSEDTCP 1TRAFFIC CONTROL PLANREVDESCRIPTIONSHEET NUMBER:BYCLIENT:PREPARED BY:PROJECT INFORMATION:PROJECT NUMBER:111 NYBERG RD SWPACIFIC, WA 98047(253) 863-3881www.utiligi.comSEATTLE - PORTLANDCOMMUNICATIONSDATEPERMIT JURISDICTION:SHEET TITLE:DESIGNMP1906AHBN.14RENTON07/22/2020PERMITNNOT TO SCALE600 HIDDEN RIDGEIRVING, TX 75083(206) 305-5366VERIZONMFP20004526 PROJECT ROUTE (TYP)51 OF 7RENTONUTILIGI CONTACTBILL CARROLLUTILIGI COMMUNICATIONSOFFICE: (253) 863-3881BILL.CARROLL@UTILIGI.COMVERIZON CONTACT:JARED K HARRISNW FIBER ACCESS ENGINEERINGCELL: (425) 301-83671000 DENNY WAYSUITE 300SEATTLE, WA 98109VERIZON TO DIG AND INTERCEPT EXISTINGCONDUIT, INSTALL NEW 1730 HANDHOLEVAULT AND PULL NEW FIBER/COAX CABLETHROUGH EXISTING "POE" CONDUIT ASAPPROPRIATE TO CUSTOMER.NREVDESCRIPTIONSHEET NUMBER:BYCLIENT:PREPARED BY:PERMIT #:PROJECT NUMBER:111 NYBERG RD SWPACIFIC, WA 98047(253) 863-3881www.utiligi.comSEATTLE - PORTLANDCOMMUNICATIONSDATEPROJECT FOOTAGEPROJECT ROUTE MAPDRAWING INDEXPROJECT TEAMPROJECT DESCRIPTIONPERMIT JURISDICTION:07/22/2020DESIGNMP1906AHBN.14PROJECT ADDRESS900 SW 16TH STRENTON, WA 98057ASSOCIATED PERMIT #:-PAGE13DESCRIPTIONPROJECT INFORMATIONGENERAL NOTES-4STANDARD DETAILS--6 & 7SITE PHOTOGRAPHS-2SYMBOLS LEGEND*ALL FOOTAGES AND MATERIALS ARE ESTIMATEDNEW AERIAL / OVERLASH*ALL FOOTAGES AND MATERIALS ARE ESTIMATEDTOTAL FOOTAGE=====TYPELENGTH=NEW UNDERGROUNDNEW RISERSEXISTING AERIAL / OVERLASHEXISTING UNDERGROUNDEXISTING RISERS0 FT0 FT0 FT0 FT9 FT0 FT=9 FT==PRIV. PROP. AERIAL / OVERLASHPRIV. PROP. UNDERGROUND0 FT0 FT=PRIV. PROP. RISERS0 FT600 HIDDEN RIDGEIRVING, TX 75083(206) 305-5366-TCP 1TRAFFIC CONTROL PLAN(S) (WZSP)-5DETAILED UNDERGROUND PLANMFP20004526 LINETYPESEDGE OF PAVEMENTEOPEOPFOGLINEWATERSEWERPOWER / ELECTRICCOMMUNICATIONSGAS / OILDRAINDRAINAGE DITCHROCKERYPROPOSED ROUTERIGHT OF WAYROWROWDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDFLFLFLFLWWWWSSSSPPPPCCCCGGGGSYMBOLSEXISTINGHCATVCATVP2ØCATVVCATVCOMVCOMHHCOMCOMVAULTCOMVAULTCCOMCABINETTELEPHONEPOLEPOWERVAULTPOWERTRANSVPOWER2"ØPOWERPOWERSEWERDCBSTORM DRAINGAS-OILWATERLANDSCAPEROAD FEATURESSTATIONMONUMENTMON.STA 0+00STRAIGHT TRAFFIC ARROWLEFT TURN ARROWRIGHT TURN ARROWLEFT AND RIGHT TURN ARROWLEFT, RIGHT, AND STRAIGHT ARROWLEFT TURN AND STRAIGHT ARROWRIGHT TURN AND STRAIGHT ARROWBICYCLE LANEHANDICAP LABELPROPOSEDPVBORE PITR4"Ø25TAVAULT444LAVAULTCCABINETHABBREVIATIONSHATCH PATTERNSPRINCIPAL ARTERIALSMINOR ARTERIALSCOLLECTOR ARTERIALSINTERSTATE FREEWAYSACCESS STREETS (BOTH RESIDENTIAL AND COMMERCIAL)DIRECTIONAL BOREBP-01V-##BORE1CONESLANDSCAPESIDEWALK/DRIVEWAY2 OF 7REVDESCRIPTIONSHEET NUMBER:BYCLIENT:PREPARED BY:PROJECT INFORMATION:PROJECT NUMBER:111 NYBERG RD SWPACIFIC, WA 98047(253) 863-3881www.utiligi.comSEATTLE - PORTLANDCOMMUNICATIONSDATEPERMIT JURISDICTION:SHEET TITLE:SYMBOLS LEGENDDESIGNMP1906AHBN.14RENTON07/22/2020PERMITVERIZONKnow what'sbelow.before you digCall600 HIDDEN RIDGEIRVING, TX 75083(206) 305-5366MFP20004526 GENERAL NOTESI. GENERAL1.THE LOCATION OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITIES LOCATIONS SHALL BE VERIFIEDPRIOR TO CONSTRUCTION. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEADOF THE WORK, AS NECESSARY, TO DETERMINE THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES.IT IS UNDERSTOOD THAT THERE WILL BE INTERFERING UTILITIES AND OTHER UNDERGROUND PIPES, DRAINS ORSTRUCTURES ENCOUNTERED THAT ARE NOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE PLANS OR THAT HAVENOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD. THE CONTRACTOR AGREES THIS IS A NORMAL AND USUALOCCURRENCE IN THE CONSTRUCTION OF UNDERGROUND IMPROVEMENTS. FURTHERMORE, BIDDERS UNDERSTAND ANDAGREE THAT WORK IN SOME CASES MUST BE DONE IN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES,DRAINS AND STRUCTURES NOT SHOWN ON THE PLANS WHICH MAY REQUIRE A CHANGE IN OPERATIONS AND MAYCAUSE SLOUGHING OF THE TRENCH, ADDITIONAL TRAFFIC CONTROL, ADDITIONAL PAVEMENT AND BACKFILL COSTS ANDTIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF THESE OCCURRENCES IS USUAL AND ORDINARY,AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE BIDDERS AGREE TO PROVIDE FOR THESE CONFLICTSAND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGES AND/OR UTILITY RELOCATIONSDUE TO SAID CONFLICTS.2.CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 8113.INSPECTION -- THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES.4.EXCESS WATER -- SHALL WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'SRESPONSIBILITY TO DEWATER, AS PER THE STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES.5.NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROLSYSTEM.6.THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCESTO PREVENT ANY HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE.7.ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS.8.AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.9.THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITION OF THE JOB SITE,INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENTWILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS.10.PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHEREPRIOR WRITTEN APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED.11.BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ONADJACENT PROPERTIES WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACHDAY AND AS OTHERWISE REQUIRED.12.PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT,LATERAL MOVEMENT, UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION.II. TRAFFIC CONTROL1.THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILLAPPROVE ONLY THOSE LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TOACCOMPLISH A SPECIFIC TASK. NO LANE OR ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS.2.THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURINGNON-WORKING HOURS. EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'SEMPLOYEES AND AGENTS SHALL NOT PARK PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN.III. SITE PREPARATION1.SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SODSHALL BE EITHER REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE.2.SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENTWITH LIKE MATERIAL (I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE).3.EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THECONTRACTOR.IV. TRENCH EXCAVATION AND BACKFILL1.TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTORSHALL BACKFILL WITH BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS.STONEWAY MIX 351 IS ACCEPTABLE IN ALL LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON-TRAFFICAREAS. MIX 1121 IS TO BE USED IN TRAFFIC-BEARING LOCATIONS.2.COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL REQUIREMENTS.V. UTILITY DUCT1.BURIED DUCT SHALL BE (2) 1-1/4" HDPE. MINIMUM COVER SHALL BE 36" WITH A MINIMUM SLOPE OF 1/2 % TO VAULT.2.THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE ISCOMPLETED, PLUG ENDS OF CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULARCARE TO KEEP CONDUITS CLEAR OF CONCRETE, DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OFCONSTRUCTION.3.AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH.INSTALL PULL ROPE AND PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBERCABLE WILL REQUIRE SIMPLEX COMPRESSION PLUGS SEALING THE CONDUITS AROUND THE CABLE.4.OUTSIDE INNERDUCT SHALL BE 1 1/4" OPTIC-GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITHPULL ROPES & PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM-RATED.5.ALL RISERS MORE THAN 50' FROM A VAULT OR A PULL POINT ARE TO BE 4" SCHEDULE 80 PVC STOPPED AT THE BASE OFTHE POLE WITH (2) 1-1/4" HDPE DUCTS PASSING THROUGH. RISERS WITHIN 50' OF A VAULT WILL BE 4" SCHEDULE 80 PVCCONDUIT WITH (2) 1-1/4" INNERDUCTS PASSING THROUGH.VI. CONCRETE CEMENT PAVEMENT1.ALL CONCRETE CEMENT PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THESTANDARD SPECIFICATIONS OF EACH CITY OR COUNTY.VII. ASPHALT CEMENT PAVEMENT1.ALL ASPHALT CEMENT PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THEREQUIREMENTS OF EACH CITY OR COUNTY.VIII. GRAVEL AREAS1.ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOPCOURSE IN ACCORDANCE WITH THE REQUIREMENTS OF EACH CITY OR COUNTY.IX. SITE RESTORATION1.ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICHEXISTED PRIOR TO PLACEMENT OF THE CONDUIT AND STRUCTURES.2.VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN-KIND PLANT MATERIAL AND SHALL BE PROPERLYPLANTED AND WATERED IN TO ENSURE ITS SURVIVAL.3.SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEYEXISTED PRIOR TO CONSTRUCTION.X. WATER QUALITY1.CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THESTATE OF WASHINGTON'S WATER QUALITY STANDARDS.2.THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE.XI. BORING1.WHEN BORING ROADWAYS, INSTALL 2-1 1/4" HDPE CONDUITS WITH PULL ROPES AND PLUGS.2.PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATEEXISTING UTILITIES.XII. FIRE PROTECTION1.ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT.2.ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE-RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALLBE REPAIRED OR REPLACED UPON DUCT OR CABLE PLACEMENT.XIII. AERIAL1.ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS.2.ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION.3.6.6 MM STRAND TO BE USED WITH STANDARD 5/8" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRANDTO POWER MAIN WHERE APPLICABLE.4.ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE.5.IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCALAND REGIONAL GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THECONSTRUCTION PERMITS IS TO BE VALIDATED WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION.3 OF 7GENERAL NOTESREVDESCRIPTIONSHEET NUMBER:BYCLIENT:PREPARED BY:PROJECT INFORMATION:PROJECT NUMBER:111 NYBERG RD SWPACIFIC, WA 98047(253) 863-3881www.utiligi.comSEATTLE - PORTLANDCOMMUNICATIONSDATEPERMIT JURISDICTION:SHEET TITLE:DESIGNMP1906AHBN.14RENTON07/22/2020PERMITKnow what'sbelow.before you digCall600 HIDDEN RIDGEIRVING, TX 75083(206) 305-5366VERIZONMFP20004526 1730 HANDHOLE & COVERDETAIL 0232- 1 /2 "30-1 /2 "2"18"27-1/2"40 -1 /2 "37-1 / 2 "24-1/4"19-1/2"17-1/2"MAGNETIC LOCATORTAPE (ENTIRE TRENCHLENGTH)6-12"18"36" OF COVER EXISTING SURFACECONTRACTOR TO VERIFYSPECIFICATION WITH LOCALJURISDICTION.PROPOSED CONDUITBACKFILL COMPACTEDTO 90% OF MAXIMUMRELATIVE DENSITY ORSTONEWAY MIX 1004.COMPACT TO 95%UNDER ROADWAYS ORSTONEWAY MIX 351OR 1121.SURFACE RESTORATION18"DETAIL 01TYPICAL TRENCH4 OF 7STANDARD DETAILSREVDESCRIPTIONSHEET NUMBER:BYCLIENT:PREPARED BY:PROJECT INFORMATION:PROJECT NUMBER:111 NYBERG RD SWPACIFIC, WA 98047(253) 863-3881www.utiligi.comSEATTLE - PORTLANDCOMMUNICATIONSDATEPERMIT JURISDICTION:SHEET TITLE:DESIGNMP1906AHBN.14RENTON07/22/2020PERMITKnow what'sbelow.before you digCall600 HIDDEN RIDGEIRVING, TX 75083(206) 305-5366VERIZONMFP20004526 EOPEOPEOPEOPEOPEOPEOPEOPEOPDDDDDDDDDDDDDDDDDEOPEOPEOPEOPEOPEOPEOPEOPEOPWWWWWWWWWWWWWWWWWVVPPPPPPPPPPPPPPPPPLTPOLEROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWSSSSSSSSSSSSSSSSSW WWWWWWWD D CBCBSV80090080111STA 16+50STA 16+00STA 15+50STA 15+00STA 14+50STA 14+00SW 16TH STSEWER24"ØWATER12"ØCOMCOMSEWER24"ØDRAIN24"ØDRAIN24"Ø29'2V5 OF 7DETAILED UNDERGROUND PLANREVDESCRIPTIONSHEET NUMBER:BYCLIENT:PREPARED BY:PROJECT INFORMATION:PROJECT NUMBER:111 NYBERG RD SWPACIFIC, WA 98047(253) 863-3881www.utiligi.comSEATTLE - PORTLANDCOMMUNICATIONSDATEPERMIT JURISDICTION:SHEET TITLE:DESIGNMP1906AHBN.14RENTON07/22/2020PERMITN600 HIDDEN RIDGEIRVING, TX 75083(206) 305-5366VERIZONMFP20004526RESTORATION PER CITY OF RENTON STANDARDS PHOTO #3 - PULL NEW 48F FIBER CABLE THROUGHEXISTING CONDUIT.PHOTO #4 - PULL NEW 48F FIBER CABLE THROUGHEXISTING CONDUIT.PHOTO #1 - LOCATE EXISTING "POE" CONDUIT ANDOVERSET WITH NEW HANDHOLE.PHOTO #2 - TIE INTO EXISTING "POE" CONDUIT ANDPULL NEW 48F FIBER CABLE THROUGH.6 OF 7SITE PHOTOGRAPHS - SW 16TH STREETREVDESCRIPTIONSHEET NUMBER:BYCLIENT:PREPARED BY:PROJECT INFORMATION:PROJECT NUMBER:111 NYBERG RD SWPACIFIC, WA 98047(253) 863-3881www.utiligi.comSEATTLE - PORTLANDCOMMUNICATIONSDATEPERMIT JURISDICTION:SHEET TITLE:DESIGNMP1906AHBN.14RENTON07/22/2020PERMIT600 HIDDEN RIDGEIRVING, TX 75083(206) 305-5366Know what'sbelow.before you digCallVERIZONMFP20004526 PHOTO #5 - PULL NEW 48F FIBER CABLE THROUGHEXISTING CONDUIT.PHOTO #6 - PULL NEW 48F FIBER CABLE THROUGHEXISTING CONDUIT INTO EXISTING ELEC/COMM ROOM7 OF 7SITE PHOTOGRAPHS - SW 16TH STREETREVDESCRIPTIONSHEET NUMBER:BYCLIENT:PREPARED BY:PROJECT INFORMATION:PROJECT NUMBER:111 NYBERG RD SWPACIFIC, WA 98047(253) 863-3881www.utiligi.comSEATTLE - PORTLANDCOMMUNICATIONSDATEPERMIT JURISDICTION:SHEET TITLE:DESIGNMP1906AHBN.14RENTON07/22/2020PERMIT600 HIDDEN RIDGEIRVING, TX 75083(206) 305-5366Know what'sbelow.before you digCallVERIZONMFP20004526 TRAFFIC CONTROL PLAN/ROW IMPACT PLANSHORT DURATION WORK ZONEPROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCEROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT.BUFFER DATALONGITUDINAL BUFFER SPACE = B20030SPEED (MPH)LENGTH (FEET)251553053540250425360455057049555607307064565WITH TMATYPICAL PROTECTIVEVEHICLE TYPE(LBS)TYPICAL PROTECTIVE VEHICLE(WITH TMA) LOADED WEIGHT(FEET)STATIONARYOPERATIONFLAT BED, ECT.4 YARD DUMP TRUCK,SERVICE TRUCK,IN ACCORDANCE WITHMINIMUM WEIGHT 15,OOO LBS.(MAXIMUM WEIGHT SHALL BEMANUFACTURER RECOMMENDATION)30 MIN.A PROTECTIVE VEHICLE IS RECOMMENDED REGARDLESS IFA TMA IS AVAILABLE. IF NO TMA IS USED, THE PROTECTIVEVEHICLE SHALL BE STRATEGICALLY LOCATED IN THE FIELD TOSHIELD WORKERS AND NO ROLL AHEAD DISTANCE IS SPECIFIED.*CLASS OF ROADWARNING SIGN SPACINGTAPER LENGTH (L)WARNING SIGNIN FEETIN FEETCHANNELIZING DEVICE SPACING IN FEET (maximum)IIIIII*150300150300751507515040090200500Speed LimitSpeed LimitSpeed LimitSpeed Limit X 2Speed Limit X 2Speed Limit X 215203030508030X3030X3048X48XXX10'12'Lane WidthTaper (S)TangentTaper (S)TangentMIN. SIZEIN INCHESROAD CLASSIFICATIONSCLASS I - Central Business District, University DistrictCLASS II - Arterial StreetsCLASS III - All partially or full controlled access arterial streets*Advanced warning signs if feasible**Vertical barricades, cones, tubular guidepostsSW 16TH STSW 16TH STVVROADAHEADWORKRIGHT LANEAHEADCLOSEDROADAHEADWORKCENTER LANEAHEADCLOSEDTCP 1TRAFFIC CONTROL PLANREVDESCRIPTIONSHEET NUMBER:BYCLIENT:PREPARED BY:PROJECT INFORMATION:PROJECT NUMBER:111 NYBERG RD SWPACIFIC, WA 98047(253) 863-3881www.utiligi.comSEATTLE - PORTLANDCOMMUNICATIONSDATEPERMIT JURISDICTION:SHEET TITLE:DESIGNMP1906AHBN.14RENTON07/22/2020PERMITNNOT TO SCALE600 HIDDEN RIDGEIRVING, TX 75083(206) 305-5366VERIZONMFP20004526 PHOTO #3 - PULL NEW 48F FIBER CABLE THROUGHEXISTING CONDUIT.PHOTO #4 - PULL NEW 48F FIBER CABLE THROUGHEXISTING CONDUIT.PHOTO #1 - LOCATE EXISTING "POE" CONDUIT ANDOVERSET WITH NEW HANDHOLE.PHOTO #2 - TIE INTO EXISTING "POE" CONDUIT ANDPULL NEW 48F FIBER CABLE THROUGH.6 OF 7SITE PHOTOGRAPHS - SW 16TH STREETREVDESCRIPTIONSHEET NUMBER:BYCLIENT:PREPARED BY:PROJECT INFORMATION:PROJECT NUMBER:111 NYBERG RD SWPACIFIC, WA 98047(253) 863-3881www.utiligi.comSEATTLE - PORTLANDCOMMUNICATIONSDATEPERMIT JURISDICTION:SHEET TITLE:DESIGNMP1906AHBN.14RENTON07/22/2020PERMIT600 HIDDEN RIDGEIRVING, TX 75083(206) 305-5366Know what'sbelow.before you digCallVERIZONMFP20004526 PHOTO #5 - PULL NEW 48F FIBER CABLE THROUGHEXISTING CONDUIT.PHOTO #6 - PULL NEW 48F FIBER CABLE THROUGHEXISTING CONDUIT INTO EXISTING ELEC/COMM ROOM7 OF 7SITE PHOTOGRAPHS - SW 16TH STREETREVDESCRIPTIONSHEET NUMBER:BYCLIENT:PREPARED BY:PROJECT INFORMATION:PROJECT NUMBER:111 NYBERG RD SWPACIFIC, WA 98047(253) 863-3881www.utiligi.comSEATTLE - PORTLANDCOMMUNICATIONSDATEPERMIT JURISDICTION:SHEET TITLE:DESIGNMP1906AHBN.14RENTON07/22/2020PERMIT600 HIDDEN RIDGEIRVING, TX 75083(206) 305-5366Know what'sbelow.before you digCallVERIZONMFP20004526 Jared Harris MCImetro - Verizon 1000 Denny Way Suite 300 Seattle, WA 98109 425-301-8367 (telephone) Jared.Harris@verizon.com September 16th, 2020 Letter of Authorization – UTILIGI COMMUNICATIONS To Who It May Concern, MCImetro Access Transmission Services Corp. d/b/a Verizon Access Transmission Services (“Verizon”), a wholly owned subsidiary of Verizon Communications Inc., hereby authorizes Rick Powers of UTILIGI COMMUNICATIONS, to act as a Point of Contact/Representative on behalf of MCImetro Access Transmission Services Corp. for submission (and other related activities) of telecommunications facilities applications for construction of said facilities within King County Right of Way. I appreciate your cooperation in this matter. If any clarification or verification is needed, please do not hesitate to contact me directly at (425) 301-8367. Sincerely, JARED HARRIS ENGINEER III SPEC, FIBER ACCESS ENGINEERING GLOBAL TRANSPORT ENGINEERING & IMPLEMENTATION