Loading...
HomeMy WebLinkAboutAdden 12Adlbk Washington State wo Department of Transportation CAG-17-082, Adden #12-20 Supplemental Agreement Organization and Address Number 12 Perteet, Inc. 505 - 5th Ave. S., Suite 300 Original Agreement Number Seattle, WA 98104 CAG-17-082 Phone: (425) 252-7700 Project Number Execution Date Completion Date May 1, 2017 December 31, 2021 Project Title New Maximum Amount Payable N. Park Avenue Extension $982,957 Description of Work This supplement is to provide extra services as part of the final design phase for the Park Avenue N Extension project. These extra services include additional coordination with the CITY and with project stakeholders, including Boeing, SECO, and BNSF. Additionally, these extra services include additional right-of-way negotiations and design work related to these stakeholders. The Local Agency of City of Renton desires to supplement the agreement entered in to with Perteet, Inc. and executed on May 1, 2017 and identified as Agreement No. CAG-17-082 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: See attached Exhibit A-12 11 Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: No Change III Section V, PAYMENT, shall be amended as follows: These additional services will cause an increase in the amount of $34,831 for a new Maximum Amount Payable in the amount of $982,957. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By: Perteet Inc. Consultant Signature By. ��Oc'u Ci of Renton Approving Authority Signature DOT Form 140-063 Revised 09/2005 Date O m E E N - F n � aA m o ao m VpI 0t ui N Q 0 of aA T o ui V1 in m ri m Vp� y m T m 00 O n Q m 6 a n 0 O Q O O O 0 O O 0 O p E n a n m .y Q a0 m 0 0 0 0 0 a • n o n � 4 Q r aA u; v N �; n 00 a/� VY O Cl O 0 O O 0 O O E n ' n Q m o n § E a' n O O 14 O O a0 Of a o O ^ 0 O O n n m o o N m 0 o 0 n o E n n �ri o 0 o of IR co � w 0 0s0 m � n � N n N N � c n $ o 0 $ 0 0 0 0 0 c o 0 ai E w -al n of 1 ri 14 11 w n n 0 0 v 0 0 ai N 0 0 v N 0 0 0 0 H 0 0 o � N c E . n a N c E w c a a N N .i C N N n o 10 vi N Q Q 00 N m H N N an U1 V� c u 2! w N ' $ i t E O O i 5 ii 12 121 75 c C 0 2 0 w c Q O -Y c w CO w t5 w� d � E c o O vm "6 m p a C a' 00 w v c w m n c w LL a o c ,r m O w � 00 C a w w U O O to a w m c y E w w a 3 y .o w w v a G a c > > � n � Exhibit A-12 Scope of Services Park Avenue N Extension — Final Design Phase Extra Coordination and Design (#12) October 30, 2020 City of Renton 505 5TH AVENUE S, SUITE 300 PE RT E E T SEATTLE, WA 98104 800.615.9900 1 206.436.0515 PARK AVENUE N EXTENSION — EXTRA COORDINATION AND DESIGN Agreement with Perteet Inc. October 30, 2020 During the term of this Contract, Perteet Inc. (CONSULTANT) will perform professional services for the City of Renton (CITY), as detailed below: INTRODUCTION The project will construct improvements to extend Park Avenue N from the existing intersection with Logan Avenue N northward to connect to the Southport site now under construction. The purpose of the roadway extension is to provide a connection to the Southport development and relieve congestion on Lake Washington Boulevard. GENERAL SCOPE OF SERVICES This supplement is to provide extra services as part of the final design phase for the Park Avenue N Extension project. These extra services include additional coordination with the CITY and with project stakeholders, including Boeing, SECO, and BNSF. Additionally, these extra services include additional right-of-way negotiations and design work related to these stakeholders. Services not included in this scope of services are specifically excluded from the scope of the CONSULTANT's services. The CONSULTANT assumes no responsibility to perform any services not specifically listed in this scope of services. If agreed to in writing by the CITY and the CONSULTANT, the CONSULTANT shall provide Optional Services. Optional Services are not included as part of the Basic Scope of Services and shall be paid for by the Client in addition to payment for Basic Services, in accordance with the CONSULTANT's prevailing fee schedule as agreed to by the CITY and the CONSULTANT. At the CITY's request, the CONSULTANT may be asked to provide environmental support and/or construction management services. The CONSULTANT reserves the right to shift funds within the Contract between tasks, and between members of the CONSULTANT team during the prosecution of the work. Currently only local agency funds will be used in the planning, design, and/or construction of the project. The CONSULTANT will use procedures outlined in the WSDOT Local Agency Guidelines (LAG Manual) during development of the project. The following Tasks for the project are affected by this supplement. Task 2 — Agency/Large Property Owner Coordination and Planning Task 4 — Right -of -Way Acquisition Task 7 — Final Plans, Specifications, and Estimate (90% and Final) OPTIONAL SERVICES The CONSULTANT may be asked by the CITY to provide Optional Services. Optional Services that may be performed include: • Assistance with preparation of environmental documentation and permits • Assistance with preparation of grant funding packages • Assistance during Bidding by Boeing • Services during Construction File location: Y:�Controct Administration%Contracts\Renton120160266 Park AvelSupp 12_10-30-2020Tark Ave N Supp 12-SOC1020-10-30.docx PARK AVENUE N EXTENSION — EXTRA COORDINATION AND DESIGN Agreement with Perteet Inc. October 30, 2020 Providing Optional Services will require a supplement to this agreement. TIME FOR COMPLETION No change to the current contract. Task 2 — Agency/Large Property Owner Coordination and Planning Replace item 2.1 Agency/Large Property Owner Coordination and Planning and the Deliverables list from Supplemental Agreement No. 7 with the following: 2.1 Agency/Large Property Owner Coordination and Planning Organize and attend up to sixteen (16) two-hour coordination meetings with the agency/large property owner stakeholders. These meetings will to the maximum extent possible be joint meetings to share project status, issues, and areas of concern. Keeping these entities informed typically benefits the project with shorter approval cycles from the agencies and keeps the large property owners informed of project status. Deliverables • Attendance of up to two (2) CONSULTANT staff members for each coordination meeting, for a total of two (2) hours per staff member. Up to sixteen (16) meetings are anticipated. • Meeting agenda for coordination meetings, submitted via e-mail in MS Word format at least two (2) days before each meeting. Up to sixteen (16) coordination meeting agendas will be prepared. • Meeting minutes from coordination meetings, submitted via e-mail in MS Word format within three working days of the meeting. Up to sixteen (16) coordination meeting minutes will be prepared. Task 4 — Right -of -Way Acquisition Replace item 4.2 Legal Descriptions from Supplemental Agreement No. 4 with the following: 4.2 Legal Descriptions The CONSULTANT will prepare up to six (6) additional legal descriptions describing each property fee simple or easement acquisition (up to eight (8) total legal descriptions). A description of each of the legal descriptions anticipated to be required is summarized below: • Permanent easement across BNSF • Temporary construction easement across BNSF • Permanent easement across Boeing (for Park Avenue N Extension project site) • Temporary construction easement across Boeing (for Park Avenue N Extension project site) • Utility easement across Boeing (for Park Avenue N Extension project site) • Full parcel legal description for Boeing (for Park Avenue N Extension project site) • Temporary construction easement across Boeing (for N 7th Street Driveway project site) • Temporary construction easement across SECO 2 File location: Y:\Contract Administration\Contracts\Renton120160266-Park Ave\Supp 12-10-30-20201Pork Ave N Supp 12_SOC-2020-10.30.docx PARK AVENUE N EXTENSION — EXTRA COORDINATION AND DESIGN Agreement with Perteet Inc. October 30, 2020 A plan view diagram will be prepared for the legal descriptions, if requested. Replace the Deliverables list from Supplemental Agreement No. 4 with the following: Deliverables: • Right -of -Way Plans at 1"=50' scale on 22" x 34" bond, submitted electronically. • Legal descriptions on 8.5" x 11" documents describing the easement or right-of-way to be acquired. Included with the legal description will be a diagram illustrating the acquisition (the diagram will not illustrate the entire parcel). Task 7 — Final Plans, Specifications, and Estimate (90% and Final) Replace item 7.15 Project Manual from Supplemental Agreement No. 7 with the following. 7.15 Project Manual The CONSULTANT will prepare a Project Manual for the project based on English units for the 90% and final submittals. At 90%, these will include Special Provisions for the items of work that are not covered by the 2018 WSDOTI APWA Standard Specifications, including any Renton General Requirements, as well as bid and contract forms. At Final, these will include Special Provisions for the items of work that are not covered by the 2021 WSDOTIAPWA Standard Specifications, including any Renton General Requirements, as well as bid and contract forms. Task 7 from the Supplemental Agreement No. 7 is supplemented with the following after item 7.16: The CONSULTANT anticipates that the final design will include fifteen (15) additional sheets (for a total of fifty- two (52) sheets) for the Park Avenue N Extension site (excluding work within the SECO parcel) task as previously authorized within the various supplemental agreements. The CONSULTANT will reflect the requested changes by BNSF to comply with their revised crossing requirements within these sheets. The CONSLTANT will prepare three new elements based on requests from the large property owners: • Per a request by SECO, the CONSULTANT will incorporate a staging plan within the SECO parcel into the CITY's construction documents under this Task. The CONSULTANT will add additional plan sheets (three (3) plan sheets are anticipated to cover the staging details) and incorporate related quantities and, if necessary, special provisions, into the 100% PS&E resubmittal opinion of cost and project manual, respectively. • Per a request by Boeing, the CONSULTANT will design decommissioning activities and associated roadway restoration for four electrical vault manhole access lids in the Logan Avenue N right-of-way. The CONSULTANT will add additional plan sheets (four (4) plan sheets are anticipated to cover the decommissioning and restoration details) and develop and incorporate quantities and special provisions into the 100% PS&E resubmittal opinion of cost and project manual, respectively. • Per a request by SECO, the CONSULTANT will develop one (1) revised crossing layout concept exhibit to share with BNSF for feedback (anticipated to be shared with BNSF after approval of the Construction & Maintenance agreement). 3 File location- Y:\Contract Ad min istrotion�Contracts\Renton120160266_Park Ave\Supp 12_10-30-20201Pork Ave N Supp 12 SOC-2020-10-30.docx PARK AVENUE N EXTENSION — EXTRA COORDINATION AND DESIGN Agreement with Perteet Inc. October 30, 2020 DESIGN CRITERIA The CITY will work with the CONSULTANT to develop the basic premises and criteria for the design. Reports and plans, to the extent feasible, will be developed in accordance with the latest edition and amendments of the following: 1. AASHTO 2010, "A Policy of Geometric Design of Highways and Streets." 2. WSDOT, "Standard Specifications for Road and Bridge Construction." 3. WSDOT, "Design Manual." 4. WSDOT, "Materials Laboratory Outline." 5. WSDOT, "Construction Manual." 6. WSDOT, "Local Agency Guidelines." 7. Highway Research Board's Manual entitled "Highway Capacity." 8. FHWA and WSDOT, "Manual on Uniform Traffic Control Devices for Streets and Highways." 9. Standard drawings prepared by City of Renton and furnished to the Consultant will be used as a guide in all cases where they fit design conditions and where no City of Renton standard drawings are applicable; WSDOT Standard Plans will be used as a default. 10. AASHTO "Guide for the Development of Bicycle Facilities." 11. AASHTO 1993 "Guide for the Design of Pavement Structures." 12. WSDOT Highway Runoff Manual. 13. WSDOT Hydraulics Manual. 14. King County Surface Water Design Manual. 15. 2012 Department of Ecology Stormwater Management Manual for Western Washington. 16. City of Renton Municipal Code. 4 File location. Y:1Contract Administration\ContractslRenton�20160266_Park AvelSupp 12..10.30-20201Pork Ave N Supp 12_SOC-2020-10.30.docx Exhibit D Consultant Fee Determination Summary Project: N. Park Avenue Extension Supplement 12 Client: City of Renton ■ PERTEET 2707 Colby Avenue, Suite 900, Everett, WA 982011 P 425.252.7700 Hourly Costs Plus Fixed Fee Estimate Classification Hours Rate Amount Principal 22.00 93.00 $2,046 Lead Engineer/ Mgr 4.00 45.00 $180 Lead Engineer/ Mgr 86.00 47.00 $4,042 Engineer II 70.00 35.00 $2,450 Lead Technician/Designer 50.00 40.00 $2,000 Clerical 5.00 25.00 $125 Total Direct Salary Costs 237.00 $10,843 Overhead @ 189.23% $20,518 Fixed Fee @ 32.00% $3,470 Total Labor Costs $34,831 Expenses Total Expenses In -House Costs Total In -House Costs Subconsultants Total Subconsultants Reimbursables Amount 0 Qty Rate Amount 0 Subconsultants Cost Markup Amount 0 0 CONTRACT TOTAL $34,831.00 Rates shown reflect the typical compensation rate of employees assigned to the billing category listed. Each category may have multiple employees assigned to that billing category and each employee may have a different hourly rate of pay. Employee compensation is subject to adjustment in June of each calendar year. Prepared By: Peter G De Boldt Date: October 30, 2020