HomeMy WebLinkAboutSC_SEPA_Checklist_201125_v1 SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 1 of 16 21453.002-SEPA Checklist.docx SEPA ENVIRONMENTAL CHECKLIST Purpose of checklist: Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful to determine if available avoidance, minimization or compensatory mitigation measures will address the probable significant impacts or if an environmental impact statement will be prepared to further analyze the proposal. Instructions for applicants: This environmental checklist asks you to describe some basic information about your proposal. Please answer each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency specialist or private consultant for some questions. You may use “not applicable” or "does not apply" only when you can explain why it does not apply and not when the answer is unknown. You may also attach or incorporate by reference additional studies reports. Complete and accurate answers to these questions often avoid delays with the SEPA process as well as later in the decision-making process. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Instructions for Lead Agencies: Please adjust the format of this template as needed. Additional information may be necessary to evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist is considered the first but not necessarily the only source of information needed to make an adequate threshold determination. Once a threshold determination is made, the lead agency is responsible for the completeness and accuracy of the checklist and other supporting documents. Use of checklist for nonproject proposals: For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable parts of sections A and B plus the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). Please completely answer all questions that apply and note that the words "project," "applicant," and "property or site" should be read as "proposal," "proponent," and "affected geographic area," respectively. The lead agency may exclude (for non-projects) questions in Part B - Environmental Elements –that do not contribute meaningfully to the analysis of the proposal. A. Background 1. Name of proposed project, if applicable: Chevron Fuel System Replacement SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 2 of 16 21453.002-SEPA Checklist.docx 2. Name of applicant: Barghausen Consulting Engineers, Inc. 3. Address and phone number of applicant and contact person: Applicant/Contact: Barghausen Consulting Engineers, Inc. c/o Sean Anderson 18215 72nd Avenue South Kent, WA 98032 (425) 656-7460 Owner: Chevron Products Company 6001 Bollinger Canyon Road, L1164 San Ramon, CA 94583 4. Date checklist prepared: November 18, 2020 5. Agency requesting checklist: City of Renton 6. Proposed timing or schedule (including phasing, if applicable): Following issuance of all discretionary approvals, the environmental determination, and construction permits by the City of Renton, construction will commence. The project will be completed in two phases, beginning with the decommissioning and removal of the Underground Storage Tanks (USTs), fuel system piping, and dispenser sumps. The second phase includes the installation of the new USTs, product and vapor piping, and dispenser sumps, and is anticipated to be complete in the Spring of 2021. 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. There are no plans for future additions or modifications to this project. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal.  Not applicable. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 3 of 16 21453.002-SEPA Checklist.docx To our knowledge there are no other applications pending agency approval for other proposals directly affecting the subject property covered by this application. 10. List any government approvals or permits that will be needed for your proposal, if known. City of Renton:  Mechanical and Plumbing Permits  Grading Permit  Fire Permit – UST removal Washington Department of Labor and Industry:  Electrical Permit Puget Sound Clean Air Agency:  Asbestos/Demolition Notification Washington Department of Ecology:  Permanent Closure Notice of Underground Storage Tank 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) The project is the removal of three (3) 15,000-gallon gasoline Underground Storage Tanks (USTs), the installation of one (1) 20,000-gallon Regular Gasoline UST, one (1) 15,000-gallon Supreme Gasoline UST, and one (1) 12,000-gallon Diesel UST, along with four (4) new dispensers and associated product and vapor piping. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. The project parcel address is 1419 North 30th Street, Renton, W ashington 98056. B. Environmental Elements 1. Earth a. General description of the site: SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 4 of 16 21453.002-SEPA Checklist.docx (circle one): Flat , rolling, hilly, steep slopes, mountainous, other _____________ b. What is the steepest slope on the site (approximate percent slope)? 5.0(±) percent. c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils. Loamy Sand. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. No surface indicators of soil instability have been visually identified, and to the best of our knowledge, no history of soil instability exists. e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. The project proposes to disturb 2,300 square feet of impervious surface for the sole purpose of installing fuel tanks in place of older tanks and associated utilities. A preliminary analysis of cut/fill activity based on the Site Plan indicates the project will anticipate approximately 1,000 cubic yards of total earthwork. Most of the cut material will likely be hauled off site, but depending on existing soil conditions, the cut may be able to be re-compacted on site. The grading is proposed to match existing grading characteristics. Grading activity will utilize on-site material whenever possible, in an effort to minimize fill. All imported fill will be sourced from the approved sites and documented accordingly. Excavations will occur to replace Underground Storage Tanks. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. There is a relatively low risk of erosion with consideration to the proposed Erosion Control Measures for the site. Catch basin protection, covering/seeding measures, and a designated construction entrance will likely be utilized on site to minimize erosion potential. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? The subject parcel will be approximately covered in 35 percent impervious surfaces upon project completion. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 5 of 16 21453.002-SEPA Checklist.docx Catch basin protection, covering/seeding measures, and a designated construction entrance will likely be utilized on site to minimize erosion potential. After the construction is completed, final slope stabilization measures, including ground cover, seeding, mulch, and other measures, will be used as necessary. 2. Air a. What types of emissions to the air would result from the proposal during construction, operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known. During Construction: There will be construction equipment using gasoline or diesel fuels that will emit exhaust. These emissions will be temporary and will not have lasting or harmful effects on the project or adjacent properties. There may be airborne dust affecting air quality during grading activities, which will be controlled. Following Construction: Customer vehicles using gasoline or diesel fuels will commute to and from the car wash and will emit exhaust. No additional impact to the project area or surrounding properties is anticipated. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. There are no off-site sources of emissions or odor that will affect our proposal. c. Proposed measures to reduce or control emissions or other impacts to air, if any: The project will comply with all dust control measures required by the Civil Permit and will use BMPs for limiting vehicle emissions during construction. 3. Water a. Surface Water: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. There are no known streams/wetlands adjacent to the site that will be impacted by the construction phase of the project. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. The project will not be developed over or near any regulated surface water body. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. The project does not require withdrawals or diversions of existing surface water. SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 6 of 16 21453.002-SEPA Checklist.docx 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. The project does not require surface water withdrawals or diversions. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. FEMA's FIRM Map Panel No. 53033C0664G indicates that the subject site lies outside the 100-year floodplain. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. The project does not discharge any waste materials to surface waters. b. Ground Water: 1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well. Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. No groundwater will be withdrawn from a well. Discharge to groundwater is not anticipated, as the site has a developed drainage system. Any surface runoff will initially be conveyed into the existing drainage system onsite. It is possible that excavation work may reveal deposits of groundwater below grade, dictating the need for dewatering. Any dewatering will be completed on an as- needed basis and in a manner that is fully compliant with applicable regulations, including obtaining any necessary dewatering permits 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. No waste material will be discharged into the ground from septic tanks or other sources. c. Water runoff (including stormwater): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. Stormwater runoff will be generated from both impervious and pervious surfaces on site. Stormwater runoff is collected by a series of existing catch basins and then discharged to the public storm drainage system within North 30th Street. SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 7 of 16 21453.002-SEPA Checklist.docx 2) Could waste materials enter ground or surface waters? If so, generally describe. The existing water quality improvements within the project site substantially limit the chance that waste materials could enter ground or surface waters. 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. The proposed project intends to keep the natural drainage patterns unchanged. d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: The project proposal intends to match existing drainage patterns in conformance with the applicable stormwater management requirements. 4. Plants a. Check the types of vegetation found on the site: _X_ deciduous tree: alder, maple, aspen, other _X_ evergreen tree: fir, cedar, pine, other _X_ shrubs ____grass ____pasture ____crop or grain ____ Orchards, vineyards or other permanent crops. ____ wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other ____water plants: water lily, eelgrass, milfoil, other ____other types of vegetation b. What kind and amount of vegetation will be removed or altered? No vegetation will be removed or altered. c. List threatened and endangered species known to be on or near the site. There are no known endangered species on or near the site. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: The project does not include any landscaping. e. List all noxious weeds and invasive species known to be on or near the site. There are no known noxious weeds or invasive species on or near the site. SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 8 of 16 21453.002-SEPA Checklist.docx 5. Animals a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Examples include: birds: hawk, heron, eagle, songbirds , other: mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other ________ b. List any threatened and endangered species known to be on or near the site. No threatened or endangered species are known to be on or near the site. c. Is the site part of a migration route? If so, explain. The site lies within the Western Flyway, a known route for migratory waterfowl. d. Proposed measures to preserve or enhance wildlife, if any: The project does not include a measures to preserve or enhance wildlife. e. List any invasive animal species known to be on or near the site. No invasive animal species are known to be on or near the site. 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. Electricity will continue to be used to power the site. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. The project does not affect the potential use of solar energy by adjacent properties. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: There are no energy conservation features included as part of the project. 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 9 of 16 21453.002-SEPA Checklist.docx 1) Describe any known or possible contamination at the site from present or past uses. There are no known areas of contamination on site. 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. Underground storage tanks and piping associated with the existing gas station are located on site. No other hazardous chemicals or conditions have been identified. 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. Three (3) 15,000-gallon gasoline USTs are currently installed at the site, and will be removed. The project will replace the removed USTs with one (1) 20,000-gallon Regular Gasoline UST, one (1) 15,000-gallon Supreme Gasoline UST, and one (1) 12,000-gallon Diesel UST. 4) Describe special emergency services that might be required. No new emergency services are anticipated upon completion of the project. The level of fire, police, and ambulance services would be required at a level consistent the existing facility and other developments of this type. 5) Proposed measures to reduce or control environmental health hazards, if any: The USTs, product and vapor piping, dispensers and their associated sumps will all be design and installed in accordance with the local, state, and federal permits required for the project in order to control any potential environmental health hazards. b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? No existing noise from the surrounding area will affect the project. 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. Noise associated with construction activity at the project site will vary as construction progresses and depending on the equipment being used. After construction, noise will continue to be generated by automobile traffic and delivery truck traffic. These noise levels are anticipated to remain consistent with levels produced by current site activity. SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 10 of 16 21453.002-SEPA Checklist.docx 3) Proposed measures to reduce or control noise impacts, if any: A construction plan will be developed with the project contractor to ensure that construction activities occur within the allowed times. If any construction activity is anticipated to occur beyond the allowed time, an approval of limited night hour construction for specific activities will be requested from the City of Renton. 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. The neighboring property uses include residential to the south, I-405 freeway to the east, real estate offices to the west, and a gas station to the north on the other side of North 30th Street. b. Has the project site been used as working farmlands or working forest lands? If so, describe. How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use? To our knowledge, the subject site has never been used as working farmlands or forest lands. 1) Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: The project will not affect any nearby farm or forest land operations. c. Describe any structures on the site. A 1,800-square-foot convenience store and 2,000-square-foot fuel dispensing canopy exist on site. d. Will any structures be demolished? If so, what? No structures will be demolished as part of the project. e. What is the current zoning classification of the site? Commercial Neighborhood (CN). f. What is the current comprehensive plan designation of the site? Commercial Mixed Use. g. If applicable, what is the current shoreline master program designation of the site? SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 11 of 16 21453.002-SEPA Checklist.docx Not applicable. h. Has any part of the site been classified as a critical area by the city or county? If so, specify. No part of the project site has been classified as a critical area by any jurisdiction. i. Approximately how many people would reside or work in the completed project? No change from the existing. j. Approximately how many people would the completed project displace? The project will not displace anyone. k. Proposed measures to avoid or reduce displacement impacts, if any: No required measures to avoid displacement of people. L. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: The project is an improvement to an existing use that is allowed within the zone area and will remain compatible with the surrounding area. m. Proposed measures to reduce or control impacts to agricultural and forest lands of long- term commercial significance, if any: The project does not impact any agricultural or forest lands of long-term significance. 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. Not applicable. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. Not applicable. c. Proposed measures to reduce or control housing impacts, if any: Not applicable. 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 12 of 16 21453.002-SEPA Checklist.docx Not applicable. b. What views in the immediate vicinity would be altered or obstructed? Not applicable. b. Proposed measures to reduce or control aesthetic impacts, if any: Not applicable. 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? Not applicable. b. Could light or glare from the finished project be a safety hazard or interfere with views? Not applicable. c. What existing off-site sources of light or glare may affect your proposal? No sources of off-site light or glare will affect the project. d. Proposed measures to reduce or control light and glare impacts, if any: Not applicable. 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? There are no known recreational opportunities in the immediate vicinity. b. Would the proposed project displace any existing recreational uses? If so, describe. Not applicable. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: Not applicable. 13. Historic and cultural preservation a. Are there any buildings, structures, or sites, located on or near the site that ar e over 45 years old listed in or eligible for listing in national, state, or local preservation registers ? If so, specifically describe. SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 13 of 16 21453.002-SEPA Checklist.docx There are no protected buildings or structures over 45 years old on the site. b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. The project site is previously developed and there are no landmarks, features, or other evidence of Indian or historic use or occupation on or near the site. c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. The project is previously developed and does not contain any known archaeological or culturally significant resources on or around the site. d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. No measures to minimize impact on cultural or historic resources are required for the project. 14. Transportation a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. The project site is located along North 30th Avenue with two driveways providing access and the I-405 freeway is located to the west. b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If not, what is the approximate distance to the nearest transit stop? There are no known public transit stops near the project site. c. How many additional parking spaces would the completed project or non-project proposal have? How many would the project or proposal eliminate? The project site currently has 15 parking stalls, which will not be affected by the project. c. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). The project does not include any improvements to any existing transportation facilities. SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 14 of 16 21453.002-SEPA Checklist.docx d. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. No. f. How many vehicular trips per day would be generated by the completed project or proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and nonpassenger vehicles). What data or transportation models were used to make these estimates? The project will not result in any change in the current trips generated by the use. g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. No the project will not interfere with the movement of any agricultural or forest products on the surrounding street network. h. Proposed measures to reduce or control transportation impacts, if any: Not applicable. 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. The project would not result in an increase in public services including fire protection and police protection beyond what is currently provided for the site. b. Proposed measures to reduce or control direct impacts on public services, if any. None proposed. 16. Utilities a. Circle utilities currently available at the site: electricity, natural gas, water , refuse service , telephone , sanitary sewer , septic system, other ___________ b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. All aforementioned utilities are presently available and in use on site. Utilities related to underground fuel tanks are proposed to be replaced. SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 15 of 16 21453.002-SEPA Checklist.docx C. Signature The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: ___________________________________________________ Name of signee ___Sean Anderson, AICP_______ Position and Agency/Organization Senior Planner Barghausen Consulting Engineers, Inc. Date Submitted: November 18, 2020 D. Supplemental sheet for nonproject actions (IT IS NOT NECESSARY to use this sheet for project actions) Because these questions are very general, it may be helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in general terms. 1. How would the proposal be likely to increase discharge to water; emissions to air; pro- duction, storage, or release of toxic or hazardous substances; or production of noise? Proposed measures to avoid or reduce such increases are: 2. How would the proposal be likely to affect plants, animals, fish, or marine life? Proposed measures to protect or conserve plants, animals, fish, or marine life are: 3. How would the proposal be likely to deplete energy or natural resources? Proposed measures to protect or conserve energy and natural resources are: SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 16 of 16 21453.002-SEPA Checklist.docx 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? Proposed measures to protect such resources or to avoid or reduce impacts are: 5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with existing plans? Proposed measures to avoid or reduce shoreline and land use impacts are: 6. How would the proposal be likely to increase demands on transportation or public services and utilities? Proposed measures to reduce or respond to such demand(s) are: 7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the protection of the environment.