Loading...
HomeMy WebLinkAboutT-404315Y (N w a z g 0 a N O 0 N O N 00 N 0 v� 3 0 I U i 0 L_ 0 U a) I v Q V 0 v s a rn 0 rn 0 O 0 0 rn S U v 4 s 0 c N v c 0 c a� L L0 r- z 0 F_ z w ry O.D. 3' max. limits of pipe compaction gravel backfill for pipe bedding limits of pipe compaction limits of pipe O.D. compaction 3' max- ! /� 1'-01, J_ 0.15 O.D. min. 0.65 O.D. min. gravel backfill for foundations when specified A. Metal and Concrete Pipe gravel backfill , for pipe bedding gravel backfill for foundations when specified B. PIDe - Arch Installation Rigid Pipe NOTES: 1. Pipe compaction limits shown on this plan are for pipe construction in an embankment. For pipe construction in a trench, the horizontal limits of the pipe compaction zone shall be the walls of the trench. 2. All steel and aluminum pipe and pipe -arches shall be installed in accordance with design A. 3. Concrete pipe with elliptical reinforcement shall be installed in accordance with design A. 4. Concrete pipe, plain or with circular reinforcement, shall be installed with design A. 5. O.D. is equal to the outside diameter of a pipe or the outside span of pipe -arch. The dimensions shown as O.D. with 3' maximum shall be O.D. until O.D. equals 3'; at which point 3' shall be used. * 1'-0" for diameters 12" through 42" and spans through 50". 2'-0" for diameters greater than 42" and spans greater than 50". w !® PUBLIC WORKS DEPARTMENT four leve W (see note 4) limit of pipe zone Q * A = 4" min. 27" I.D. and under 6" min., over 27" I.D. Bedding for Flexible Pipe Flexible Pipe NOTES: 1. Provide uniform support under barrels. 2. Hand tamp under haunches. 3. Compact bedding material to 95% max. density; directly over pipe, hand tamp only. 4. See "Excavation and Preparation of Trench" in sanitary sewers section of the standard WSDOT/APWA specifications for trench width "W" and trenching options. The pipe zone will be the actual trench width. The minimum concrete width shall be 1 2 I.D. = 18". 5. Trench backfill shall conform to "Backfilling Sewer Trenches" in the sanitary sewers section of the WSDOT/APWA standard specifications, except that rocks or lumps larger than 1" per foot of pipe diameter shall not be used in the backfill material. 6. See "Bedding Material for Flexible Pipe" in aggregates section of the WSDOT/APWA standard specifications for the material specifications. Backfill material placed in 0.5' loose layers and compacted to 95% maximum density. Method B or C compaction (WSDOT/APWA) standard specifications.) Pipe Size Min. dist. between barrels circular pipe conc., LCPE, CMP (diameter) 12" to 24" 12" 30" to 96" diam. / 2 102" to 180" 48" pipe - arch metal only (span) 18" to 36" 12" 43" to 142" span / 3 148" to 199" 48" PIPE COMPACTION DESIGN AND BACKFILL STD. PLAN — 220.00 MARCH 2008 \' N VERTICAL CROSS FOR POLYPIGGING STATION SIZE OF VERTICAL CROSS SHALL BE THE SAME AS SIZE OF MAIN LINE VERTICAL CROSS (MJ X FL) ONE BLIND FLANGE ON TOP OF CROSS WITH 2" TAP & 2" TEMPORARY BLOW -OFF ASSEMBLY (REMOVE BLOW -OFF ASSEMBLY AND INSTALL 2" PLUG AFTER REMOVAL OF CLEANING "POLY -PIG") ONE BLIND FLANGE ON BOTTOM OF CROSS ONE PLUG (MJ) ON END OF CROSS CONCRETE BLOCKING ALL DEBRIS AND POLYPIGS SHALL BE REMOVED FROM SUMP OF VERTICAL CROSS BEFORE DISINFECTION OF NEW WATER MAIN PUBLIC WORKS DEPARTMENT POLY PIG STATION FOR CLEANING OF WATER MAINS \NIZED PIPE TOP BLIND FLANGE OLYPIG STD. PLAN — 300.6 MARCH 2010 T-404315 • U 1'1 V Cn W W O Z Z W C� Z J D Z O U N I N 0 c� o a wLd 3 w a Q = a a U Q 0 a w Q 0 Z 0 0 E .° o 2 �` f6 U > c o N L m 3 d N ~ Z O 0 O W N y2 va 0 =� O a N m v Y N 6 Z 0 Z U Z Q o � Z W H 3 W U) Z = a LU w 0 LL Cl) W O � ? a HZ Z U LU V ' 0 Q z Z Y 0 Z W SHEET: 14/WD-4 OF: 70 JOB NO.: 17534 DWG: WT_DET