HomeMy WebLinkAboutT-404339U)
w
Q
Q
00
0
0
0
00
0
v�
Q
U
U
0
U
N
i
I
a�
c
v
Q
v
a
rn
a�
0
0
0
c
�U
v
U)
0
U)
a�
c
v
v
c
0
c
a�
0
w
i
/
/ [AHEAD:]
/
/. W11-2
/ 36"x36"
..;. /
5 W16-9P
24"x 12"
ANH PHAM AND
KHIET TA
#214480-0777
RENTON
d' OH ! "�
F-
W N y�
W
w
°0
W
U)
0
00
-H
o
N
f'-
pei
U)
qr-
Lu
-H
_Z
00
J
rej
2
C�
-H
w
a
v 22+21.01
21 +68.72 3 LT
21 +06.74 6 RT
21 i 00
I 7 LT 22+00
8 I +I
w1
V
yo
w
\ 2 00
yo
,m.
yo
BEG. STA. 21 +25
"SPEED LIMIT 35"
i
PHU BUI
� MISSION WEST FOUNDATION
#214480-0774
23 + 00
"WATCH FOR ICE"
J
Lu
Lu
N
Lu
N
w
o
O
�
0
C-4
co
+
N
N
vi
W
Z
�
J
Pei
V
Q
SAAND AVID
S
#24-7O6
\
TESSA COOK
\ #214480-0845 /
MISSION WEST FOUNDATION
\ #214480-0765
KING COUNTY PROPERTY
� / \ SERVICES
\ #214480-0852
0 / SANDRA AND DAVI D
GONZALES
-077
L #216 7 \
- - _ RENTON q
o � VE S - -
N 2
Q o
5 0
w
Z 24+39.37 25+00 2 N
0 RT 27 +00
V 26+00
o
CV
j
A AND DAVID
ONZALES
4480-0776
In
0
��-
\ LAKERIDGE DEVELOPMENT \
INC
#214480-0851
GENERAL
1. ALL SIGN TYPES, COLORS, AND DIMENSIONS ARE STANDARD PER THE
MUTCD, UNLESS OTHERWISE INDICATED.
2. SIGNS SHALL BE CONSTRUCTED ENTIRELY OF TYPE III OR TYPE IV
REFLECTIVE SHEETING PER WSDOT STANDARD SPECIFICATIONS SECTION
9-28.12.
3. ALL PAVEMENT MARKINGS SHALL BE THERMOPLASTIC UNLESS INDICATED
OTHERWISE.
4. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY PAVEMENT
MARKINGS IMMEDIATELY FOLLOWING PAVING.
CHANNELIZATION NOTES:
1. CONTRACTOR SHALL FURNISH AND INSTALL 4" PAINTED EDGE LINE W/
RPMs PER COR DETAIL HR-03, COR STANDARD PLAN PAGE H008,
SHEET 41 /CH-9.
2. CONTRACTOR SHALL FURNISH AND INSTALL DOUBLE YELLOW CENTER
LINE PER COR STANDARD PLAN PAGE H001, SHEET 39/CH-7.
3. CONTRACTOR SHALL FURNISH AND INSTALL TWO-WAY LEFT TURN LANE
PER COR STANDARD PLAN PAGE H001, SHEET 39/CH-7.
4. CONTRACTOR SHALL FURNISH AND INSTALL APPROACH LINE PER COR
STANDARD PLAN PAGE H001, SHEET 39/CH-7.
5. CONTRACTOR SHALL FURNISH AND INSTALL LANE LINE PER COR
STANDARD PLAN PLAN PAGE H002, SHEET 39/CH-7.
6. CONTRACTOR SHALL FURNISH AND INSTALL 24" PLASTIC STOP LINE PER
COR DETAIL HR-03, COR STANDARD PLAN PAGE H008, SHEET
41 /CH-9.
7. CONTRACTOR SHALL FURNISH AND INSTALL 24" PLASTIC CROSSWALK
LINES PER COR STANDARD PLAN H-05, COR STANDARD PLAN PAGE
H009.1, SHEET 42/CH-10.
8. CONTRACTOR SHALL FURNISH AND INSTALL WHITE PLASTIC TRAFFIC
ARROW PER COR STANDARD PLAN PAGE H009, SHEET 41 /CH-9.
9. CONTRACTOR SHALL FURNISH AND INSTALL PLASTIC YIELD LINE SYMBOL
PER WSDOT STANDARD PLAN M-24.60-04, SEE SHEET 40/CH-8.
10. CONTRACTOR SHALL PAINT ISLAND CURB WHITE WHERE LOCATED ALONG
THE RIGHT-HAND EDGE OF THE TRAVEL LANES, AND SHALL PAINT
ISLAND CURBS YELLOW WHERE LOCATED ALONG THE LEFT-HAND EDGE
OF THE TRAVEL LANES.
11. CONTRACTOR SHALL FURNISH AND INSTALL DOUBLE ROW OF 4"
YELLOW TYPE II RPM'S AT 1 FOOT ON CENTER.
12. CONTRACTOR SHALL FURNISH AND INSTALL THREE INDIVIDUAL ROWS OF
4" YELLOW TYPE 1 RPM'S AT 1 FOOT ON CENTER.
13. CONTRACTOR SHALL FURNISH AND INSTALL YELLOW FLEXIBLE MARKER.
SIGNING NOTES:
1. CONTRACTOR SHALL PROTECT EXISTING SIGN DURING CONSTRUCTION.
2. VACANT.
3. CONTRACTOR SHALL RELOCATE EXISTING SIGN. FURNISH AND INSTALL
NEW POST AND HARDWARE. WASTE HAUL EXISTING POST AND
FOUNDATION.
4. VACANT.
5. CONTRACTOR SHALL FURNISH AND INSTALL NEW SIGN(S) AND POST PER
COR STANDARD PLANS 129 AND 134, SHEET 38/CH-6.
6. CONTRACTOR SHALL COORDINATE WITH METRO TRANSIT FOR TEMPORARY
SIGN RELOCATION DURING CONSTRUCTION AND FOR PERMANENT SIGN
LOCATION.
7. CONTRACTOR SHALL FURNISH AND INSTALL NEW SIGN(S) ON
TEMPORARY POST.
T 404339
20' 10' 0 20' 40' 0 1 It
2"
SCALE: 1 "=20' TWO INCHES AT FULL SCALE.
IF NOT, SCALE ACCORDINGLY
0
0
!3
0
m
o
F-
N
..
w
o
Q
z
Y
0
a
Q
Ld
�j
0
`� "
�L
>°
o
N
m
N
J
z
O
O
U
w
Q
=�
m
w
N
0
a
m
�,
m
U
V)
w
0
z
(D
Z
C�
z
Q
O
LL
z_
�
Z
=
z
O
V)
Lu
J
F
a
Z
W
�
o
�
=
a
N
ILL
O
W
w
z
z
~
Z
a
0
W
=
V
U
i
U
0
Q
z
Z
Y
O
F_
Z
W
OC
SHEET: 35/CH-3
OF: 70
JOB NO.: 17534
DWG:CHAN