HomeMy WebLinkAboutC20002725.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Construction Permit: C20002725
IVR Number: 20002725
Permit Information
Permit Name: 4920 SE 2nd Frontage Improvements
Address/Location:06/29/2020Application Date:6928000450Parcel Number: 4920 SE 2ND ST
Permit Type:12/04/2020Issue Date:Engineering_2019
Permit Work Class:12/06/2021Expiration Date:Construction
Description: Frontage improvements for 4920 SE 2nd St
Contacts
Name Address PhoneTypeBilling
Bob (Robert) Wenzl
Tuscany Construction LLC
PO Box 6127
Bellevue, WA 98008
B: (206) 714-6707ContactX
Eric & Anne Wisdom
Diamond W Excavating, LLC
PO Box 124
Ravensdale, WA 98051-0124
B: (253) 261-4574
C: (253) 653-5022
Contractor
Business License Number: 52251Construction Contractor: DIAMOWE827K4
ANDREW MICHAEL CONSTRUCTION PO BOX 6127
Bellevue, WA 98008
Contractor
Darrell Offe
Offe Engineers, PLLC
13932 SE SE 159th Pl
Renton, WA 98058-7832
B: (425) 260-3412Engineer
ANDREW MICHAEL CONSTRUCTION PO BOX 6127
BELLEVUE , WA 98008
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton codes and ordinances.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES