LETTER OF TRANSMITTAL
To: RJ Development
401 Central Street SE
Olympia, WA 98501
Attn: Mr. Duane Meyer
Email: duane(a�accrete.build
No. of
Date: August 5, 2019
ESNW No.: ES- 895.06
Project: Weatherly Inn
Copies Date Description
tlon
1 8/2/19 Daily Field Re arts # 2
Comments:
CC:
1:
2:
3:
4:
5:
John Wilson
Transmitted By: Earth Solutions NW, LLC
PM: Kyle Campbell, P.E.
ATTN.
ATTN:
ATTN
ATTN
ATTN
iohnw@rinocon.com
1805 — 136"' PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
Earth Solutions NW«C
I t 1805 136" Place NE, FAX:
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425)449-4704 (866)366-8710
DAILY FIELD REPORT
Project Name
Weatherly Inn
General Contractor
Field Rep T Project No
AK 0895.06
Page of
1 /1
Report No,
2
Time On Site Time Off Site
Date
Day of Week
9:00 AM; 9:45 AM;
8/2/19
Friday
12:15 PM 1:45 PM
Weather
Travel Time
1.25 Hr. RT
70s°F, Overcast
Job Location
4500 Talbot Rd. S., Renton, WA
~General Contractor's Superintendent
Grading Contractor
Grading Foreman
Rino Construction
Rod
Are approved Plans/Permits onsite
El YES ❑ NO Project No
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
Permit No.
W S/6
At the client's request, ESNW rep was onsite to observe and test mass fill, rockeries and earthwork activities.
Mass Fill
While onsite, rep observed contractor use two large excavators, a large dozer, and several haul trucks. Rep observed
contractor export material offsite, place and compact with native material for general fill in the northwest corner of the
site. Rep observed contractor using a large sheep's foot roller for compaction. Rep collected sample proctor of native
brown silty sand with gravel material. Rep took compaction tests and will release compaction test results once proctor
is processed.
Rockeries
Prior to arrival, rep observed that contractor had cut the keyways for the rockeries located along the east face of the
site. Rep used a'/" steel t-probe and observed the keyway subgrade to be very dense, firm, unyielding, and suitable
for support of the proposed rockeries.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE
of