Loading...
HomeMy WebLinkAboutC_Statement_Confirmation_Compliance_Conditions_Huynh_Short_Plat_200916_v1.pdfStatement of Confirmation of Compliance with all Conditions of Plat Approval: Huynh Short Plat, File No. LUA17-000855 1. The applicant shall comply with all recommendations in the Geotechnical Engineering Study prepared by Migizi Group, Inc (dated July 14, 2017). Infrastructure construction conforms to the Geotech recommendations. 2. The applicant shall obtain a demolition permit and complete a final inspection from the City for the removal of the residence and garage located on future Lots 1 and 2 in order to comply with the Residential-6 (R-6) setbacks prior to final plat approval. A demolition permit has been obtained and the house has been demolished. 3. The applicant shall record a note on the face of the plat that executes a shared maintenance agreement for equal ownership and maintenance responsibilities for improvements in Tract A. A draft version of a shared maintenance agreement shall be submitted for review and approval by the current planning project manager prior to short plat recording. A New Private Access and Utilities Easement and Maintenance Agreement is shown on Sheet 1 of the final short plat map. 4. The applicant shall submit revised landscape plan with a 10-foot landscape strip across the entire frontage of Lot 1 in order to demonstrate compliance with the landscape requirements in RMC 4-4-070. Landscape plans were submitted and approved with civil construction plan review. 5. New fencing installed along the north property line shall be installed in a manner that will not damage the offsite trees on the adjacent properties. Any proposed new fencing will be installed in a manner that will not damaged the offsite trees on the adjacent properties. 6. A curb shall be constructed between the driveway edge and the landscape buffer in order to protect the landscape strip from impacts created by vehicles. Curb construction will be done per plan. 7. The applicant shall comply with the recommendations of the Arborist Report prepared by Arborist NW (dated November 10th, 2017) while ensuring fire department apparatus roadway requirements are still being met. Construction is following the recommendations of the Arborist Report. 8. Lot 1 shall be required to take access from the shared driveway tract, specifically off the hammerhead turn around. This restriction shall be record on the face of the short plat. A note has been added to sheet 1 of the final short plat map under Plat Condition. 9. The combined building setback area for the north and south yards on Lot 1 shall be 20 feet, with a minimum of 10 feet on the north property line. Noted. Building permit requirement. 10. The garages associated with the homes on Lot 1 and Lot 2 shall be located on the west facades of the homes and the garage doors shall not be visible from the public street. Noted. Building permit requirement. 11. The north facade of the homes (secondary front yard) on Lot 1 and Lot 2 shall be designed in a way that provides significant visual interest including but not limited to: extra glazing, building modulation, and material variation. The design shall be submitted with the building permit application for each lot and shall be approved by the Current Planning Project Manager prior to building permit issuance. Noted. Building permit requirement.