Loading...
HomeMy WebLinkAboutHeritage elect - exterior 2.5.08Panel APANEL SCHEDULEPROJECT:HEATHER DOWNS PARK120/240V, 1Ph, 3W. 200A BusMAIN BREAKER SURFACE MOUNTED 14-Feb-08Ckt. Description / Load Load C.B. C.B. C.B. C.B. Load Load Description / Ckt.No. Location (VA) Type Amp Pole Phase Amp Pole (VA) Type Location No.1REC - RESTROOMS 360 R 20 1A20 1 354 L LTG - INTERIOR RESTROOM23REC - MECH/ELEC ROOM 360 R 20 1C20 1 300 L LTG - EXTERIOR RESTROOM45HAND DRYER 750 G 20 2A20 1 128 L LTG - PICNIC SHELTER67--- 750 G - -C30 2 2,040 M IRRIGATION BOOSTER PUMP89HAND DRYER 750 G 20 2A- - 2,040 M ---1011--- 750 G - -C20 1 500 G IRRIGATION CONTROL CABINET1213EF-1 1,176 H 20 1A20 1 SPARE1415UH-1 950 H 20 1C20 1 SPARE1617REC - HEAT TRACE CABLE 500 G 20 1A20 1 SPARE1819SPACECSPACE2021SPACEASPACE2223SPACECSPACE2425A2627C2829A3031C3233A3435C3637A3839C4041A42Total Connected Load: Ph A 6,058 VA 50 ATotal Connected Load: Ph C 5,650 VA 47 ATotal Connected Load:11.7KVA Total Demand Load:11.9KVA32.5AMPS33.1AMPS