Loading...
HomeMy WebLinkAbout0895.06 DFR 271.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. AES 0895.06 1 of 1 271 Time On Site Time Off Site Date Day of Week 8:10 8:25 1/19/21 Tuesday Travel Time Weather 1 hr. 33°F, Fog Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd S, Renton RJ Development, LLC General Contractor Contact Field Supervisor Reviewed Accrete Construction, LLC Joe LAC/MTK Contractor #2 Contact Project Manager Reviewed SSR Are approved plans/permits on site? Project No. Permit No. As requested by the client, ESNW representative was onsite for testing of turbidity and pH of baker tank for discharge into stormwater system. While onsite, ESNW rep. observed the following: Eastern Baker Tank 1. pH: 7 2. Turbidity: 0.00 NTU The Eastern baker tank is suitable for discharge into the stormwater system. ESNW rep. will return as requested. Alexandra Shaner Field Technician (206) 355-877