HomeMy WebLinkAboutMFP21000375.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP21000375
IVR Number: 21000375
Permit Information
Permit Name: Puget Sound Energy Gas Permits
Address/Location:01/26/2021Application Date:7227801690Parcel Number: 2800 NE 12TH ST
Permit Type:02/09/2021Issue Date:Franchise
Permit Work Class:02/09/2022Expiration Date:Minor Utility
Job Number: 108627156Franchise Type:Natural Gas
Description: PSE Gas TRUCK SETUP AND TEMP LANE CLOSURE ALONG 13TH ST NE. CREW TO CUT AND CAP EXISTING 2"
MAIN. RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
INFRASOURCE SVCS B: (206) 949-5846Contractor
Business License Number: 36742Construction Contractor: INFRASL871C2
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
MFP21000375
Scott Warlick CED 2/9/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
16162020NE 12TH STHARRINGTON AV
N
E
1
3
TH
S
T
HARRINGTON AV
#2800STOP
FLAGGER STOP
FLAGGER
STOP
FLAGGER
W20-7AROAD
WORK
AHEA
D W20-1W20-4ONE LA
NE
ROAD
AHEA
D
1
0
0
'
1
0
0
'
1
0
0
'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'
W20-7A
W20-4ONE LANEROADAHEAD100'100'ROADWORKAHEADW20-1
100'
ROAD
WORK
AHEAD W20-1100'ROADWORKAHEADW20-1100'NPSEPUGETSOUNDENERGYJOB#1086271562800 NE 12th St Renton, WA1/14/2021stephen.gadke@pse,com425-424-6431SHEET 1 of 2TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Stephen R GadkeCard No. 010741Exp.5/31/2021stephen.gadke@pse.com(425) 424-6431Notes:1. All signs and spacing to conform to theMUTCD and Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 30" x 30" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be approx. 61' ECL of Harrington Av& 10' SCL of NE 12th St.CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT80604055 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840WORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP21000375
2020NE 12TH STNE
1
3
TH
S
T
HARRINGTON AV
#2800ROADWORKAHEADW20-1
100'
ROAD
WORK
AHEAD W20-1100'maintain 10' lane widthSHOULDERWORKW21-5ROADWORKAHEADW20-1100'100'FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK ROADWORKAHEADW20-1100'M6-2FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKNotes:1. All signs and spacing to conform to theMUTCD and Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 30" x 30" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be approx. 98' ECL of Harrington Av& 19' SCL of NE 13th St.CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT80604055 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840WORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYNPSEPUGETSOUNDENERGYJOB#1086271562800 NE 12th St Renton, WA1/14/2021stephen.gadke@pse,com425-424-6431SHEET 2 of 2TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Stephen R GadkeCard No. 010741Exp.5/31/2021stephen.gadke@pse.com(425) 424-6431MFP21000375
1
2
3
4
5
6
7
8 9
10
11HARRINGTON AVE NENE 13TH ST
TRACT A2" MP
E I
P
1
0'
S
1090
4
6
4
8
0-
2
0
0
9
10'S
5/8" MPEI200861'E5/8"
MPE
I2008
5/8"
MPE
I2008
2811
2" MPE IP 10'W109046480-20092812
5/8" PEI19825/8"98'E98'E196'E21'S
23'S
16'S
10'W15'W13'W17'W20'S 19'W6" MPE IP 19'S
109032444-2007
6" MPE IP 19'S
109032444-2007
6" MPE IP 9'W109046484-2009DEACT 2" STW 18'W & 6'W 109046480-2010DEACT 2" STW 25'W 109046480-2010DEACT 2" STW 18'S 109032444-2007TRACT CTRACT B167'E170'E
29'50'
60'50'25'N10'W10'W12'W6'WNE 12TH STREET
FLOWSEE CONST.
DETAIL
SEE CONST.
DETAIL FLOW
N
Vicinity Map
47.5033, -122.1819
Owner / Developer Contact Info
officeATTN:
GREYSTROKE, LLC
2325 NE 28TH ST
RENTON, WA 98056
JIM HOWTON 425.985.2024
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
GENERAL NOTES - GAS (JOINT TRENCH):
1" = 50'-108627156Excavator to contact Utilities Underground Location Center (One-Call) 48 hours prior to construction, to two
working days prior to construction. 1-800-424-5555
Notify appropriate permitting agency prior to job start (see permit requirements).
Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion
and Sediment Control and any additional local jurisdiction requirements.
Any change in route, pipe size/type, tie-in method or additional main footage must be approved by the
appropriate Engineer/Project Manager.
Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities.
Check box on report for wire box (Test Lead) installation.
Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating
Standard 2525.2500.
To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on
this design, unless approved by the appropriate Engineer/Project Manager.
System MAOP denoted by System MAOP = 60 PSIG
Install Main Valves out of traffic where possible.
Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed.
Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE Gas
Operating Standards 2525.1200 and 2525.2300.
If STW pipe involved, coordinate installation with CP Tech. ____________ Cell # ___________ .
Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas
Field Procedures Manual 0812 and 0813.
Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400.
Unless otherwise noted:
All pipes installed in plat to be 2" MPE-___.
All crossings to be Yellow 4" PVC.
All Services to be 1-1/8" PE.
/ denotes service stub location.
(________') denotes footage between fittings.
Customer to dig and backfill on private property or easement only. Trenches must conform to PSE Gas
Operating Standards 2525.1500, 2525.1600 and 2525.1700.
Note all recordable footages, locations and material changes on the as-built in red.
Upon completion of the project send the print copy, along with the completed work order, listing crew & actual
materials used to the appropriate design group.
On site pre-con required before start of job.
At symbol: install natural gas main piping and fixtures. Size as indicated on tables and
work sketch (gas main is to parallel power system unless otherwise shown on work sketch).
Inclement weather conditions may cause delays in construction times and dates.
19.
20.
18.
16.
17.
15.
14.
13.
6.
9.
11.
12.
10.
8.
7.
3.
5.
4.
2.
1.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC OP MAP
Emer Sect GAS WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
CP APPROVAL
MAPPING
SCALE PAGE
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY CONTACT PHONE NO DATE
ELEC Order Number
SAP Sup Order Nbr
PC APPROVAL
R. BLACKIE 425.457.2614 6.1.20
R. MILLER 253.988.6298 1.12.21
R. MILLER 253.988.6298 1.12.21
REDT # (RW-115276)CITY OF RENTON
28 HUNDRED
GAS SERVICE RETIREMENT
2800 NE 12TH ST, RENTON, WA 98056
PUGET SOUND ENERGY
108627156
-
1" = 50'1 OF 1
KING 30 CIKNC
04SW-T23N-R05E 204.080 205.084
-
-
-
-
-
-
RIGHT OF WAY
-
-
.
.
.
N/A N/A N/A
...
21.
Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
Reviewed and complied with all construction notes.
Recorded all required information on the as-built per GOS 2500.1700.
Completed post installation inspection per GOS 2525.1200 and 2525.2700.
Left the work area in a clean and safe condition.
FITTER'S CHECKLIST
Foreman's Name (printed) ___________________________________
Foreman's Signature________________________________________
Company: __________________ Date ______________
(CHECK BOX TO CONFIRM COMPLETION)
510537683 108627156
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
GAS
PROJECT PHASE Notification #Order #
Retirement
Relocate
SAP Superior
Retire - 2801
Service/Meter
HP Svc/MSA
Dis. Reg. / FT
Ind. MSA
Ind. Service
Service/Meter
Retire - 2803
4680 06/11
STOP TIME
START TIME
GAS MAIN PRESSURE & TESTING
TESTED BY
GAS MAIN INSTALLATION/RETIREMENT
SOAP AIR NITROGEN WATER
SOAP AIR NITROGEN WATER
STOP TIME
START TIME TESTED BY
TEST RESULTS P F
TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
P F
Type/Work ManufacturerPipe Size Type Est Length Act Lgth
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
DATE OFF
TYPE TEST
PRESSURE
SYS MAOPDESIGN PRESS
DATE ON
2023 02/18
TEST RESULTS
/ /
/ /
/ /
Verify Testing Requirements, Chart vs Gauge
GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5
INSTALL -MPE-__-
JOINT -MPE-__-
....
....
....
....
Cell Phone:
Project Manager Contact Information:
"Locates Required"
"Flagging Required"
Yes No
Yes No
E-Mail:
Manager:RANDY BLACKIE
425.457.2614
randy.blackie@pse.com
60 IP 088-60
N/A N/A
SITE PLAN
xx
INSTALL - = -
JOINT - = -
...
...
...
JOINT TRENCH DETAIL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
Primary & Secondary-Mainline Gas & Communications (NTS)
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power 48"
Max
Depth
Final Backfill
Gas
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
6" or 12" Min Sand Shading
Over Gas after Compaction
12" Min
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
12" Min
12" Min
Separation
4,5
1,2
1
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
jimhjim1111@comcast.net
IP 088-60
STOP TIME
START TIME
GAS MAIN PRESSURE & TESTING
TESTED BY
SOAP AIR NITROGEN WATER
SOAP AIR NITROGEN WATER
STOP TIME
START TIME TESTED BY
TEST RESULTS P F
TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
DATE OFF
TYPE TEST
PRESSURE
SYS MAOPDESIGN PRESS
DATE ON
2023 03/10
TEST RESULTS
/ /
/ /
/ /
STOP TIME
START TIME TESTED BY
SOAP AIR NITROGEN WATER
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
TEST RESULTS
/ /
STOP TIME
START TIME TESTED BY
SOAP AIR NITROGEN WATER
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
TEST RESULTS
/ /
STOP TIME
START TIME TESTED BY
SOAP AIR NITROGEN WATER
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
TEST RESULTS
/ /
STOP TIME
START TIME TESTED BY
SOAP AIR NITROGEN WATER
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
TEST RESULTS
/ /
GASSED UP PIPELINE
PIPE
SEGMENT
FOREMAN'S DATENAME
60
Verify Testing Requirements, Chart vs Gauge
GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5
SITE
42"
45°42"
1'
45°Property LineRoad Side
Top View of Mainline Trench for
Single Stubout Location
4'Property LineRoad Side
Top View of Mainline Trench for Pedestal
or Double Stubout Location
42"45°
4'
45°
STUBOUT EXCAVATION DIMENSIONS
NOT TO SCALE
NOT TO SCALE
CROSS SECTION - NE 13TH ST
LOOKING EAST
S
50' ROW
N
G
EX 2" PE IP - 10'S
109046480-2009
T01
CONSTRUCTION DETAIL
N.T.S.
T02
CONSTRUCTION DETAIL
N.T.S.
CUT & CAP
CAP 5/8" MPE IP
98'E C/L & 19'S C/L
_____'E C/L & _____'S C/L
EXISTING 5/8" SERVICE
TO BE DEACTIVATED
CUT & CAP
CAP 5/8" MPE IP
61'E C/L & 10'S C/L
_____'E C/L & _____'S C/L
NE 13TH ST
5/8" MPEI200861'E2" MPE IP 10'W109046480-2009FLOW
1170 5/8"98'E98'E21'S
23'S
16'S
10'W15'W13'W17'W20'S 19'W6" MPE IP 19'S
109032444-20076'WNE 12TH STREET HARRINGTONAVE NEHARRINGTONAVE NE2800
2801
1308
S
50' ROW
N
NOT TO SCALE
CROSS SECTION - NE 12TH ST
LOOKING EAST
G6" MPE IP 19'S
109032444-2007
MFP21000375
RESTORATION PER CITY OF RENTON STANDARDS