Loading...
HomeMy WebLinkAboutMFP21000432.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21000432 IVR Number: 21000432 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:01/28/2021Application Date:6766000020Parcel Number: 2604 LYNNWOOD AVE NE, LOT Permit Type:02/09/2021Issue Date:Franchise Permit Work Class:02/09/2022Expiration Date:Minor Utility Job Number: 105096480Franchise Type:Electric Description: Puget Sound Energy Electric PERM UG POWER REPLACING XFMR AT V01 AND INSTALLING NEW UG WIRE APPROX 190' IN ROW. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708Contact ONG ROSE + PHUNG KIET 2610 LYNWOOD AVE NE RENTON , WA 98056 Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering MFP21000432 Scott Warlick CED 2/9/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date 2604 Lynnwood Ave NE Renton WA 98056 USA 100'100'ROAD WORK AHEAD W20-1W20-7A100' STOP FLAGGER LYNNWOOD AVE NESE 9 6 T H P L NE 26TH CT 100'100'100'ROADWORKAHEADW20-1W20-7AR9-9 SIDEWALKCLOSEDFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKR9-9SIDEWALKCLOSEDV01 W20-7A BE PREPAREDTO STOP W3-4BEPREPAREDTOSTOPW3-4RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE 15151515N TEMPORARY TRAFFIC CONTROL PLAN PSE PUGETSOUNDENERGY JOB January 11, 2021 105096480 2604 Lynnwood Av, Renton, WA Yuriy.Bashtovoy@pse.com (425)424-6603 SHEET 1 of 2 SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 L=W S 60 2 Puget Sound Energy Traffic Control Supervisor: Yuriy S. Bashtovoy Card No. 011687 Card Exp. 06/30/2022 Yuriy.Bashtovoy@pse.com (425)424-6603 0'60'30' 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP VAULTVault WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY PRINT ON 11 X 17 SHEETS ONLY Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 30" x 30" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. MFP21000432 W20-1ROADWORKAHEAD STOP FLAGGERLYNNWOOD AVE NESE 9 6 T H P L NE 26TH CT STOP FLAGGERONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7AR9-9SIDEWALK CLOSED R9-9SIDEWALKCLOSEDFROM TO TOW AWAY AREA PHONE 888-9999INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK 2604 Lynnwood Ave NE Renton WA 98056 USA W20-7AROAD WORK AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1 W20-4ONE LANEROADAHEADX'X'X' USE MAXIMUM AVAILABLE SPACE FOR SIGNS RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE 15151515N TEMPORARY TRAFFIC CONTROL PLAN PSE PUGETSOUNDENERGY JOB January 11, 2021 105096480 2604 Lynnwood Av, Renton, WA Yuriy.Bashtovoy@pse.com (425)424-6603 SHEET 2 of 2 SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 L=W S 60 2 Puget Sound Energy Traffic Control Supervisor: Yuriy S. Bashtovoy Card No. 011687 Card Exp. 06/30/2022 Yuriy.Bashtovoy@pse.com (425)424-6603 0'60'30' 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP VAULTVault WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY PRINT ON 11 X 17 SHEETS ONLY Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 30" x 30" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. MFP21000432 2610 3232 2551 2552 2540LYNNWOOD AVE NE3215 9626 9634 9621 96279633 3226 SE 96TH PL NE 26TH CT 319090-166800 50 kVA 120/240V (C) 319115-166824 37.5 kVA 120/240V (C) 2604 DWY AAK133 PRE 14 PRE 14 ROW 60'COAAK13325kVA 120/240V (C) ROW 50'COAFW238ROW 60' 20' 10' 25'ROW 50' 2604 DWY EOP 30' ROW 60' EOP 35' SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map 47.55, -122.176 Owner / Developer Contact Info officeATTN: KIET PHUNG 2610 LYNWOOD AVE NE RENTON, WA 98056 KIET PHUNG 425-444-0747 OVERHEAD CIRCUIT MAP ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE PRE-14 06/2020 391 443 417 --3.65 391 443 420.65 FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. CIRCUIT FEET ADDED: 0' 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 3716 SQ.FT. 200AMPS GAS 25 KW 140A 1.8% 3.9% 8. 9. SCALE: 1" = 50'105096480THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) HP Svc/MSA Distribution NOTIF# PWR PROJECT PHASE CABLE TV PHONE GAS E-Mail: Cell Phone: Project Manager Contact Information: Manager:JENNY CHAU 253-208-9480 JENNY.CHAU@PSE.COM Service Stubs UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP JENNY CHAU 253-208-9480 12/16/20 ANN BETTENCOURT 206-584-4182 12/16/20 --- ANN BETTENCOURT 206-584-4182 12/16/20 RW-120397 RENTON PHUNG RESIDENCE 1/O XFMR UPGRADE/NEW UG SVC 2604 LYNNWOOD AVE NE, RENTON, WA 98056 N/A N/A N/A 105095715 AS SHOWN 1/1 KING N/A N/A CSPSKEPM NW4-A2N-305 N/A N/A A2305E014 D2305E040 R2305E014 PRE-14 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 510312851 PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X X X Superior 105096480 510491190Service 104331575 CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS. -PROVIDE A 6' X 6' WORK PIT AT V01. -PROVIDE A 4' X 4' WORK PIT & 3/4" CUBIC YARD OF SAND AT M01. TRENCHING & CONDUIT. -INSTALL ± 300' OF 1-3" RED POLY SCH'L 80 PVC CONDUIT FROM V01 TO M01. -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . 00 1"2" 00 50'100' Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: V01 319090-166800 50kVA 6247100 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage V01 319090-166800 25kVA METER DETAIL @ M01 SCALE: NONE 32" Typical 24"Min 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36" Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Gas MeterAssembly 48" 4'8" Service (Permanent Detail:) Not to Scale Conduit EndsClosed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr Vent Utility Provided Seal 24"-36" SITE SPECIFIC NOTES AT V01: 319090-166800 -EXISTING VAULT TO REMAIN -EXISTING 25kVA 120/240v XFMR TO BE REMOVED, RETURN TO PSE YARD -EXISTING 6 POSITION CONNECTOR BARS TO BE REMOVED -INSTALL 50kVA 1Ø 120/240 TRF (MID:6247100) -INSTALL (3) 8-POS #10-350CMIL CONNECTOR BARS (MID #7651007) M01: AT "2604": NEW METER BASE -INSTALL 200A METER SPAN SPECIFIC NOTES V01 TO M01: -INSTALL 1-RUN #350 UG TPX, ± 300'________' ACTUAL -INSTALL 1-RUN 4/0 UG TPX, ± 10'________' ACTUAL PROJECT SCOPE -UPGRADE EXISTING XFMR -REPLACE CONNECTOR BAR -INSTALL PERMANENT UNDERGROUND SERVICE UNDERGROUND CIRCUIT MAP JOB SITE JOB SITE 50' R/WCL SCALE: NONE LOOKING EAST CROSS SECTION - NE 26TH CT PARTIAL PLAN DETAIL SCALE: 1" = 20' 00 1"2" 00 20'40' MFP21000432 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS