HomeMy WebLinkAbout0895.06 SWFR 274.pdf Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep.
AES
Project No.
0895.06
Page
1 of 4
Report No.
274
Time On Site
10:40
Time Off Site
11:10
Date
1/29/21
Day of Week
Friday
NPDES Permit No.
WAR-307963
Reviewed
CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Project Name
Weatherly Inn
Job Location
4500 Talbot Rd. S., Renton
Client/Owner
RJ Development, LLC
Erosion Control BMPs
(13 Elements)
Overall
Condition
(Good; Fair; Poor)
Needs
Repair?
(Yes; No)
Comments
1. Preserve Vegetation; Mark Clearing Limits
• Buffer Zones around Sensitive Areas
• Silt Fence G N N/A
2. Establish Construction Access
• Fabric; Quarry Spalls
• Wheel Wash
• Sweeper Truck
F Y -Light track out observed on road, street sweep
as needed
-Wheel wash is onsite
3. Control Flow Rates
• Stormwater Vault or Facility
• Straw Wattles
• Check Dams
G N N/A
4. Install Sediment Controls
• Silt Fence
• Straw Bale Barriers
• Vegetation
• Straw
• Sediment Ponds, Traps & Filters
• Treatment
• Sediment Pond (Temp. or Perm.)
• Water Truck
F Y -Repair silt fence in NW corner of site
-Silt fence was installed around majority of site
perimeter
5. Stabilize Soils
• Nets & Blankets
• Mulch, Bark & Rock
• Hydroseeding; Grass
• Plastic Sheeting
• Straw Stockpiles
• Stockpiles
• PAM
F Y
-Continue to place straw on exposed soils in
south western portion of site
-Cover stockpiles unworked for 2 days and before
weekends
6. Protect Slopes
• Benching; Track-Walking
• Pipe Slope Drains
• Plastic Sheeting; Anchors
G N -Straw wattles in place to divert water away from
western slopes
7. Protect Drain Inlets
• Catch Basin Inserts
• Gutter; Road
G
N
-CB inserts on road working as intended
8. Stabilize Channels and Outlets
• Channel Lining
• Check Dam
• Outlet Protection
• Nets and Blankets
G N N/A
9. Control Pollutants
• Chemical Storage Area Covered
• Concrete Handling
F Y -Continue to treat stormwater with dry ice to lower
the pH
10. Control Dewatering - - N/A
11. Maintain BMPs F Y See recommended notes
12. Maintain SWPPP & Site Logbook G N Available upon request
13. Protect Low-Impact Development (LID BMPs)
• Bioretention Rain Garden Facilities
• Permeable Pavement
- - N/A
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep.
AES
Project No.
0895.06
Page
2 of 4
Report No.
274
Time On Site
10:40
Time Off Site
11:10
Date
1/29/21
Day of Week
Friday
NPDES Permit No.
WAR-307963
Reviewed
CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Project Name
Weatherly Inn
Job Location
4500 Talbot Rd. S., Renton
Client/Owner
RJ Development, LLC
Monitoring, Records & Recommendations
Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? Yes No
List the completed, not-yet-completed, or ongoing action items in the table below:
Actions Items Completed?
(Yes; No; Ongoing)
Date
(If Completed)
Sweep site entrance when soil is seen on roadway O 1/28/21
Add straw to exposed soils in SW corner of site O 1/22/21
Repair silt fence in northwestern corner of site N
Current Weather: 43°F, Mostly Cloudy
Precipitation since last inspection (approximate): 0.65 inches
Precipitation in the last 24 hours (approximate): 0.17 inches
Was water quality sampling part of this inspection? Yes No
If “Yes”:
• Record results in the table below.
• Characterize the stormwater discharge, e.g., the presence of suspended sediment, “cloudiness”, discoloration, or oil sheen, if
present: Clear and colorless
• Hanna Turbidity Meter # 93703
Monitoring Location Turbidity
(NTU) pH Notes
Western Baker Tank 23.85 7
Eastern Baker Tank 24.35 7
Is the site in compliance with the SWPPP and the permit requirements? Yes No
If “No”:
• Indicate the tasks necessary to bring the site into compliance in the table above.
• Has the non-compliance been reported to the Department of Ecology? Yes No
• Should the SWPPP be modified? Yes No
“This report is true, accurate, and complete to the best of my knowledge and belief.”
Inspector Name: Alexandra Shaner CESCL Number: ECO-3-9272007 Inspection Date: 1/28/21
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep.
AES
Project No.
0895.06
Page
3 of 4
Report No.
274
Time On Site
10:40
Time Off Site
11:10
Date
1/29/21
Day of Week
Friday
NPDES Permit No.
WAR-307963
Reviewed
CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Project Name
Weatherly Inn
Job Location
4500 Talbot Rd. S., Renton
Client/Owner
RJ Development, LLC
w
BMP LEGEND
SILT FENCE
STOCKPILES
QUARRY SPALL ENTRANCE
BAKER TANK
WHEEL WASH
SWALE
SEDIMENT TRAP
WATTLE
Section of silt
fence to repair
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep.
AES
Project No.
0895.06
Page
4 of 4
Report No.
274
Time On Site
10:40
Time Off Site
11:10
Date
1/29/21
Day of Week
Friday
NPDES Permit No.
WAR-307963
Reviewed
CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Project Name
Weatherly Inn
Job Location
4500 Talbot Rd. S., Renton
Client/Owner
RJ Development, LLC
Photo 1: The section of silt fence requiring repair.