Loading...
HomeMy WebLinkAboutMFP19004173.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP19004173 IVR Number: 19004173 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:07/29/2019Application Date:0007200149Parcel Number: 375 RAINIER AVE S Permit Type:08/02/2019Issue Date:Franchise Permit Work Class:07/30/2021Expiration Date:Minor Utility Job Number: 101117205Franchise Type:Electric Description: REVISION: Raise conduit up 8" to 14" for clearance on new drain pipe. Restoration per City of Renton standards Traffic control to park vehicles in ROW for work on private property. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: BL.005109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 101117205 CORRIE RYDBERG (253) 234-6410 CORRIE.RYDBERG@PSE.COM 361 RAINIER AVE S Parking in city right of way at J01 (317776-165823) to remove and install PSE facilities/equipment ✔✔✔ Potelco, Inc. (253) 234-6410 POTELI#227PL BL005109 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.07.29 08:26:46 -07'00'7/29/19 MFP19004173 7/29/2019Nathan Janders Scott Warlick 8/2/2019 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 101117205 Potelco, Inc VAL BUZUNOV (425) 457-9938 6905 S 228th St, Kent, WA 98032 VAL.BUZUNOV@PSE.COM 361 RAINIER AVE S TBD TBD CORRIE RYDBERG 7/29/19 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.07.29 08:27:04 -07'00' MFP19004173 Monday - Friday 8:00AM - 3:00PM Scott Warlick 8/2/2019 SKETCH I -- NORTH -- I NOTES: •Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. •The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. •Approved Temporary Traffic Control Plan must be at the work site during work hours. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. •Total road closure lasting more than 24 hours is subject to the approval by the City Council. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. •The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). 1113 11 11111111 1111 1111111111192313 11 11 11 11 11 11 ONLYONLY1615151111 11 11 11 11 11 11 11 11 11 11 #361 RAIN IER AVE S SW SUNSET BLVD S 3RD P L ONL YONL Y1313 12JO11111 ONLYONLY1111 ROADWORKAHEADW20-1 350'RIGHT LANECLOSEDAHEADW20-5RW4-2LROADWORKAHEADW20-1350'ROADWORKAHEADW20-1350' ROAD WORK AHEAD W20-1350' BUSINESS(ES) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE ARRW-BRD N PSE PUGETSOUNDENERGY JOB#506097303 361 Rainier Ave S Renton WA 1st May, 2019 prachi.joshi@pse.com 425-424-7806 SHEET 1 of 1 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com (425)424-6425 TEMPORARY TRAFFIC CONTROL PLAN Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW UG/BOX/VAULTJO1 WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY ROW ROW MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 MFP19004173 D D D D D D D D D D D F317802-165827 317799-165828 317793-165825 317802-165818 317804-165805 U386317802-165805 U0382 317803-165805 317801-165805 25kVA 120/240V 317780-165838 112.5kVA 120/208V 317785-165834 317776-165806 317774-165814 317775-165832 317765-165835 317769-165839 317763-165841 "300" "330" "351" 317776-165823 "107" "111" S 3R D P L RAIN IER AVE SRAIN IER AVE S "330" EAR 17 317778-165801 300kVA 120/208V 317786-165812 300kVA 120/208V 500kVA 120/208V S 3RD ST S 3R D P L Curb Curb Curb Curb Curb 317776-165823 317786-165812 300kVA 120/208V 500kVA 120/208V 100' 100' 90°, R=5' NOTE: PSE TO PROVIDE AND INSTALL ALL PRIMARY CONDUITS. 100' 317776-165823 317786-165812 300kVA 120/208V 500kVA 120/208V 100' 100' 90°, R=5' NOTE: PSE TO PROVIDE AND INSTALL ALL PRIMARY CABLES. PSE TO INSTALL ±230' OF 1/0 AL JKT PRIMARY CABLES SITE PLAN Owner / Developer Contact Info officeATTN: CHICK-FIL-A, INC. 15635 ALTON PARKWAY, SUITE 350 IRVINE, CA 92618 DON IKELER 404-305-4407 101117205THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE EAR-17 2018 156 128 163 5.98 5.98 5.98 161.98 133.98 168.98 506097303 101117205 108110938 584044004 506894568 587029377 506894569 3000012300 PROJECT PHASE PWR NOTIF#ORDER# Superior Vault Removal UG Xfmr Removal Connect 3Ø Svc Set & Install Meter NOT TO SCALE UNDERGROUND CIRCUIT MAP POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" E-Mail: Cell Phone: Project Manager Contact Information: Manager:VAL BUZUNOV 425-457-9938 VAL.BUZUNOV@PSE.COM N Vicinity Map N/A SCALE: 1" = 50' UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP VAL BUZUNOV 425-457-9938 06/24/19 JUSTIN HANG 253-508-7880 06/24/19 N/A N/A N/A JUSTIN HANG 253-508-7880 06/24/19 RW-113382 CITY OF RENTON CHICK-FIL-A, INC. RELOCATE NEW PRI L/E, UPGRADE EX. XFMR, & SET 3Ø METER 361 RAINIER AVE S, RENTON, WA 98055 N/A N/A N/A 101117205 AS NOTED 1/2 KING COUNTY N/A N/A CSPSKEIN T23N, R05E, SEC 18 SE N/A N/A 2305E072 2305E076 2305E072NW EAR-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 3,647 SQ. 1200AMPS N/A 118KW 570A 1.0% 2.0% CIRCUIT FEET ADDED: 0'SPAN SPECIFIC NOTES J01 GRID NUMBER 317776-165823: -EXISTING VAULT TO REMAIN -REMOVE 3 - EXISTING 12kV ELBOWS W/ CABLE TAGS AØADM271, BØADM272, & CØADM273 -INSTALL 3 - 12kV ELBOW KITS (6041.1000, ELB10J) -INSTALL CABLE TAGS AØEIH678, BØEIH678, & CØEIH678 PV1 GRID NUMBER 317774-165814: -REMOVE EXISTING 504 SQUARE VAULT & EQUIPMENT V01 GRID NUMBER 317786-165812: -EXISTING 504 SQUARE VAULT TO REMAIN -REMOVE 3 - EXISTING 12kV ELBOWS W/ CABLE TAGS AØADM271, BØADM272, & CØADM273 -REMOVE EXISTING 300kVA 120/208V PADMOUNT XFMR -REMOVE EXISTING 4'8" X 5'6" X 6" COVER -INSTALL 8' SQUARE CONCRETE COVER W/ 24" X 60" ACCESS (MID: 9996109) -INSTALL 500kVA 120/208V PADMOUNT XFMR (MID: 6258250) -INSTALL 3 - 12kV ELBOW KITS -INSTALL CABLE TAGS AØEIH678, BØEIH679, & CØEIH680 -INSTALL 4 - 4POS #2 TO 500kCMILL CONNECTOR BARS (MID: 7651002) -INSTALL 12 - MOUNTING BOLTS (MID: 7651008) -CONNECT 4 - RUNS OF CUSTOMER PROVIDED, OWNED, & MAINTAINED 350kCMIL QUAD SVC M01: -PSE DEPARTMENT TO INSTALL 1 - 1200A CT'S & METER CUSTOMER DEVELOPMENT NOTES A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS. -CUSTOMER TO EXCAVATE AROUND VAULT COVER AND PROVIDE AN 11' X 11' OF CLEARANCE FOR NEW VAULT COVER AT V01. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. -IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. REMOVE PRIMARY CABLE TABLE CABLE NO. SAP EQUIP LOCATIONS CABLE (LF) EST EXISTING CABLE MFG. NAME EXISTING CABLE MFG. DATE CABLE REPLACED?FROM TO ADM271 11469487 J01 V01 260' ADM272 11469650 J01 V01 260' ADM273 11469651 J01 V01 260' TOTAL 780' Primary Cable & Conduit Table (Forman to Complete) LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE (gal.) From To Size (in) Qty Design Length (ft) Actual Length (ft) TYPE BENDS PULL (lbs) PULL Rev (lbs) Cable Size Design Length (ft) Actual Length (ft) CABLE NUMBERS MANUFACTURING INFORMATION DB120 90°45°22°11°A B C Manufacturer Compound Year Design As Built J01 V01 4 1 200 YES 1 ---1/0 AL 230 EIH678 EIH679 EIH780 DEDICATED FACILITIES SITE SPAN ADDITIONAL REMARKS LABOR UNITS #FROM TO FOOTAGE -J01 V01 200 DED. CONDUIT & WIRE 2-36, 2-55 V01 ---UPGRADE 300KVA TO 500KVA - TOTAL FT=200 CONDUIT DIAGRAM NOT TO SCALE CABLE DIAGRAM NOT TO SCALE JOB SITE JOB SITE JOB SITE MFP19004173 ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP VAL BUZUNOV 425-457-9938 06/24/19 JUSTIN HANG 253-508-7880 06/24/19 N/A N/A N/A JUSTIN HANG 253-508-7880 06/24/19 RW-113382 CITY OF RENTON CHICK-FIL-A, INC. RELOCATE NEW PRI L/E, UPGRADE EX. XFMR, & SET 3Ø METER 361 RAINIER AVE S, RENTON, WA 98055 N/A N/A N/A 101117205 AS NOTED 2/2 KING COUNTY N/A N/A CSPSKEIN T23N, R05E, SEC 18 SE N/A N/A 2305E072 2305E076 2305E072NW EAR-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A CUSTOMER-SUPPLIED TRENCH FOR PRIMARY CABLE SCALE: NONE Phone & TV Primary Power Cable Direct Buried or in PSE provided Excavated Dirt Pile Final Grade 24" Min 48" Max 18" Backfill for DB 120 Conduit/Direct Buried Cable 12" Min Separation 6" or 12" of sand, 5/8" minus 3" of sand, 5/8" minus, or clean backfill bedding JOINT TRENCH DETAIL 36" Min Cover ROADSIDE Typical To Excavated Dirt Pile (No Rocks over 10" Diameter) or clean backfill shading DB120 Grade Conduit Primary-Direct Buried or DB 120 (NTS) - A 6" layer of sand, 5/8" minus, or clean shading is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand, 5/8" minus, or clean shading is required when excavated native material contains rocks up to 10" in diameter. FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MIN. CLEARANCES FOR PADMOUNT TRANSFORMER & VAULT AT V01 CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 1.5' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA Not to scale 1.5' MIN 3' MIN 3' MIN 3' MIN 10' MIN3' MIN 6"6" MIN GUARD POST INSTALLATION MIN CONCRETE 2'-6" PAINTED YELLOW 3'-6" 6'-0" The following styles of guard posts are approved for Puget Sound Energy transformers: - 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete. The concrete shall have a minimum compressive strength of 3000 psi after 28 days. The exposed portion of the post shall be painted traffic yellow. - 6 ft x 9 in. diameter precast steel-reinforced concrete post. Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA. The exposed portion of the post shall be painted traffic yellow. LENGTH GUARD POST INSTALLATION AT V01 Not to scale 0700.1600-03 18" PAD & GUARD POST LOCATIONS XFMR FRONT GUARD POSTS 3' MIN MIN 5' MAX 5' MAX TYPICAL 3' MIN 5' MAX 5' MAX 5' MAX 18" MIN 5' MAX 5' MAX 5' MAX 5' MAX 5' MAX Cables should enter the vault so that all of the cables will lay in the same direction. TOP VIEW J- BOX CABLE ENTRY DETAIL Not to scale Excavation - 10-1/3 cubic yards SIDE VIEW Rock Crushed 6" 4'-4" 2" 4'-8" 3'-6" 4'-8" Not to scale 6045.5000-1 3,600 lbs VAULT & EXCAVATION DETAIL AT V01 8'-0"8'-0"8" 11' 11' TOP VIEW MFP19004173 PSE TO PROVIDED & INST. (1) 4" SCH80 GRAY PVC DISCONTINUOUS CONDUIT IN CUST. PROVIDE TRENCH 317776-165823 37.5 kVA 120/240V (A) 317802-165805 CUST. PROVIDED 40' X 4' WORKPIT SPARE SCH80 GRAY PVC CONDUIT 300 307 351 317802-165827 317799-165828 317793-165825 317802-165818 317804-165805 U386 317802-165805 U0382 317803-165805 317801-165805 25kVA 120/240V 317780-165838 112.5kVA 120/208V 317785-165834 317763-165841RAIN IER AVE S "361" 317778-165801 300kVA 120/208V S 3RD ST 317774-165814 317776-165823 317775-165832 317769-165839 317765-165835 100'EAR17317776-165823 37.5 kVA 120/240V (A) J J JPSE TO INST. 1-RUN 3PH 1/O SOL AL UG, ±320', INST. CABLE TAGS A#EIH048,B#EIH049,C#EIH050 317776-165823 37.5 kVA 120/240V (A) 317802-165805 N Vicinity Map N/A CUSTOMER-SUPPLIED TRENCH FOR PRIMARY CABLE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.101137099THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Excavated Dirt Pile Final Grade 24" Min Backfill for Schedule 40 Conduit (NO Rocks over 10" Diameter or foreign objects)Separation 12" Min 18" Min JOINT TRENCH DETAIL Primary-Schedule 80 (NTS) 48" Max 36" Min Cover Phone & TV Primary Power Cable in Customer Provided Schedule 80 Conduit ROADSIDE To Excavated Dirt Pile JOB SITE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT FEED ADDED: 0' 00 1"2" 00 50'100' FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 SITE PLAN SCALE: 1" = 50' POWER GENERAL NOTES - COMMERICAL PROJECT 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6.Roads shall be paved or have a compacted , crushed rock base in place. 7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8.All work is to be done in accordance with local municipal and county permit requirements as applicable. 9.Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. 10.Inclement weather conditions may cause delays in construction times and dates. 11.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE SCALE: NONE CONDUIT ONE-DIAGRAM SITE SPECIFIC NOTES: S01 - EXISTING #317802-165805 -EXISTING VAULT AND EQUIPMENT TO REMAIN -DISCONNECT PRI. CABLE #AGJ056,#AGJ057, #AGJ058 -INST. (3) 12KV ELBOW KIT PER STD 6041.1000 (ELB10J) -INST. CABLE TAGS #EIH048,#EIH049,#EIH050 V01 - EXISTING #317775-165823 -EXISTING VAULT AND EQUIPMENT TO REMAIN -DISCONNECT PRI. CABLE #AGJ056,#AGJ057, #AGJ058 -INST. (3) 12KV ELBOW KIT PER STD 6041.1000 (ELB10J) -INST. CABLE TAGS # EIH048,EIH049,EIH050 SPAN NOTE: S01 TO V01 -REMOVE 1-RUN OF 3Ø 1/O UG JKT CABLE, ±320' _____' ACTUAL -BREAK SCH80 CONDUIT AND RAISE 8" TO 14" TO 12" CLEARANCE NEW DRAIN PIPE - BREAK SPARE SCH80 CONDUIT AND RAISE 8" TO 14" TO 12" CLEARANCE NEW DRAIN PIPE -PSE TO INSTALL SCH80 GRAY PVC DISCONTINUOUS CONDUIT TO PROPER DEPTH TO MAINTAIN PROPER MIN. 12" CLEARANCE OF NEW DRAIN PIPE. -INST. 1-RUN OF 3Ø 1/O UG JKT CABLE, ±320' _____' ACTUAL - INST. CABLE TAGS # EIH048,EIH049,EIH050 DEVELOPER & CUSTOMER NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS TRENCHING -CUSTOMER TO PROVIDE 40' X 4' TRENCH TO MODIFY EXISTING CONDUITS FROM @ V01 -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. JOB SITE READINESS -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. -IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR WSDOT, A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . UNDERGROUND CIRCUIT MAP SCALE: 1" = 100' SCALE: NONE CABLE ONE-DIAGRAM Superior ORDER#NOTIF# PWR PROJECT PHASE PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" 101137099510865473 108127222 594141417 N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager: Tin.Nguyen@pse.com (253) 244-4303 Tin Nguyen UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP SIGNATURE Fabian Gomez 206-573-0031 12/05/19 Justin Hang 253-508-7880 12/05/19 N/A N/A N/A Justin Hang 253-508-7880 12/05/19 RW-113382 CITY OF RENTON CHICK-FIL-A, INC. MISC UG 361 RAINIER AVE S, RENTON, WA 98055 N/A N/A N/A 101137099 AS NOTED 1/1 KING COUNTY N/A N/A CSPSKEIN T23N.R05E.SE18 N/A N/A 2305E072 2305E076 2305E072NW EAR-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Owner / Developer Contact Info officeATTN: CHICK-FIL-A, INC. 15635 ALTON PARKWAY, SUITE 350 IRVINE, CA 92618 DON IKELER 404-305-4407 Cable Removal Misc UG