HomeMy WebLinkAboutMFP21000604.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP21000604
IVR Number: 21000604
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:02/10/2021Application Date:7227801075Parcel Number: 2715 SUNSET LN NE, APT
Permit Type:02/12/2021Issue Date:Franchise
Permit Work Class:02/14/2022Expiration Date:Minor Utility
Job Number: 105096747Franchise Type:Electric
Description: Puget Sound Energy Electric Potelco to install schl80 conduit and UG primary line extension from J01 (318503
130685) to private property in customer provided trench. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Contact
COLPITTS SUNSET LLC 2256 38TH PL E
SEATTLE , WA 98112
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
MFP21000604
Scott Warlick CED 2/12/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
2020NE SUNSET BLVDN
E
S
U
N
S
E
T
B
L
V
DHARRINGTON AVE NE17
171011 1211101011121110BUSSTOPNE 10TH STNE SUNSE
T
B
LVD1011121110
BUSSTOPSHELL STATIONBU
S
ST
O
P1111SUNSET
LN
NEHARRINGTON AVE NETHE CREW SHALL CEASEWORK FOR A FLAGGER/SPOTTERTO ESCORT PEDESTRIANSAROUND THE WORK AREA11
11J01V01STOPFLAGGERSTOPFLAGGERSTOPFLAGGERW20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100
'
10
0
'
10
0
'
W20-7A100'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-435
0
'
35
0
'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4350'350'ROADWORKAHEADW20-1 W20-4ONE
LANEROADAHEAD100'100'TEMPORARY TRAFFIC CONTROL PLANPSEPUGETSOUNDENERGYJOB#1050967472715 Sunset Ln NE, Renton, WA 980561/27/2021safaa.alneema@pse.com(425) 398-6077SHEET 1 of 128" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPVAULTVaultWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NPuget Sound EnergyTraffic Control Supervisor:Safaa Al NeemaCard No. 012611Card Exp. 10/31/2024Safaa.alneema@pse.com(425)398-6077MFP21000604Contractor shall maintain means for safe pedestrian accessalong Harrington into the park. Coordinate with SunsetTerrace project to the east regarding sidewalk and roadclosures. Under no circumstance shall pedestrian accessalong Harrington be fully blocked
2801
SUN
S
ET L
N
NE
2680
NE SUNSET BLVD (SR-900)2705
EXISTING
500KVA XFMR
HARRINGTON
AVE
NE
50KVA 120/240v
PRE
11
PRE
11
ROW
100'
ROW
50'
ROW
63'
2715
2715
NEW
25kVA 120/240V (A)
SITE PLAN
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
OAK HILLS CONSTRUCTION, LLC.
901 ALGONA BLVD N, STE A
ALGONA, WA 98001
RYAN COVINGTON 253-218-2288
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PRE-11
06/2020
224.00 231.00 260.00
3.76 0.00 0.00
227.76 231.00 260.00
GAS
PHONE
CABLE TV
510840778 594541115
510840779 3001226643
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
UG Temp Svc
Meter 200A 120/240v
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:TIN NGUYEN
253-244-4303
TIN.NGUYEN@PSE.COM
CUSTOMER-SUPPLIED TRENCH FOR PRIMARY CABLE
SCALE: NONE
SCALE: 1" = 50'105096747THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
T.NGUYEN 253-244-4303 2/2/21
A.DEREMIAH 206-247-1049 2/2/21
N/A N/A N/A
A.DEREMIAH N/A N/A
RW-RENTON
SUNSET TERRACE LAYDOWN AREA TEMP 2
SET 1Ø PM TRF, UG L/E & CONNECT TEMP SVC
2715 SUNSET LN NE # TEMP2, RENTON, WA 98056
N/A N/A
N/A 105096747
AS NOTED 1/2
KING N/A N/A CSPSKEPM
NW 9-23N-05E N/A N/A
2305E034 2305E040 2305E034 PRE-11
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
105096747510622995
Excavated Dirt Pile
Final Grade
24" Min
Backfill for Schedule 40 Conduit
(NO Rocks over 10" Diameter
or foreign objects)Separation
12" Min
18" Min
JOINT TRENCH DETAIL
Primary-Schedule 40 (NTS)
48"
Max
36"
Min
Cover
Phone & TV Primary Power Cable
in Customer Provided
Schedule 40 Conduit
ROADSIDE
To Excavated Dirt Pile
UNDERGROUND CIRCUIT: MAP #2305E034
SCALE 1" = 100'
JOB SITE
OVERHEAD CIRCUIT: MAP #2305E040
SCALE 6" = 1 MILE
JOB SITE
JOB SITE
CIRCUIT FEET ADDED:
SQ. FOOTAGE:
PANEL SIZE:
HEAT TYPE:
EST. DEMAND:
LRC:
% V. DROP:
% FLICKER:
30'
N/A
200A
ELECTRIC
21.1kW
65A
1.7%
1.5%
SITE SPECIFIC NOTES
J01 GRID NUMBER 318512-166685 (EXISTING):
-EXISTING VAULT & EQUIPMENT TO REMAIN
-INSTALL (1) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J)
-INSTALL CABLE TAG AØ-EIB779
V01 GRID NUMBER 318503-130695 (NEW):
-INSTALL (1) CONCRETE PAD FOR TEMP TRF W/ GROUNDS PER DESIGN STD 6315.1000
(MID: 7807901)
-INSTALL (1) 25kVA 120/240V PADMOUNT TRANSFORMER (MID: 6247000)
-INSTALL (1) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J)
-INSTALL CABLE TAG AØ-EIB779
-INSTALL (1) 12kV DUST CAP (MID: 7630600)
-INSTALL (3) 6-POS #6-350kCMIL SECONDARY CONNECTION BLOCKS (MID: 4842001)
-CONNECT 1-RUN CUSTOMER OWNED, INSTALLED & MAINTAINED 4/0 AL TPX SVC
-INSTALL GRID# 318503-130695
M01 (NEW TEMP METER BASE):
-INSTALL (1) 200A 120/240V METER
SPAN SPECIFIC NOTES
J01 - V01:
-INSTALL 1-2" SCHL80 GREY PVC CONDUIT, ± 30', ____' ACTUAL
-INSTALL 1-RUN 1/0 AL JKT PRIMARY CABLES, ± 60', ____' ACTUAL
PROJECT SCOPE
INSTALL UG PRIMARY EXTENSION AND PM TRANSFORMER FOR TEMP SERVICE
CUSTOMER DEVELOPMENT NOTES
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO
STARTING ANY SITE WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION &
RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
WORK PITS.
-PROVIDE A 4' X 4' WORK PIT & 1 CUBIC YARD OF SAND AT J01.
-PROVIDE A 6' X 6' WORK PIT & 6" BEDDING OF OF 5/8" CRUSHED ROCK AT V01.
TRENCHING.
-PROVIDE TRENCH FROM J01 TO V01.
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND
LOCAL MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS
MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS,
VAULTS & TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF
CONSTRUCTION TO COMPLETE BACKFILLING.
-IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE
PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER
WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY
EXCAVATION OR INSTALLATION BEGINS .
FOREMAN MUST FILL IN
YEAR MANUFACT:
CABLE #:
MANUFACTURER:
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (PM)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
25kVA 120/240v
6247000
V01
318503-130695
EXCAVATION & FILL SITE PREPARATION
SCALE: NONE
Oil-Filled Equipment Clearances
propane bulk dispensing tanks, and emergency generator
gases. (For example service station gas pumps and tanks,
Facilities used to dispense or store hazardous liquids or
The water's edge of a swimming pool or any body of water.
reduced flammability oil.
Combustible walls (when the transformer is filled with
vents, fire escapes, and other building openings.
Combustible walls (including stucco), doors, windows,
Fire sprinkler valves, standpipes, and fire hydrants.
does not have doors.
stone) providing the side of the transformer facing the wall
Non-combustible walls (including brick, concrete, steel and
If the oil-filled equipment is adjacent to…
Padmount transformers and structures
Clearances Between…
fueling points, etc.)
The metal portion of the transformer
closest to the building or structure
Must be measured from…
15 ft
20 ft
3 ft
PSE Std. 6315.0002
6 ft
10 ft
Clearance
Requirement is
3 ft
MFP21000604
Contractor shall maintain means for safe pedestrian access along
Harrington into the park. Coordinate with Sunset Terrace project to
the east regarding sidewalk and road closures. Under no circumstance
shall pedestrian access along Harrington be fully blocked
RESTORATION PER CITY OF RENTON STANDARDS
NEW 7' X 7' X 4'
500KVA XFMR
+ 30'
CUSTOMER TO TRENCH FROM J01 TO V01.
PSE PROVIDED & INSTALLED
1-2" SCH80 CONDUIT FROM J01 TO V01 ± 30'.
PSE INSTALL 1/0 AL JKT PRIM CABLE, ± 60'.
AØ-EIB779
CUSTOMER TO PROVIDE
6' X 6' WORK PIT
W/ 6" BEDDING OF CRUSHED ROCK
CUSTOMER TO PROVIDE
4' X 4' WORK PIT 105096747THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
T.NGUYEN 253-244-4303 2/2/21
A.DEREMIAH 206-247-1049 2/2/21
N/A N/A N/A
A.DEREMIAH N/A N/A
RW-RENTON
SUNSET TERRACE LAYDOWN AREA TEMP 2
SET 1Ø PM TRF, UG L/E & CONNECT TEMP SVC
2715 SUNSET LN NE # TEMP2, RENTON, WA 98056
N/A N/A
N/A 105096747
AS NOTED 2/2
KING N/A N/A CSPSKEPM
NW 9-23N-05E N/A N/A
2305E034 2305E040 2305E034 PRE-11
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
FILTER FENCE DETAIL
Not to Scale 0150.3200
CONDUIT & CABLE ONE-LINE DIAGRAM
SCALE: NONE
CONCRETE PAD DETAIL
SCALE: NONE
NEW 1-2" SCHL80 CONDUIT
EXISTING 1-4" SCHL80 CONDUIT
MFP21000604