Major Franchise Permit: MFP21000274
IVR Number: 21000274
Permit Information
Permit Name: Comcast Cable Franchise Permit
Address/Location:01/11/2021Application Date:3664500313Parcel Number: 6515 NE 4TH ST
Permit Type:01/19/2021Issue Date:Franchise
Permit Work Class:01/19/2022Expiration Date:Major Utility
Job Number: 516835Franchise Type:Cable
Description: Comcast to overlash fiber on existing aerial strand, proof and pull fiber through exisitng risers and conduit, place new
node.
Contacts
Name Address PhoneTypeBilling
Shannon Heaton
Cannon Construction
Applicant
Rhonda Resnik
Comcast
410 Valley Ave NW, Suite 12, Bldg C
Puyallup, WA 98371
B: (253) 864-4246Applicant
Michael Cannon
Cannon Construction Inc
406 Porter Way
Milton, WA 98354-9638
B: (253) 922-2787
C: (253) 588-4034
Contact
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
MFP21000274
Scott Warlick
This permit is for Major construction work in the ROW and will be billed at an additional
$60/HR for inspections. After hours and weekend work will be billed at $125/HR
2/17/2021
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 11/25/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 11/25/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.☐ A copy of the Traffic Control Plan (TCP) Application form.
2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
☐Include map(s) showing the location of the project and work area.
☐Be legible lettering and clear, contrasting, symbols of viewing or printing.
☐Must indicate street names, and north arrow and scale.
☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
☐Types of plans required:
☐Work hour plan – show all mobility impacts during construction hours.
☐Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
☐Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
☐Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
MFP21000274
Scott Warlick CED 2/17/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 11/25/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
•TCP must be approved prior to commencing the work, and all permit conditions shall be met.
•Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
•Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
•The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
•Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
•TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
•Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
•Approved Temporary TCP must be at the work site during work hours.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
•The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
SE 128TH STSE 128TH ST
WT
W21-7
TCP TO BE USED AT MULTIPLE
LOCATIONS ON SE 128TH AVE
R2-1
WORK AREA W21-7W20-5RW4-2R
FAS
W1-4L
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [AERIAL WORK] CONTROL TYPE: SINGLE CLOSURE 4-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANEWIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000516835WAKGCEH02900
SE 128TH ST & 196TH AVE SE
RENTON, WA 98059
TCP 1 8
12/22/2020 TH CK
COMCAST
N
MFP21000274
15608
15606
15612
12663
12654
12804
6515
6509
EOP EOP
EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFL FL
FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOP EOP EOP EOP EOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLSE 128TH ST
SE 128TH ST
SE 128TH ST
SE 128TH ST
156TH AVE SE156TH AVE SEWTWT
POLICE
OFFICER
WORK AREA
WT
R2-1
R2-1
W21-7W20-5RW4-2R
FASWORK AREAWORK AREA
W21-7 W20-7aW3-4
W21-7
W4-2L
W20-5L
FAS
W20-7a
W3-4
W20-7a W3-4
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [AERIAL WORK] CONTROL TYPE: SINGLE CLOSURE 5-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANEWIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000516835WAKGCEH02900
SE 128TH ST & 196TH AVE SE
RENTON, WA 98059
TCP 2 8
12/22/2020 TH CK
COMCAST
N
45
MFP21000274
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP156TH AVE SE156TH AVE SE156TH AVE SEW21-7
W21-7
W20-7a
W20-7a
FLAGGERFLAGGERW3-4
W3-4WTR2-1
WORK AREA
TCP TO BE USED AT MULTIPLE
LOCATIONS ON 156TH AVE SE
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [AERIAL WORK] CONTROL TYPE: SINGLE CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANEWIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000516835WAKGCEH02900
SE 128TH ST & 196TH AVE SE
RENTON, WA 98059
TCP 3 8
12/22/2020 TH CK
COMCAST
N
MFP21000274
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP156TH AVE SE156TH AVE SE156TH AVE SEWTW21-5
W21-7
W21-5
W21-7
R2-1
WORK AREA
TCP TO BE USED AT MULTIPLE
LOCATIONS ON 156TH AVE SE
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [AERIAL WORK] CONTROL TYPE: SHOULDER CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANEWIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000516835WAKGCEH02900
SE 128TH ST & 196TH AVE SE
RENTON, WA 98059
TCP 4 8
12/22/2020 TH CK
COMCAST
N
MFP21000274
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP156TH AVE SE156TH AVE SE156TH AVE SEEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPSE 132ND ST WTR2-1
WORK AREA
W21-7
W21-7
W20-7a
W20-7a
FLAGGERFLAGGERW3-4
W3-4
W21-7 W20-7a FLAGGERW3-4
WTTHE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [AERIAL WORK] CONTROL TYPE: SINGLE CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANEWIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000516835WAKGCEH02900
SE 128TH ST & 196TH AVE SE
RENTON, WA 98059
TCP 5 8
12/22/2020 TH CK
COMCAST
N
MFP21000274
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP156TH AVE SE156TH AVE SE156TH AVE SEEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPSE 133RD ST WTR2-1
WORK AREA
W21-7
W21-7
W20-7a
W20-7a
FLAGGERFLAGGERW3-4
W3-4
W21-7 W20-7a FLAGGERW3-4
WTWORK AREA
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [AERIAL WORK] CONTROL TYPE: SINGLE CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANEWIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000516835WAKGCEH02900
SE 128TH ST & 196TH AVE SE
RENTON, WA 98059
TCP 6 8
12/22/2020 TH CK
COMCAST
N
MFP21000274
EOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP
FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP156TH AVE SE156TH AVE SE156TH AVE SEEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP
NE 1ST ST
WTR2-1
WORK AREA
W21-7
W21-7
W20-7a
W20-7aFLAGGERFLAGGER
W3-4
W3-4
W21-7W20-7a
FLAGGERW3-4WT THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [AERIAL WORK] CONTROL TYPE: SINGLE CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANEWIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000516835WAKGCEH02900
SE 128TH ST & 196TH AVE SE
RENTON, WA 98059
TCP 7 8
12/22/2020 TH CK
COMCAST
N
MFP21000274
13436
13609
13456
13606
13527
0
0
156TH AVE SESE 2ND PL
SE 2ND PLEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOPFLFLFLFLFLFLFLFLFL
EOP EOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP
FLFLFLFLFLFLFL156TH AVE SEWTW21-5 W21-7
W21-5
W21-7
W21-5W21-7
W21-5
W21-7
R2-1
R2-1
R2-1
WORK AREA
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [AERIAL WORK] CONTROL TYPE: SINGLE CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANEWIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000516835WAKGCEH02900
SE 128TH ST & 196TH AVE SE
RENTON, WA 98059
TCP 8 8
12/22/2020 TH CK
COMCAST
N
MFP21000274
1 - COVER SHEET
2 -LEGEND
3 -GENERAL NOTES
4 -DETAILS
5-10 -DESIGNTHIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED CANNON COMPANIES
144 CT FIBER: 3261 FT + 20% STORAGE = 3914 FT
CONTACTS:
PROJECT MAP:
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
N
SCOPE OF WORK:
SHEET INDEX:
BILL OF MATERIALS*:
NEW AERIAL =
OVERLASH =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
RISER (0)=
TOTAL FOOTAGE =
0 FT.
2938 FT.
0 FT.
273 FT.
50 FT.
3261 FT.
PROJECT DESCRIPTION - ROW*
NEW BUILDING PATH WAY =
EXISTING BUILDING PATH WAY =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
TOTAL FOOTAGE =
0 FT.
0 FT.
0 FT.
0 FT.
0 FT.
PROJECT DESCRIPTION -SITE*
TOTAL PROJECT FOOTAGE =3261 FT.
- OVERLASH (1) 144CT FIBER ON EXISTING AERIAL STRAND
- A MINIMUM OF 200' STORAGE SHALL BE PLACED APPROX. EVERY 1500'
- PLACE NEW SPLICE CASE
- PROOF & PULL (1) 144CT FIBER THROUGH EXISTING RISERS
- PROOF & PULL (1) 144CT FIBER THROUGH EXISTING CONDUIT
- PLACE NEW NODE
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
COMCAST
CANNON COMPANIES
Cody Kainoa - (253)-753-7943 - ckainoa@cannonconstructioninc.com
COMCAST COMMUNICATION
Danny Cooley - (253)-215-7020 - Danny_Cooley@comcast.com
SE 128th Way & 156th Ave SE
Renton, WA 98059
WAKGCEH02900 2X2 off KE15A
JB#0000516835
MFP21000274
EDGE OF PAVEMENT
FOGLINE
POWER
COMMUNICATION
SEWER
DRAIN
DRAINAGE DITCH
GAS
WATER
TRAFFIC SIGNAL
TELCOM
STEAM
UNKNOWN UTILITY
RIGHT OF WAY
TRAFFIC CONES
PROPOSED NEW BORE
STRAW WATTLES
P
LT
CW
R
UTILITY POLE
VAULT - SMALL
PEDESTAL
STREET LIGHT
CROSSWALK LIGHT
UTILITY RISER
V VAULT - SMALL
444LA MANHOLE
VAULT - 25TA
CATCH BASIN
CATCH BASIN WITH SOCK
GLULAM UTILITY POLECENTER LINE
LANE LINE
FENCE
HIGH VISIBILITY FENCE
S SEWER MANHOLE
D DRAIN MANHOLE
W WATER MANHOLE
V UTILITY VALVE
SHRUBBERY
BORE PIT
VAULT - LARGE
VAULT - 25TA
C COMMUNICATION MANHOLE
FIRE HYDRANT
DISTANCE STATIONSTA 0+00
CONSTRUCTION NOTE CALLOUT#
X.X DISTANCE DIMENSION
ASPHALT SURFACE
CONCRETE SIDEWALK PANEL
CONCRETE ROADWAY PANEL
HF H-FRAME
VAULT - LARGE
C
CCAB CABINET
LEGEND
LANE DIRECTION INDICATOR
PROPOSED MARK-UP NOTATIONS RESTORATION TYPESEXISTING FEATURESLINE TYPES
A
7
LANDSCAPE
CROSS SECTION SYMBOL
CROSS SECTION NAME
CROSS SECTION SHOWN ON PAGE
FL FL
EOP
P P
TS TS
C C
D D
DD DD DD DD DD DD
G G
W W
T T
ST ST
ROW
S
UK
CB
CB
P P
V V V
V VV
WORK BEING DONE1LOCATION
PHOTO NOTE CALLOUT
#PHOTO LOCATOR SYMBOL
PROPOSED NEW TRENCH
PROPOSED NEW AERIAL STRAND
OF
DATE REVISION BY QC
CANNON COMPANIES
0000516835WAKGCEH02900
SE 128TH ST & 196TH AVE SE
RENTON, WA 98059
LEGEND 2 10
12/22/2020 TH CK
COMCAST
MFP21000274
OF
DATE REVISION BY QC
CANNON COMPANIES
0000516835WAKGCEH02900
SE 128TH ST & 196TH AVE SE
RENTON, WA 98059
GENERAL NOTES 3 10
12/22/2020 TH CK
COMCAST
MFP21000274
UTILITY POLE RISER -
STANDARD DETAIL
(1) 10' PVC CONDUIT
SECTIONS
15" HDG POLE BRACKET W/
PIPE CLAMP (B2017 BY
POWER-STRUT OR EQUAL)
4" MIN OFFSET FROM POLE.22' (TYP)(1) 10' PVC CONDUIT
SECTIONS
EXISTING SURFACE24' (TYP)PROPOSED CABLE
EXISTING AERIAL
POWER
EXISTING UTILITY POLEVARIES
2 #RISER PLACEMENT
STANDARD DETAIL
LOCATION
1
CONDUIT
UP TO 2 CONDUITS
STANDOFF BRACKET
15" MIN LENGTH
℄
℄
DIRECTION OF VEHICULAR TRAFFIC
PLAN VIEW
LOCATION
2
LOCATION
4
LOCATION
3
CONDUIT CLAMP
5" MIN
1
OF
DATE REVISION BY QC
CANNON COMPANIES
0000516835WAKGCEH02900
SE 128TH ST & 196TH AVE SE
RENTON, WA 98059
DETAILS 4 10
12/22/2020 TH CK
COMCAST
MFP21000274
15608
15606
15706
12644
15612
12663
12654
6613
6515
6509
EOP EOP EOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFL FL
FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLEOP EOP EOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FLFLFLFLFLFLFLFLFLFLFLFLFLSE 128TH ST
SE 128TH ST
SE 128TH ST
SE 128TH ST
SE 128TH ST
156TH AVE SE156TH AVE SEOWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:1 PSE
318092-167963
NEUTRAL 31 1 N/A
SECONDARY 30 0 N/A
STREET LIGHT 28 0 N/A
COMM #1 26 2 N/A
COMCAST #1 25 2 N/A
D
N
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:2 PSE
318092-167950
NEUTRAL 26 3 N/A
COMM #1 24 2 N/A
COMCAST #1 23 3 N/A
D
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:3 PSE
318093-167935
NEUTRAL 32 7 N/A
SECONDARY 31 6 N/A
COMM #1 23 2 N/A
COMCAST #1 21 11 N/A
D
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:4 PSE
318093-167914
NEUTRAL 26 11 N/A
SECONDARY 26 6 N/A
COMM #1 23 8 N/A
COMM #2 22 3 N/A
COMCAST #1 20 0 N/A
D
N
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:5 PSE
318083-167913
NEUTRAL 30 5 N/A
SECONDARY 28 11 N/A
COMM #1 25 7 N/A
COMM #2 24 11 N/A
COMM #3 23 9 N/A
COMCAST #1 22 5 N/A
COMM #4 21 4 N/A
D
N
N
N
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:6 PSE
318074-167913
NEUTRAL 25 0 N/A
COMM #1 21 5 N/A
COMCAST #1 21 2 N/A
COMM #3 20 1 N/A
COMM #2 20 1 N/A
COMM #4 18 11 N/A
D
N
N
N
N
N
N
215'
245'
200'
111'
63'
202'
COMM MAKE READY: LOWER COMM #1 TO 23'-2"
COMM MAKE READY: LOWER COMM #1 TO 22'-11"
COMM MAKE READY: LOWER COMCAST #1 TO 22'-5"
OVERLASH (1) 144CT FIBER
ON EXISTING AERIAL STRAND
OF
DATE REVISION BY QC
CANNON COMPANIES
0000516835WAKGCEH02900
SE 128TH ST & 196TH AVE SE
RENTON, WA 98059
DESIGN 5 10
12/22/2020 TH CK
COMCAST
N
MFP21000274
12820
13010
12816
12923
12804
13008
0
0FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFL
FLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP156TH AVE SE156TH AVE SE156TH AVE SEOWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:7 PSE
318058-167913
NEUTRAL 27 7 N/A
SECONDARY 26 8 N/A
COMM #1 22 6 N/A
COMM #2 22 1 N/A
COMM #3 21 1 N/A
COMCAST #1 20 0 N/A
TELCO #1 18 8 N/A
D
N
N
N
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:8 PSE
318049-167912
NEUTRAL 29 3 N/A
SECONDARY 28 2 N/A
COMM #1 23 11 N/A
COMM #2 22 10 N/A
COMCAST #1 22 2 N/A
COMM #3 21 2 N/A
D
N
N
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:9 PSE
318025-167912
NEUTRAL 25 10 N/A
SECONDARY 25 9 N/A
COMM #1 23 5 N/A
COMM #2 22 4 N/A
COMCAST #1 21 9 N/A
COMM #3 20 8 N/A
D
N
N
N
N
N
N
110'
217'
272'
OVERLASH (1) 144CT FIBER
ON EXISTING AERIAL STRAND
COMM MAKE READY: LOWER COMM #1 TO 22'-4"
COMM MAKE READY: LOWER COMM #2 TO 21'-9"
COMM MAKE READY: LOWER COMCAST #1 TO 21'-3"
OF
DATE REVISION BY QC
CANNON COMPANIES
0000516835WAKGCEH02900
SE 128TH ST & 196TH AVE SE
RENTON, WA 98059
DESIGN 6 10
12/22/2020 TH CK
COMCAST
N
MFP21000274
13110
15514
13128
15522
13016
13111
15430
0
SE 132ND ST FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP 156TH AVE SE156TH AVE SE156TH AVE SEOWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:10 PSE
317998-167911
NEUTRAL 29 0 N/A
SECONDARY 28 4 N/A
COMM #1 20 1 N/A
COMM #2 20 1 N/A
COMM #3 20 1 N/A
COMCAST #1 20 1 N/A
D
N
N
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:11 PSE
317968-167910
NEUTRAL 29 5 N/A
SECONDARY 29 0 N/A
COMM #1 25 4 N/A
COMM #2 24 3 N/A
COMCAST #1 23 6 N/A
COMM #3 20 7 N/A
D
N
N
N
N
N
N
297'
112'
OVERLASH (1) 144CT FIBER
ON EXISTING AERIAL STRAND
OF
DATE REVISION BY QC
CANNON COMPANIES
0000516835WAKGCEH02900
SE 128TH ST & 196TH AVE SE
RENTON, WA 98059
DESIGN 7 10
12/22/2020 TH CK
COMCAST
N
MFP21000274
13203
15429
13220
15510
13232
15503
13215
15437
15519
15518
15515
13204
15502
15511
0
156TH AVE SEFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOP EOP EOP EOP EOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFL156TH AVE SESE 133RD STSE 133RD ST 156TH AVE SEOWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:12 PSE
317957-167910
NEUTRAL 26 8 N/A
SECONDARY 26 3 N/A
COMM #1 24 3 N/A
COMM #2 23 5 N/A
COMCAST #1 22 4 N/A
COMM #3 20 10 N/A
D
N
N
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:13 PSE
317940-167908
NEUTRAL 29 5 N/A
SECONDARY 28 9 N/A
COMM #1 26 3 N/A
COMM #2 25 6 N/A
COMCAST #1 24 6 N/A
COMM #3 23 10 N/A
D
N
N
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:14 PSE
317910-167910
NEUTRAL 29 8 N/A
SECONDARY 26 8 N/A
COMM #1 26 0 N/A
COMM #2 25 1 N/A
COMCAST #1 24 2 N/A
COMM #3 23 7 N/A
D
N
N
N
N
N
N
167'
310'
POWER MAKE READY: RAISE SECONDARY TO 29'-4"
OVERLASH (1) 144CT FIBER
ON EXISTING AERIAL STRAND
COMM MAKE READY: LOWER COMM #1 TO 25'-5"
COMM MAKE READY: LOWER COMM #2 TO 24'-11"
COMM MAKE READY: LOWER COMM #1 TO 22'-11"
COMM MAKE READY: LOWER COMM #2 TO 22'-4"
COMM MAKE READY: LOWER COMCAST #1 TO 21'-11"
OF
DATE REVISION BY QC
CANNON COMPANIES
0000516835WAKGCEH02900
SE 128TH ST & 196TH AVE SE
RENTON, WA 98059
DESIGN 8 10
12/22/2020 TH CK
COMCAST
N
MFP21000274
King county's ROW. Please
seek approval from King
County for work in their ROW
King County/Renton
Boarder
13407
13325
13425
6322 6408
109
110
102
113
6407 6413
103
6316
105
6419
118
6504 6510 6516 6522 6600 6606
6607660165236517
13418
13426
13422
13434
6314
6311 6317
6323
6313
0
0156TH AVE SEUNDERWOOD PL NE FLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOP
EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLNE 1ST ST
NE 1ST ST
NE 1ST ST156TH AVE SE156TH AVE SE156TH AVE SER
25'
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:15 PSE
317892-167908
NEUTRAL 29 8 N/A
SECONDARY 26 6 N/A
STREET LIGHT 25 0 N/A
COMCAST #1 24 11 N/A
COMM #1 24 6 N/A
COMM #2 23 5 N/A
COMM #3 20 9 N/A
D
N
N
N
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:16 PSE
317984-167909
NEUTRAL 28 9 N/A
SECONDARY 26 9 N/A
STREET LIGHT 24 11 N/A
COMM #1 24 1 N/A
COMM #2 22 0 N/A
COMCAST #1 21 5 N/A
COMM #3 20 3 N/A
D
N
N
N
N
N
N
N
184'
88'
WAS NOT ABLE TO LOCATE VAULT DURING SITE
WALK. WILL NEED TO BE PROOFED PRIOR TO
CONSTRUCTION TO ENSURE CONTINUITY
TREE TRIMMING
PULL (1) 144CT FIBER
THROUGH EXISTING RISER
273'
OVERLASH (1) 144CT FIBER
ON EXISTING AERIAL STRAND
POWER MAKE READY: RAISE SECONDARY TO 27'-5"
POWER MAKE READY: RAISE SECONDARY TO 28'-3"
OF
DATE REVISION BY QC
CANNON COMPANIES
0000516835WAKGCEH02900
SE 128TH ST & 196TH AVE SE
RENTON, WA 98059
DESIGN 9 10
12/22/2020 TH CK
COMCAST
N
MFP21000274
13436
13609
13456
6570
6402
13606
6304
13527
13615
0
0 0
0
0
0
0
0
0
6601
6613
66076563
6569156TH AVE SESE 2ND PL
SE 2ND PLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOP
EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPFLFLFLFLFLFLFLFLFLFLFLFLFL
EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP
FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFL156TH AVE SER
25'
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:17 PSE
317846-167908
NEUTRAL 29 8 N/A
COMM #1 25 9 N/A
COMM #2 24 5 N/A
COMCAST #1 23 2 N/A
COMM #3 22 4 N/A
D
N
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:18 PSE
317828-167907
NEUTRAL 31 11 N/A
SECONDARY 30 9 N/A
STREET LIGHT 28 8 N/A
COMM #1 26 4 N/A
COMM #2 25 6 N/A
COMCAST #1 23 5 N/A
COMM #3 20 11 N/A
D
N
N
N
N
N
N
N
145'
OVERLASH (1) 144CT FIBER
ON EXISTING AERIAL STRAND
PULL (1) 144CT FIBER
THROUGH EXISTING RISER
WAS NOT ABLE TO LOCATE VAULT DURING SITE
WALK. WILL NEED TO BE PROOFED PRIOR TO
CONSTRUCTION TO ENSURE CONTINUITY
PLACE NEW NODE
OF
DATE REVISION BY QC
CANNON COMPANIES
0000516835WAKGCEH02900
SE 128TH ST & 196TH AVE SE
RENTON, WA 98059
DESIGN 10 10
12/22/2020 TH CK
COMCAST
N
MFP21000274
Comcast Cable Communications Management
410 Valley Ave NW
Suite 12 Bldg C
Puyallup, WA 98371
1/19/2021
City of Renton
1055 South Grady Way
Renton, WA 98057
RE: Aerial Variance Request for 0000516835
To whom it may concern:
Cannon Construction has been contracted to design and engineer this project on behalf of
Comcast Cable Communications Management. Comcast is applying for a variance request in
order to upgrade their existing facilities.
Comcast proposes to OVERLASH (1) 144CT FIBER ON EXISTING AERIAL STRAND AND PROOF &
PULL (1) 144CT FIBER THROUGH EXISTING CONUDIT
Comcast is requesting that the City of Renton approve this variance request based on the fact
that the requirements for undergrounding this proposed over-lash on existing plant will cause
undue hardship.
1. Installation of undergrounding facilities will increase the total cost of construction
roughly 15-25 times the amount of an aerial over-lash on the existing Comcast strand.
2. Risk of potential damage to underground facilities will be increased.
3. Over-lash will not cause substantial adverse impact to other persons or entities in the
immediate area. Over-lashing the cable will be accomplished in a few days, and the
residents will not notice any impact. Comcast will clean up the over-lashed spans as
necessary and identify and remove any existing dead cables along this route.
4. The variance is necessary to prevent any undue hardship due to the increased
construction costs if forced to install the proposed extension underground.
5. The granting of the variance will not be materially detrimental to the public welfare.
Comcast does agree to participate in future underground improvements for its
proportionate share of the undergrounding costs, waiving the obligation into the future
when all other utilities are undergrounded to prevent an undue hardship against
Comcast currently.
MFP21000274
Upon the granting of the variance, Comcast will coordinate construction and traffic control as
per your requirements. Comcast and their contractors want to cooperate at the highest level
and agree to adhere to all provisions and requirements set forth by the City of Renton to insure
safe installation and maintenance of the proposed facilities.
If you have any further questions regarding this project, please contact Rhonda Resnik.
Thank you for your consideration in this matter.
Rhonda Resnik
Permit Coordinator
Comcast Cable Communications Management
o 253-864-4246 | e Rhonda_Resnik@comcast.com
February 17, 2021
Rhonda Resnik
Comcast Cable Communications Management
410 Valley Ave NW
Puyallup, WA 98371
Via Email: Rhonda_Resnik@comcast.com
SUBJECT: Request for Undergrounding Exemption (JB#516835, MFP21000274, 6515 NE 4th St)
Dear Ms. Resnik:
The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal
Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required
to be installed underground, pursuant to the standards of the section of RMC.
Comcast proposes to have Cannon Construction, Inc. overlash 144ct fiber approximately 2,938 lineal feet
to existing Puget Sound Energy (PSE) poles within the City. Beginning at the pole on the southeast corner
of 15706 SE 128th St property, continuing west 660 lineal feet along the north side of NE 4th Street, then
south along west side of 156th Ave SE for 1,384 lineal feet before crossing into King County at the
southwest corner of 156th Avenue SE and SE 132nd Street. Overlashing crosses back into the City of Renton
at the pole to the southeast of property 15519 SE 133rd St on the west side of 156th Avenue SE and
continues for 272 lineal feet ending at the pole to the east of 13425 156th Ave SE property. Overlashing
continues again at the pole to the northeast of 13527 156th Ave SE for 145 lineal feet and ending at the
pole to the southeast of the same property.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5720
grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below,
through and across the streets, avenues and alleys of City of Renton within the right-of-way of Renton.
Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline service
providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility service
provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area are
underground, Grantee shall place its Cable System’s distribution cables underground within that area;
provided that such underground locations are actually capable of accommodating Grantee’s cable and
other equipment without technical degradation of the Cable Systems’ signal quality.
The proposal would utilize existing poles with other attached franchisee communication facilities and
overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need
to be provided for, any existing obsolete cable will need to be removed; staff recommends these as
conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast
Comcast Job JB#516835
Page 2 of 2
February 17, 2021
franchise agreement which allows new overhead facilities to be placed overhead provided there are other
similar providers overhead as well.
DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with the Comcast Franchise Agreement.
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical clearance
of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in
the future, at Comcast’s cost, when any one of the following events occurs: (1) any other utilities
are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee
within the Project Reach, in which case Comcast shall participate in the joint use trench
installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available
within the Project Reach that will accommodate the aerial lines. The new aerial lines must be
undergrounded within one year, or approved otherwise by the City of Renton Community and
Economic Development Administrator or designee, from the first event triggering the
requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, March 3, 2021. Due to Governor Jay
Inslee’s Proclamation 20-25 (“Stay Home, Stay Healthy”), the City Clerk’s Office is working remotely. For
that reason, appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov. The
appeal fee, normally due at the time an appeal is submitted, will be collected at a future date. Appeals to
the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal
process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. If the situation changes
such that the City Clerk’s Office is open when you file your appeal, you have the option of filing the appeal
in person.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Vanessa Dolbee, Planning Director
Justin Johnson, Assistant Development Engineering Manager
Scott Warlick, Engineering Specialist III
Holly Powers, Permit Technician
Franchise Permits
Shannon Heaton, Cannon Construction sheaton@cannonconstructioninc.com
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP21000274
Engineering
1 Engineering General Conditions
Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15’-6”.
2 Engineering General Conditions
Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
3 Engineering General Conditions
The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at
Comcast’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case
Comcast shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or
(3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and
Economic Development Administrator or designee, from the first event triggering the requirement to underground
the aerial lines.
4 Engineering General Conditions
A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
Page 1 of 1